AMERICAN INTERNATIONAL UNIVERSITY–BANGLADESH (AIUB) 
FACULTY OF SCIENCE & INFORMATION TECHNOLOGY 
  
INTERNSHIP AFFILIATION REPORT ON 
GENERAL ACTIVITIES OF SOUTHEAST BANK IT DEPARTMENT 
An Internship Report Presented to the 
OFFICE OF PLACEMENT and 
DEPARTMENT OF COMPUTER SCIENCE 
In Partial Fulfillment of the Requirements for the Degree of 
Bachelor of Science in Software Engineering 
  
Supervised By 
DEBAJYOTI KARMAKER 
Assistant Professor 
Department of Computer Science 
American International University­Bangladesh 
  
  
Submitted By 
Ahmed, Istiaque 
ID : 10­16592­2 
DEPT : Software Engineering 
   
Date of Submission: 
  
 
 
 
1 
LETTER OF TRANSMITTAL 
 
October 28th, 2013 
DEBAJYOTI KARMAKER 
Assistant Professor 
Department of Computer Science 
American International University­Bangladesh 
 
Sub: Submission of Internship Report.  
 
Dear Sir,  
 
I take the pleasure to submit my report titled “GENERAL ACTIVITIES OF SOUTHEAST BANK 
IT DEPARTMENT”. As per requirement of SE, I have completed the Internship in 
Southeast Bank Limited. 
In this report, I tried to summarize I have tried to exert all the knowledge that I gathered through 
my 
Working with IT dept. of SEBL. Working for three months in the Southeast Bank Limited, 
Motijheel  Branch helped me to fulfill the requirements of obtaining practical learning and 
subsequently . My internship in Southeast Bank Limited was a worthwhile experience and the 
exposure of such an organization would be valuable for me. Before facing the real Information 
technology  world, I have gathered prior knowledge about the organization culture and 
technology use. 
prepare of this report. 
Yours sincerely, 
  
  
______________________ 
Ahmed, Istiaque 
ID: 10­165952­2 
August 18, 2013 
  
 
 
 
2 
  
   
Letter of Endorsement 
The Internship Affiliation Report entitled “GENERAL ACTIVITIES OF SOUTHEAST BANK IT                     
DEPARTMENT”, has been submitted to the Office of Placement and Department of Computer                         
Science in partial fulfillment of the requirements for the degree of Bachelor of Science (Bsc.) in                               
Software Engineering by Ahmed, Istiaque ID# 10­16592­2. The report has been accepted and                         
may be presented to the Internship Defense Committee for evaluation. 
(Any opinions, suggestions made in this report are entirely that of the author of the report. The                                 
University does not condone nor reject any of these opinions or suggestions.) 
  
  
  
  
  
  
_______________________ 
DEBAJYOTI KARMAKER 
Internship Supervisor 
Assistant Professor 
Department of Computer Science 
American International University­Bangladesh 
  
  
  
  
  
  
  
  
  
  
  
  
  
  
 
 
 
3 
  
  
  
Acknowledgement 
At the very beginning, I would like to express my gratitude to Almighty Allah for whose  
kindness I am enough sound mentally and physically to prepare this report. Then I must express  
my deep gratitude to my University supervisor, ​DEBAJYOTI KARMAKER,​ Assistant Professor 
Department of Computer Science, American International University­Bangladesh for his 
guidance and instructions in conducting the internship program successfully 
. 
I am also thankful to my organization supervisor Shafquat Hassan Khan​ ​and 
I feel proud and gratified that I was always held the under supervision of the Hardware and                                 
procurement and got advices directly from Md. Mahbubur Rashid. Here, with daily reporting                         
along with mental and professional support enhances my experience in the internship life. 
During the preparation of the project work I have came to the very supportive touch of different 
individuals (respondents & seniors from SEBL) and friends, who lend their ideas, time and 
caring guidance to amplify the report’s contents. To be true to myself I must say that without 
their help it would be very hard for me to prepare such report. I am thankful to them with all of 
my feelings.  
  
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4 
 
Table of Contents 
  
LETTER OF DECLARATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  II 
LETTER OF APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . III 
ACKNOWLEDGEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .IV 
I ­ TITLE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . VI 
II ­ INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . VI 
a. Rationale. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . VI 
b. Background. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . VI 
c. Objectives. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .VII 
III­ACTIVITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . VII 
 
a. Work­Related . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .VII 
b. Organization­wide. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . VIII 
IV – CONSTRAINTS/CHALLENGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . IX 
a. Identified/Observed in the Organization . . . . . . . . . . .  .  . .. . . .. . . . . . . . . . . . . . . IX 
b. Academic Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .XI 
V ­ ACQUIRED KNOWLEDGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XII 
 
a. Implications to Organization/Company . . .  . . . . . . . . . . . . . . . . . . . . . .. . . . . . .XVIII 
b. Implications to University’s Internship Program . . . . . . . . . . . . . . . . . . . . . . . .  XVIII 
VI ­ CONCLUDING STATEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XIX 
 
a. Recapitulation /Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XIX 
b. Recommendations for Future Strategic Actions  . . . . . . . . . . . . . . . . . . . . . . . . . . . .XIX 
VII­SUGGESTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XX 
Recommendation Letter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XXI 
References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . XXII 
 
  
 
 
 
 
 
 
 
 
 
 
5 
 
I – TITLE  
General activities of Southeast Bank IT department. 
II – INTRODUCTION 
Internship experience plays a vital role for every student to implement their theoretical 
knowledge and get a practical knowledge from any organization. This report is prepared 
as partial requirement of the three­month internship program for the SE students o f UB. 
Southeast Bank Limited has given me the opportunity to complete internship program. In 
the report I have mainly given concentrate on “General activities of Southeast Bank IT 
department.”. Information has taken from bank’s website, Annual report, questionnaire fill 
up and discussing with the employees. Finally I prepared this report under the 
supervision of DEBAJYOTI KARMAKER Assistant Professor. 
 
 
a. ​Rationale of the Study 
With the growing competition among nationalized, foreign and private commercial banks as to 
how the banks operates it banking operation and how customer service can be made attractive. 
Commercial or private banks are trying to evaluate their traditional banking service to a better 
standard, to meet the challenging needs. So they pay attention on better performance and 
existence. Under the above circumstances, it has become necessary for Southeast Bank 
Limited, one of the private commercial banks, to focus its attention towards the improvement, 
who are actually executing the policies undertaken by the top management will have a chance 
to communicate their feelings and will have the feedback about their dealings from the 
customer. 
 
b.  ​BACKGROUND 
BACKGROUND OF SOUTHEAST BANK LIMITED 
Southeast Bank Limited is a second­generation bank that was established in 1995 with a dream                             
and a vision to become a pioneer banking institution of the country and contribute significantly to                               
the growth of the national economy. The Bank’s journey began when it was incorporated as a                               
Public Limited Company on March 12, 1995. The Registrar of joint stock companies and firms                             
issued the certificate of commencement of Business of the Bank on the same date. The                             
Southeast Bank received its Banking License from Bangladesh Bank on March 23, 1995. The                           
Bank’s first Branch was opened by Late M. Saifur Rahman, the then Honorable Finance                           
 
 
 
6 
Minister of the Government of the People’s Republic of Bangladesh as the Chief Guest at the                               
commercial hub of the country at 1, Dilkusha commercial Aroa, Dhaka on May 25, 1995. 
In its arduous journey since, Southeast Bank has succeeded in realizing the dreams of those                             
who established it. Today it is one of the country’s leading banks in the private sector                               
contributing significantly to the national economy. The Authorized Capital of the Bank today is                           
Tk.10, 000 million. Its Paid­Up­Capital and Reserve reached Tk. 19,000.08 million as on                         
December 31, 2011. The Bank had 1, 848 staff of whom 152 were Executives, 1, 374 were                                 
Officers and 322 were other staff as on December 31, 2011. 
The Southeast Bank was established by leading business personalities and eminent                     
industrialists of the country with stakes in various segments of the national economy. They                           
established the Bank with a vision to bring efficient and Professional banking service to the                             
people and the business community of Bangladesh to help the national economy grow. The                           
incumbent chairman of the Bank is Mr. Alamgir Kabir, FCA, a professional Chartered                         
Accountant. The Bank’s Managing Director is Mr. Mahbubul Alam, an eminent banker of the                           
country with 44 years experience in both nationalized and local private sector banks to his                             
credit. 
The Bank’s operations are built upon unequivocal emphasis on effective corporate governance.                       
The objective is to create, promote and build long­term company value. The Bank’s first and the                               
highest priority is to provide effective services and maximum satisfaction to the customers. The                           
ethos of harmony and co­operation is widely practiced in the Bank. They take pride in the fact                                 
that the public and private face of the bank is one and identical. They believe that transparency                                 
in decision­making, monitoring mechanism and full disclosure to shareholders and regulatory                     
authorities are essential aspect of Bank’s corporate governance and that they create and                         
intense pressure to rationalize Bank’s services and search for new competitive advantages.                       
They work ceaselessly within these parameters.A team of efficient professionals managers the                       
Bank. They create and generate an environment of trust and discipline that encourages                         
everybody in the Bank to work together for achieving the objectives of the Bank. The culture of                                 
maintaining congenital work­environment in the Bank has further enabled the staff to benchmark                         
themselves better against management expectations. A commitment to quality and excellence                     
in service in the hallmark of their identity. 
Southeast Bank has become a synonym of quality banking services and products. It has a                             
diverse array of products and services tailored carefully to cater to the needs of all segments of                                 
customers. They are operational strategies are structured to address the special and often                         
complex needs of the customers. In the growth graph, the Bank has generated profit of Tk.                               
1,912.19 million after prevision and income tax in the year 2011. The curve keeps soaring                             
upward everyday making it one of the leading and most successful banking institutions in                           
Bangladesh with a total asset base of Tk. 158,074.59 million as on December 31, 2011.  
 
 
 
7 
 
Core Values of SEBL 
Integrity 
Respect 
Fairness 
Harmony 
Team Spirit 
Courtesy 
Commitment 
Service Excellence 
Insight and Spirit 
Enthusiasm for Work 
Business Ethics 
Core Strength of SEBL 
Professionally strong Board of Directors 
Strong Capital Base 
Transparent and Quick Decision Making 
Efficient Team of Performers  
Satisfied Customers  
Internal Control  
Skilled Risk Management 
Diversification 
 
 
 
8 
Quality customer Service 
Unique corporate Culture  
Sharp bifurcation between Board and management functions 
Strong asset base 
 ​Competencies of SEBL 
Knowledge 
Experience and Expertise 
Customer Orientation/ Focus 
Transparency  
Determination  
Zeal for improvement 
Pursuit of Disciplined Growth Strategies 
Reliability  
Mission and Vision of SEBL 
Mission is the prime purpose of a firm. It makes goal more transparent to the people related to it                                     
and shows them path to reach to that destination. Again, Oxford Dictionary describes vision as                             
“imaginative insight”. It is the long term goal of an organization. From this, we can assume how                                 
much these two are important for the successful operation of a firm. It is said, “Mission without a                                   
vision is a daydream and vision without a mission is a nightmare”. 
Southeast Bank Limited is a third generation bank. They mainly emphasize on the excellence                           
and starving to develop a new horizon of banking. Their aim is to make a difference in banking                                   
sector. The missions and visions are as follows:   
Mission of SEBL 
High quality financial services with state of the art technology 
Fast customer service 
 
 
 
9 
Sustainable growth strategy 
Follow ethical standards in business 
Steady return on shareholders equity 
Innovative banking at a competitive price 
Attract and retain quality human resource 
Commitment to Corporate Social Responsibility 
Vision of the Bank 
“To be a premier banking institution in Bangladesh and contribute significantly to the national                           
economy”   
 
 
 
Corporate Profile​ : 
Name of the Organization  :  Southeast Bank Limited 
Logo  :   
Date of Incorporation  :  March 12,1995  
Chairmen  :  Mr.Alamgir Kabir (FCA) 
Authorized Capital  :  Tk.10,000 million 
 
 
 
10 
Paid up Capital  :  Tk.873.28 million 
Line of Business  :  Banking 
Slogan  :  “​a bank with vision​” 
Target Customers  :  Individual and Corporate customers 
Total assets  (As on 31.12.2013)  :   Tk  220,930.85 million 
Total deposits (As on 31.12.2013)  :  Tk  17,7510.00 million 
Net  Profit after Tax and Provision  (As
31.12.2013) 
:  Tk 3378.82 million 
Principal branch  :  Eunoos Trade Centre 
52­53, Dilkusha C/A (level 2,3&16) 
Dhaka­1000 
No of Branches     :  115 
Total no of Employee as on 2013  :  4579 
Phone  :  9571115, 7160866, 7173793, 
9555466 & 9550081 
 
 
 
11 
Fax  :    9550086, 9550093 and 9563102 
SWIFT  :  SEBDBDDHXXX 
E­mail      :  info@southeastbank.com.bd 
Website  :  https://www.southeastbank.com.bd/ 
 
c. Objectives 
Objectives of Southeast Bank Limited (SEBL) 
Southeast Bank Limited aims at excellence and is committed to explore a new horizon of                             
banking and provide a wide range of quality products and services comparable with those                           
available with any modern bank in the world. The objective of SEBL is not only to earn profit but                                     
also to keep the social commitment and to ensure its cooperation to the person of all level.                                 
There are two type of objective of SEBL. These are given below:  
Strategic Objectives 
• To achieve positive Economic Value Added (EVA) each year. 
• To be market leader in product innovation. 
• To one of the top three Financial Institution in Bangladesh in terms of cost efficiency. 
• To be one of the top five Financial Institutions in Bangladesh in terms of market share in                                 
all significant market segments are serve. 
Financial Objectives 
• To achieve a return on shareholders’ equity of 20% or more on average. 
 
 
 
12 
• So SEBL is committed to maintain the highest quality of services by upgrading banking                           
technology and by applying high standard of business ethic through its established commitment                         
and heritage.   
Role of Information Technology 
Information technology is working as a principle role in the global economy. IT gives great                             
benefit to have the facility to provide information world­wide great benefit to have the facility to                               
provide information world­wide. It will be the dynamics form of the new era. Today, the IT gives                                 
communication and methodical power that organizations need to implement trade and                     
management companies globally with much comfort. Because of the present development of                       
information technology they can synchronize their worldwide network of suppliers, distributors                     
and customers, organizations have developed the global information system that a business                       
can run automatically with the time. IT denotes the communication of hardware and software                           
used depending on the requirement of the enterprise. And this how information technology plays                           
an important role in the present world. 
 
 
III – ACTIVITIES  
In South east bank it department there are different type of working team  like Bank Ultimus 
team, Network operation team, In­house software team, Procurement & hardware Support 
Team. 
 
a.  ​Work­Related​ ​: As i discuss before a bank it have different team. I work with Procurement 
and hardware team, and get little knowledge about Data Center and Disaster Recovery (DR). 
1. Procurement​:  
 ​Procurement is the acquisition of goods, services or works from an outside 
external source. It is favourable that the goods, services or works are appropriate 
and that they are procured at the best possible cost to meet the needs of the 
acquirer in terms of quality and quantity, time, and location. 
2. Hardware​ : 
 ​Hardware, in the computer world, refers to the physical components that make 
up a computer system.There are many different kinds of hardware that can be 
installed inside, and connected to the outside, of a computer. In bank it hardware 
 
 
 
13 
team maintains computer hardware, keep all kind of hardware information, 
decided new requirement, change old hardware at right time.  
3. Data center ​: 
 A data center is a facility used to house computer system and associated 
components such as telecommunications and storage system. It generally 
includes redundant or backup power supplies, redundant data communications 
connections, environmental control (e.g. air condition, fire suppression) and 
security device. Large data center are industrial scale operations using as much. 
Electricity as a small town. 
● Power 
● Cooling 
● DR 
● Automatic fire extinguishing system 
● Server 
● Access control 
 
Data center Architecture: 
 
 
 
14 
 
 
 
Power supply in DC: 
Power is a primary resource. Many instances of downtime are the result of power 
problem. Power supply should be kept free of interruption or distortion. Servers should 
be insulated against potential electrical problems. It is important to provide a separate 
power source for the data center. 
Diagram 1: 
 
 
 
 
 
 
 
 
15 
Diagram 2: 
 
Diagram 3: 
 
 
 
 
16 
 
Cooling : 
 Data center heat removal is one of the most essential yet least understood of all critical 
IT environment processes. As the latest computing equipment becomes smaller and 
uses the same or even more electricity than the equipment it replaced, more heat is 
being generated in data centers. Precision cooling and heat rejection equipment is used 
to collect and transport this unwanted heat energy to the outside atmosphere. 
 
Automatic fire extinguishing system : 
A small fire in data centers can result in catastrophic loss by interrupting vital operations 
and damaging high­value equipment. In these situations, it's important that fires be 
knocked down quickly ­ before they have a chance to spread ­ and that sensitive 
electronics and other equipment not be damaged in the process of putting out the fire. 
 
 
 
17 
 
SERVER :  
A server is a computer that provides data to other computers. It may serve data to 
systems on a local area network (LAN) or a wide area network (WAN) over the Internet.  
Many types of servers exist, including web servers, mail servers, and file servers. Each 
type runs software specific to the purpose of the server. For example, a Web server may 
run Apache HTTP Server or Microsoft IIS, which both provide access to websites over 
the Internet. A mail server may run a program like Exim or iMail, which provides SMTP 
services for sending and receiving email. A file server might use Samba or the operating 
system's built­in file sharing services to share files over a network. 
While server software is specific to the type of server, the hardware is not as important. 
In fact, a regular desktop computers can be turned into a server by adding the 
 
 
 
18 
appropriate software. For example, a computer connected to a home network can be 
designated as a file server, print server, or both. 
While any computer can be configured as a server, 
most large businesses use rack­mountable 
hardware designed specifically for server 
functionality. These systems, often 1U in size, take 
up minimal space and often have useful features 
such as LED status lights and hot­swappable hard 
drive bays. Multiple rack­mountable servers can be 
placed in a single rack and often share the same 
monitor and input devices. Most servers are 
accessed remotely using remote access software, 
so input devices are often not even necessary. 
While servers can run on different types of computers, it is important that the hardware is 
sufficient to support the demands of the server. For instance, a web server that runs lots 
of web scripts in real­time should have a fast processor and enough RAM to handle the 
"load" without slowing down. A file server should have one or more fast hard drives or 
SSDs that can read and write data quickly. Regardless of the type of server, a fast 
network connection is critical, since all data flows through that connection. 
In Data center a server have some information such as : IP, Row no,Os,Product 
code,Setup date, Warranty,Memory,Rack No. 
Access control: 
Security for the Data Center is the Responsibility of the Data Center Management 
Department. The Manager is responsible for the administration for this policy. The 
following are the general requirements, policies and practices that govern access to this 
sensitive area, for which the Foundation has responsibility. It is important that all staff 
and business associates follow these policies and practices. Failure to do so is 
considered grounds for personnel action. General Access is given to people who have 
free access authority into the Data Center. General Access is granted to the Data Center 
Management staff whose job responsibilities require that they have access to the area. 
 
 
 
19 
Limited Access is granted to a person who does not qualify for General Access but has a 
legitimate business reason for unsupervised access to the Data Center. 
Departments/projects that have equipment in the Data Center may request access to the 
Data Center. The individuals designated by the requesting Department/project will be 
granted access once the Data Center Management team head authorizes them. 
Disaster Recovery (DR) :  
A solid disaster recovery (DR) strategy is crucial to protecting a organization's future in 
the event of a natural disaster or other emergency that causes downtime.Potential 
Threats to be considered and mitigated against could include: 
Natural Threats:Fire, Floods and Flash Floods,  Hurricane/Storm,  Earthquake. 
Man­Made Threats : Terrorism, Explosion, Bio­Hazard, Epidemic/Pandemic, 
Theft/Vandalism, Work Stoppage, Riot, Power/HVAC Failure, Communications Failure, 
Hardware Failure, Software Failure, Security Incident. 
Once we have defined your assets, we need to determine how long we can go without 
access to this resource. This is called the “ Recovery window” for each asset.  
b.      Organization­Wide :  
 
➔ Network operation :  
In information technology, a network is a series of points or nodes interconnected by 
communication paths. Networks can interconnect with other networks and contain sub 
networks. 
Type of network 
● Local Area Network(LAN) 
● Wide Area Network(WAN) 
● Metropolitan Area Network(MAN) 
Network Topologies and Design Goals 
 
 
 
20 
A network configuration is also called a network topology. A network topology is the sharp 
physical connectivity of the network. The network design has three major goals when 
establishing the topology of a network: 
● Provide maximum possible reliability to assure proper receipt of all traffic alternate 
routing. 
● Route the traffic across the least coast path within the network between the sending and 
receiving DTE 
● Give the end user the best possible response time and throughput. 
The second major goal in establishing a topology for the network is to provide the least cost 
path between the application processes residing on the Data terminal equipment. 
This involves:  
● Minimizing the actual length of the channel between the components, which usually 
entails routing the traffic through the fewest number of intermediate components. 
● Providing the least expensive channel option for particular application for instance, 
transmitting low priority data over a relatively inexpensive dial­up, low speed telephone 
line in contrast to transmitting the same data over an expensive high speed satellite 
channel. 
The common network topologies are: 
● The Hierarchical Topology(Tree) 
 
 
 
 
21 
● The Horizontal Topology ( Bus) 
 
● The Star Topology 
 
● The Ring Topology( HUB ) 
 
 
 
 
22 
● The Mesh Topology 
 
Network Overview: 
The network architecture typically consists of tree routing, switching and security element with 
progressively more specialized equipment moving up the network hierarchy. Today 
management solutions focus primarily on individual pieces of the infrastructure and don’t 
provide an application center view that span underlying hardware resource. The operational 
challenges that customer face in the area is the result of a series of shortcoming in the IT 
infrastructure they have today, and these shortcomings span from development all the way 
through the operations. 
Router:  
A router is a device that forwards data packets along networks. A router is connected to at least 
two networks, commonly two LANs or WANs or a LAN and its ISP's network. Routers are 
located at gateways, the places where two or more networks connect. 
Routers use headers and forwarding tables to determine the best path for forwarding the 
packets, and they use protocols such as ICMP to communicate with each other and configure 
the best route between any two hosts. 
Southeast Ban IT department use different kind of router for communication. Those routers are: 
● Juniper J­6350­JB ( core Router ) 
● Juniper J2350­JH (Branch Router ) 
● Juniper SRX­210 
 
Juniper J­6350­JB ( Core Router ) :  
● Designed to operate in the backbone or core. 
 
 
 
23 
● High availability configured for zero percentage downtime. 
● The entire service provide link connected to this router with additional module number of 
the link can be increased. 
● This device forward traffic to branch, SME center, Bangladesh Bank etc. 
● As it is connected to Firewall so all data will be filtered over there. 
 
Juniper J2350­JH ( Branch Router ) : 
● Internet service provider link connected in the untrust zone of this device. 
● In trust zone internet firewall in connected. 
● Certain protocols are blocked for security issues. 
● To connect with DC all the service provider link connected to the device. 
● Static and OSPF routing configure toward DC. 
● Trust and Untrust created for security concern.  
Switch: 
In networks, a device that filters and forwards packets between LAN segments. Switches 
operate at the data link layer (layer 2) and sometimes the network layer (layer 3) of the OSI 
Reference Model and therefore support any packet protocol. LANs that use switches to join 
segments are called switched LANs or, in the case of Ethernet networks, switched Ethernet 
LANs. 
Southeast bank IT department use different kind of Switch for communication. Those switch are: 
● Juniper Ex8208­REDUND­AC(Core switch) 
● Juniper EX3200­24T(Branch Switch) 
Juniper Ex8208­REDUND_AC:  
● The entire access switch should be connected with the core switch for accessing servers 
from inside. 
● Provision to connect via Ethernet or fiber. 
● 6 power supplied in each core switch ensures high level architecture for redundancy. 
● 10Gbps link can connecting with external module for higher throughput. 
● Data will be forwarding to firewall for deep scanning of any threat. 
Juniper EX3200­24T (Branch Switch) :  
● The entire server will be connected to DMZ switch. 
● User from outside world can access data. 
● User can access data at Gig speed. 
● The entire user on a particular VLAN. 
● Static IP configured on the switch. 
 
 
 
 
24 
Firewall: 
Firewall is a software or hardware­based network security system that control the incoming and 
outgoing network traffic by analyzing the data packet and determining whether they should be 
allowed through or not based on applied rule set. 
Southeast bank IT department use different type of Firewall for communication. Those Firewalls 
are:  
● Juniper NS­lGS­1000 (core Firewall) 
● Juniper SSG­320M­SH (Branch Firewall) 
● Juniper SSG­350M­SH (DMZ Firewall) 
 
 
Network Purpose, scope, and Objective: 
Southeast bank limited intends to apply technology upgrade and additions several areas with 
the objective of connections all the branches through wide area network. This WAN connectivity 
will be used for following activities: 
● Centralized banking operation 
● Data transfer 
● Internet Service 
● Active Directory Service (ADS) 
● VOIP for internal Communication 
● Scalability for video conferencing 
This connectivity must have highly secured system in place and faster data transfer with 
authorized access from and to applications of Head office and branches. 
LAN Connection at SEBL: 
SEBL cables are connected with channel cable tray and using of ladders, pipes, insulation and 
sound protection industry has made patch code which are used everywhere. Switch wire 
manager and all patch panels are decorated in a network rack for different floor and network 
operation center (NOC). All communication fiber cables are resolved and media converter 
converts and installs in managed way in the network rack. The next frame is used for wiring in 
the data center to connect all servers to switch servers and devices. 
● Complete the switch design and configuration tab of the detailed design workbook in 
order to finalize the design and configuration of LAN core, Distribution, and access 
components. 
● The VLAN design and configure tab of the derailed design workbook to finalize the 
design and configuration of the VLANs and layer 2 segmentation. 
 
 
 
25 
● The server design and configuration tab of the detailed design workbook to finalize the 
design and configure to finalize the design and configuration of servers supporting the 
DC and branch network. 
 
 
WAN Connectivity of SEBL: 
 
Link3 Technologies  Branch Fiber/Radio/Internet connectivity 
Gazi Communication  Branch VSAT Connectivity 
MetroNet Limited  Branch Fiber/Radio Connectivity 
Alap Communication  Internet Broadband Providers 
Square Limited  Branch Fiber/Radio connectivity 
DhakaCom Limited  Branch Fiber/Radio/Internet connectivity 
Bangladesh online Limited  Internet Broadband providers 
Banglaphone Limited  Branch Fiber/Radio connectivity 
 
 
 
26 
BDCOM Limited  Branch Fiber/Radio connectivity 
 
 
Schematic Diagram of WAN 
SEBL follow a schematic diagram in their data center. There are main three division of whole 
Data center of Main Branch they are, disaster recovery, Demilitarized Zone (DMZ), and Data 
center core zone. Now I want to show the schematic diagram of WAN. 
 
 
 
27 
 
 
Demilitarized Zone (DMZ) : 
Demilitarized zone is a computer host or small network which act as neutral zone between 
SEBL private network and the outside the public network. It avoids outside users from 
getting direct access to a server that has company data. A DMZ is an optional and more 
 
 
 
28 
secure approach to a firewall and effectively acts as a proxy server as well. DMZ has own 
router, Firewall, switch and also mail server, Internet banking server and substitute server. 
 
Subnetting Examples in Branches 
Here I get opportunity to take knowledge SEBL branches subnetting Class C addresses using 
the method i want to described about it. 
Suppose, The main IP address is 192.16.0.0 . The main IP address devided to 3 branches. 
Dilkusha branch are connected to 64 PC’s here our subnetting 192.16.0.0 to 192.16.0.63 and 
 
 
 
29 
there CIDR value 26 , block size 64. Where is subnet mask 255.255.255.192. Mirpur branch are 
connected to 08 PC’s Where is subnet mask 255.255.255.248. Aganagar branch are connected 
to 16 PC’s, here our subnetting normally start 192.16.0.72 but Aganagar branch start 
192.16.0.80 because Mirpur branch reserved some IP address. So our useable IP address are 
192.16.0.. to 192.16.0.79. For that reason Aganagar branch subnetting are 192.16.0.80 to 
192.16.0.95 and there CIDR value 28, block size 16. Where is subnet mask 255.255.255.240  
c.      ​ Other relevant activities​ : 
● Internet Banking 
The bank expanded its internet banking service range during the year. It has moved from 
information display mode to transactional mode of operation. The Bank introduced below 
mentioned services for its clients through internet banking:  
1. Payment of utility bill for WASA, DPDC,DESCO; 
2. Payment of student tuition / admission fee for North South 
University; 
3. Intra and inter­bank fund transfer; 
4. Payment of GP and Banglalink postpaid mobile phone bill; 
5. Opening of bank’s various scheme deposits and FDR account. 
6. Grameenphone, Robi, Banglalink , Airtel Top up. 
 
● SMS Banking 
Pull Services: 
  Account Balance Inquiry 
  Last 3 Transactions 
  Cheque Leaf Status 
  Interest Rate for different deposit products 
  Foreign Currency Exchange Rate 
  Branch Location / Telephone No. 
  ATM Booth Location 
  SMS Registration information 
  Help list of Keywords to send SMS 
Help message format to send SMS 
Request Services: 
Fund Transfer 
 
 
 
30 
Mobile Bill Payment 
Cheque Book Request 
Account Statement Print Request 
Account Statement Request by Courier 
Account Statement Request by E ­ mail 
Alert Services: 
Debit Alert 
Clearing Cheque Return Alert 
Loan / Time / Scheme Deposit Maturity Alert 
 
● ATM  
 
The Bank got 77 ATM booths in live operation across the country and issued a 
substantial number of debit cards to its customers. However the expansion of ATM 
network will be continued at suitable locations across the country for next few years. The 
Bank is also sharing ATM Networks of other banks, such as OMNIBUS and connected to 
the National Payment Switch (NPSB) along with other two commercial banks. 
 
IV – CONSTRAINTS 
It is not very easy to achieve the maximum result from any project. Lots of limitation and 
constraints make the whole thing though to reach to its ultimate destination. I faced some 
limitations to accomplish this report. 
Those limitations are  
● For time constraints the duration of the study was very short to know all the 
general activity of the IT department.  
● Collection of information was difficult due to the policy about the secrecy of the 
bank. 
● Bank It is a very busy department. Therefore it was tough to give me time. 
● Not enough information found from the Annual report regarding my topic. 
● Academic knowledge is not enough for job sectors. Academy teaches us initial 
level of knowledge but job sectors is vast area where we have to gather more 
 
 
 
31 
and more knowledge about our own sectors. But academic knowledge works 
properly when we drop our CV in various Companies then it works like written 
exam, viva etc. Academic knowledge increases our confidence to challenge or 
face the threats of job organization.   
V – ACQUIRED KNOWLEDGE 
Internship has been very much fruitful for me as i have gained a lot of experience on how to 
work in an official and professional environment. This is my first experience in a banking area, 
so these 3 months of internship program give me a different experience.It has give me the 
chance to develop my skill and Data center management, Hardware management of a large 
organization. 
a.       Implications to Organization/Company  
 
Hardware : In information technology, hardware is the physical aspect of computers, 
telecommunications, and other devices. 
Network Printer : A printer connected to a wired or wireless network. It may be Ethernet 
enabled and be cabled to an Ethernet switch, or it may connect to a Wi­Fi (wireless) 
network, or both. See print server, Ethernet, Wi­Fi and production printer. 
ON­LINE UPS : The definition of an ON­LINE UPS system is one where the Inverter is 
supplying 100% of the load 100% of the time. It is always completely regenerating the 
output waveform internally within the UPS. There is no transfer switch to be activated 
upon loss of AC or when a brownout condition occurs. If the back­up power system does 
 
 
 
32 
not match these criteria, it is not an ON­LINE UPS.
 
Data center :  ​ A data center is a facility used to house computer system and associated 
components such as telecommunications and storage system. It generally includes 
redundant or backup power supplies, redundant data communications connections, 
environmental control (e.g. air condition, fire suppression) and security device. Large 
data center are industrial scale operations using as much. Electricity as a small town. I 
also gather a small knowledge on data center management which is a big part of my 
intern time. In data center management means : 
● Performance Management.  
➔   Network performance management. 
➔ Power performance management. 
➔ Cooling performance management. 
➔ Auto fire extinguisher. 
● IP Management. 
● Hardware Management.( Server, PDU,UPS) 
● Access  control  
● Rack Management. ( IP, Row no,Os,Product code, Setup date,  Warranty, 
Memory) 
 
b.      Implications to University’s Internship Program 
District intern programs are similar to traditional American International university­Bangladesh 
(AIUB) internships in that the intern is both a full time teacher and full time student. In a 
 
 
 
33 
university intern program, interns are employed by the district and are enrolled full time in the 
university’s teacher preparation/education program. In a district intern program, the district 
employs the intern and delivers the teacher preparation program. The IMPACT Intern Program 
applies the concept of the district internship to a county­wide consortium model with the county 
office providing coordinated development and geographically convenient delivery of a 
comprehensive teacher training program to interns throughout the county. Upon completion of 
the program, interns are eligible for a professional teaching credential. Funding to operate the 
IMPACT Intern Program is from three sources: grant funds, intern fees and district in­kind 
support. 
VI – CONCLUDING STATEMENTS 
a.     ​  Recapitulation /Summary 
The main purpose of the report is to provide a basic idea of  Southeast Bank Limited IT 
department, and how Southeast Bank Limited IT Performed. The report will also present 
the various terms and conditions of maintaining the different services of Southeast Bank 
Limited. Generally by the word ‘Bank’ we can easily understand that the financial 
institution deals with money. The Activity of IT in a bank: 
Bank has always been a highly information activity that relies heavily on information 
technology to acquire process and deliver the information to all relevant users. Not only 
is IT critical in the processing of information, it provides a way for the bank to 
differentiate their products and services. Bank find that they have to constantly innovate 
and update to retain their demanding and discerning customers and to provide 
convenient, reliable and expedient services. Driven by the challenge to expand and 
capture a large share of the banking market, some banks invest in more bricks and 
mortar to enlarge their geographical and market coverage. Other have considered a 
more revolutionary approach to deliver their banking service via a new medium: “The 
Internet”. 
Finally I would like to conclude by praising the entire internship program, through which i 
have been able to achieve some significant experience and knowledge, as one of the 
most crucial segment of my academic career which is certainly valuable for the 
development of my future professional and academic career as well. 
 
 
 
34 
 
 
 
 
35 

More Related Content

What's hot

Final Internship Report
Final Internship ReportFinal Internship Report
Final Internship ReportMinhas Kamal
 
My Internship Document part1
My Internship Document part1My Internship Document part1
My Internship Document part1Shashi_S_S
 
Internship Report
Internship Report Internship Report
Internship Report zahurul88
 
Internship report (1)
Internship report (1)Internship report (1)
Internship report (1)brhne fitsum
 
Computer science industrial training report carried out at web info net ltd ...
Computer science  industrial training report carried out at web info net ltd ...Computer science  industrial training report carried out at web info net ltd ...
Computer science industrial training report carried out at web info net ltd ...rashid muganga
 
INTERNSHIP REPORT done by Didier Iradukunda (Electrical and Computer Engineer...
INTERNSHIP REPORT done by Didier Iradukunda (Electrical and Computer Engineer...INTERNSHIP REPORT done by Didier Iradukunda (Electrical and Computer Engineer...
INTERNSHIP REPORT done by Didier Iradukunda (Electrical and Computer Engineer...Didier Iradukunda
 
Internship report 2007eit043
Internship report 2007eit043Internship report 2007eit043
Internship report 2007eit043Isha Jain
 
INTERNSHIP_REPORT_FOR_ACCOUNTING_AND_FIN 2.docx
INTERNSHIP_REPORT_FOR_ACCOUNTING_AND_FIN 2.docxINTERNSHIP_REPORT_FOR_ACCOUNTING_AND_FIN 2.docx
INTERNSHIP_REPORT_FOR_ACCOUNTING_AND_FIN 2.docxMotibothra
 
Final Work Placement Report
Final Work Placement ReportFinal Work Placement Report
Final Work Placement ReportSiang Wei Lee
 
computer science internship report
computer science  internship reportcomputer science  internship report
computer science internship reportkaahwa Armstrong
 
Industrial Training Report-II-DIMO
Industrial Training Report-II-DIMOIndustrial Training Report-II-DIMO
Industrial Training Report-II-DIMOThushan Sivalingam
 
Luận văn: Tạo động lực lao động tại bảo hiểm xã hội ở Thanh Hóa - Gửi miễn ph...
Luận văn: Tạo động lực lao động tại bảo hiểm xã hội ở Thanh Hóa - Gửi miễn ph...Luận văn: Tạo động lực lao động tại bảo hiểm xã hội ở Thanh Hóa - Gửi miễn ph...
Luận văn: Tạo động lực lao động tại bảo hiểm xã hội ở Thanh Hóa - Gửi miễn ph...Dịch vụ viết bài trọn gói ZALO: 0909232620
 
Final Internship Report by kiyimba Bill (International University Of East Afr...
Final Internship Report by kiyimba Bill (International University Of East Afr...Final Internship Report by kiyimba Bill (International University Of East Afr...
Final Internship Report by kiyimba Bill (International University Of East Afr...Bill Kiyimba
 

What's hot (20)

Final Internship Report
Final Internship ReportFinal Internship Report
Final Internship Report
 
Internship Report
Internship ReportInternship Report
Internship Report
 
My Internship Document part1
My Internship Document part1My Internship Document part1
My Internship Document part1
 
Internship Report
Internship Report Internship Report
Internship Report
 
Internship report (1)
Internship report (1)Internship report (1)
Internship report (1)
 
Computer science industrial training report carried out at web info net ltd ...
Computer science  industrial training report carried out at web info net ltd ...Computer science  industrial training report carried out at web info net ltd ...
Computer science industrial training report carried out at web info net ltd ...
 
INTERNSHIP REPORT done by Didier Iradukunda (Electrical and Computer Engineer...
INTERNSHIP REPORT done by Didier Iradukunda (Electrical and Computer Engineer...INTERNSHIP REPORT done by Didier Iradukunda (Electrical and Computer Engineer...
INTERNSHIP REPORT done by Didier Iradukunda (Electrical and Computer Engineer...
 
Internship report 2007eit043
Internship report 2007eit043Internship report 2007eit043
Internship report 2007eit043
 
internship report
internship reportinternship report
internship report
 
Internship Report
Internship Report Internship Report
Internship Report
 
Internship report
Internship reportInternship report
Internship report
 
Training Report
Training ReportTraining Report
Training Report
 
Ceylon Electricity Board
Ceylon Electricity BoardCeylon Electricity Board
Ceylon Electricity Board
 
INTERNSHIP_REPORT_FOR_ACCOUNTING_AND_FIN 2.docx
INTERNSHIP_REPORT_FOR_ACCOUNTING_AND_FIN 2.docxINTERNSHIP_REPORT_FOR_ACCOUNTING_AND_FIN 2.docx
INTERNSHIP_REPORT_FOR_ACCOUNTING_AND_FIN 2.docx
 
Final Work Placement Report
Final Work Placement ReportFinal Work Placement Report
Final Work Placement Report
 
computer science internship report
computer science  internship reportcomputer science  internship report
computer science internship report
 
Industrial Training Report-II-DIMO
Industrial Training Report-II-DIMOIndustrial Training Report-II-DIMO
Industrial Training Report-II-DIMO
 
Luận văn: Tạo động lực lao động tại bảo hiểm xã hội ở Thanh Hóa - Gửi miễn ph...
Luận văn: Tạo động lực lao động tại bảo hiểm xã hội ở Thanh Hóa - Gửi miễn ph...Luận văn: Tạo động lực lao động tại bảo hiểm xã hội ở Thanh Hóa - Gửi miễn ph...
Luận văn: Tạo động lực lao động tại bảo hiểm xã hội ở Thanh Hóa - Gửi miễn ph...
 
Internship Wso2
Internship Wso2Internship Wso2
Internship Wso2
 
Final Internship Report by kiyimba Bill (International University Of East Afr...
Final Internship Report by kiyimba Bill (International University Of East Afr...Final Internship Report by kiyimba Bill (International University Of East Afr...
Final Internship Report by kiyimba Bill (International University Of East Afr...
 

Viewers also liked

Internship Report
Internship ReportInternship Report
Internship Reportzahurul88
 
INTERNSHIP REPORT ON BERGER PAINTS -SMIT GOSASLIYA
INTERNSHIP REPORT ON BERGER PAINTS -SMIT GOSASLIYAINTERNSHIP REPORT ON BERGER PAINTS -SMIT GOSASLIYA
INTERNSHIP REPORT ON BERGER PAINTS -SMIT GOSASLIYAsmit gosaliya
 
MTB Affiliation Report
MTB Affiliation ReportMTB Affiliation Report
MTB Affiliation ReportSudip Ganguly
 
Summer Internship Report - Marico Kaya Enterprises Ltd
Summer Internship Report - Marico Kaya Enterprises LtdSummer Internship Report - Marico Kaya Enterprises Ltd
Summer Internship Report - Marico Kaya Enterprises LtdDisha Bedi
 
Summer internship project report berger paints marketring
Summer internship project report berger paints marketringSummer internship project report berger paints marketring
Summer internship project report berger paints marketringRitwick Banerjee
 
summer internship report of berger paints.
summer internship report of berger paints.summer internship report of berger paints.
summer internship report of berger paints.Shivam Somvanshi
 
Report on Asian Paints Bangladesh Ltd.
Report on Asian Paints Bangladesh Ltd.Report on Asian Paints Bangladesh Ltd.
Report on Asian Paints Bangladesh Ltd.Sadia Afroz
 
Internship Report
Internship ReportInternship Report
Internship Reportzahurul88
 

Viewers also liked (10)

Internship Report
Internship ReportInternship Report
Internship Report
 
01 internship-summer-2015
01 internship-summer-201501 internship-summer-2015
01 internship-summer-2015
 
INTERNSHIP REPORT ON BERGER PAINTS -SMIT GOSASLIYA
INTERNSHIP REPORT ON BERGER PAINTS -SMIT GOSASLIYAINTERNSHIP REPORT ON BERGER PAINTS -SMIT GOSASLIYA
INTERNSHIP REPORT ON BERGER PAINTS -SMIT GOSASLIYA
 
MTB Affiliation Report
MTB Affiliation ReportMTB Affiliation Report
MTB Affiliation Report
 
Summer Internship Report - Marico Kaya Enterprises Ltd
Summer Internship Report - Marico Kaya Enterprises LtdSummer Internship Report - Marico Kaya Enterprises Ltd
Summer Internship Report - Marico Kaya Enterprises Ltd
 
Asian Paints
Asian PaintsAsian Paints
Asian Paints
 
Summer internship project report berger paints marketring
Summer internship project report berger paints marketringSummer internship project report berger paints marketring
Summer internship project report berger paints marketring
 
summer internship report of berger paints.
summer internship report of berger paints.summer internship report of berger paints.
summer internship report of berger paints.
 
Report on Asian Paints Bangladesh Ltd.
Report on Asian Paints Bangladesh Ltd.Report on Asian Paints Bangladesh Ltd.
Report on Asian Paints Bangladesh Ltd.
 
Internship Report
Internship ReportInternship Report
Internship Report
 

Similar to Internreport

Internship report -_dutch_bangla_bank_li
Internship report -_dutch_bangla_bank_liInternship report -_dutch_bangla_bank_li
Internship report -_dutch_bangla_bank_lizahurul88
 
Internship report on credit management policy & procedure by mutual trust ban...
Internship report on credit management policy & procedure by mutual trust ban...Internship report on credit management policy & procedure by mutual trust ban...
Internship report on credit management policy & procedure by mutual trust ban...Md. Abdullah Al Noman
 
Ahmed tanvir
Ahmed tanvirAhmed tanvir
Ahmed tanvirzahurul88
 
Internship Report on United Commercial Bank Ltd.
Internship Report on United Commercial Bank Ltd.Internship Report on United Commercial Bank Ltd.
Internship Report on United Commercial Bank Ltd.Azas Shahrier
 
Summer Internship Report Project - NIC ASIA BANK Nepal by Neeraj Bhandari (Su...
Summer Internship Report Project - NIC ASIA BANK Nepal by Neeraj Bhandari (Su...Summer Internship Report Project - NIC ASIA BANK Nepal by Neeraj Bhandari (Su...
Summer Internship Report Project - NIC ASIA BANK Nepal by Neeraj Bhandari (Su...Neeraj Bhandari
 
Comparative Analysis of saving Accounts of different Banks
Comparative Analysis of saving Accounts of different BanksComparative Analysis of saving Accounts of different Banks
Comparative Analysis of saving Accounts of different BanksManoj1947
 
Comparative Analysis of Saving accounts of different Banks
Comparative Analysis of Saving accounts of different BanksComparative Analysis of Saving accounts of different Banks
Comparative Analysis of Saving accounts of different BanksManoj1947
 
Report on Grameen bank in bangladesh
Report on Grameen bank in bangladeshReport on Grameen bank in bangladesh
Report on Grameen bank in bangladeshAsad Saimon
 
A Study on E-banking Facility of Kotak Mahindra Bank
A Study on E-banking Facility of Kotak Mahindra BankA Study on E-banking Facility of Kotak Mahindra Bank
A Study on E-banking Facility of Kotak Mahindra BankKhyati Ratanghayara
 
SIP SBI Project Report
SIP SBI Project ReportSIP SBI Project Report
SIP SBI Project ReportYogesh Rathod
 
United commercial bank ltd. internship report
United commercial bank ltd. internship reportUnited commercial bank ltd. internship report
United commercial bank ltd. internship reportArif Hasan
 
Rezaul Islam-Intership Report New report file create .pdf
Rezaul Islam-Intership Report New report file create .pdfRezaul Islam-Intership Report New report file create .pdf
Rezaul Islam-Intership Report New report file create .pdfmosharafhossain65
 
Rezaul Islam-Intership Report New report file create .pdf
Rezaul Islam-Intership Report New report file create .pdfRezaul Islam-Intership Report New report file create .pdf
Rezaul Islam-Intership Report New report file create .pdfmosharafhossain65
 
JOB SATISFACTION OF EMPLOYEE.pdf
JOB SATISFACTION OF EMPLOYEE.pdfJOB SATISFACTION OF EMPLOYEE.pdf
JOB SATISFACTION OF EMPLOYEE.pdfSalimUddin28
 

Similar to Internreport (20)

sajid
sajidsajid
sajid
 
Internship report -_dutch_bangla_bank_li
Internship report -_dutch_bangla_bank_liInternship report -_dutch_bangla_bank_li
Internship report -_dutch_bangla_bank_li
 
Nbl report
Nbl reportNbl report
Nbl report
 
Ncc
NccNcc
Ncc
 
Ncc
NccNcc
Ncc
 
Sad
SadSad
Sad
 
Internship report on credit management policy & procedure by mutual trust ban...
Internship report on credit management policy & procedure by mutual trust ban...Internship report on credit management policy & procedure by mutual trust ban...
Internship report on credit management policy & procedure by mutual trust ban...
 
Ahmed tanvir
Ahmed tanvirAhmed tanvir
Ahmed tanvir
 
Internship Report on United Commercial Bank Ltd.
Internship Report on United Commercial Bank Ltd.Internship Report on United Commercial Bank Ltd.
Internship Report on United Commercial Bank Ltd.
 
Summer Internship Report Project - NIC ASIA BANK Nepal by Neeraj Bhandari (Su...
Summer Internship Report Project - NIC ASIA BANK Nepal by Neeraj Bhandari (Su...Summer Internship Report Project - NIC ASIA BANK Nepal by Neeraj Bhandari (Su...
Summer Internship Report Project - NIC ASIA BANK Nepal by Neeraj Bhandari (Su...
 
Comparative Analysis of saving Accounts of different Banks
Comparative Analysis of saving Accounts of different BanksComparative Analysis of saving Accounts of different Banks
Comparative Analysis of saving Accounts of different Banks
 
Comparative Analysis of Saving accounts of different Banks
Comparative Analysis of Saving accounts of different BanksComparative Analysis of Saving accounts of different Banks
Comparative Analysis of Saving accounts of different Banks
 
Report on Grameen bank in bangladesh
Report on Grameen bank in bangladeshReport on Grameen bank in bangladesh
Report on Grameen bank in bangladesh
 
MCB Bank Internship Report 2019
MCB Bank Internship Report 2019MCB Bank Internship Report 2019
MCB Bank Internship Report 2019
 
A Study on E-banking Facility of Kotak Mahindra Bank
A Study on E-banking Facility of Kotak Mahindra BankA Study on E-banking Facility of Kotak Mahindra Bank
A Study on E-banking Facility of Kotak Mahindra Bank
 
SIP SBI Project Report
SIP SBI Project ReportSIP SBI Project Report
SIP SBI Project Report
 
United commercial bank ltd. internship report
United commercial bank ltd. internship reportUnited commercial bank ltd. internship report
United commercial bank ltd. internship report
 
Rezaul Islam-Intership Report New report file create .pdf
Rezaul Islam-Intership Report New report file create .pdfRezaul Islam-Intership Report New report file create .pdf
Rezaul Islam-Intership Report New report file create .pdf
 
Rezaul Islam-Intership Report New report file create .pdf
Rezaul Islam-Intership Report New report file create .pdfRezaul Islam-Intership Report New report file create .pdf
Rezaul Islam-Intership Report New report file create .pdf
 
JOB SATISFACTION OF EMPLOYEE.pdf
JOB SATISFACTION OF EMPLOYEE.pdfJOB SATISFACTION OF EMPLOYEE.pdf
JOB SATISFACTION OF EMPLOYEE.pdf
 

Recently uploaded

From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 

Recently uploaded (20)

From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 

Internreport