PDX Next: Redesigning Portland International Airport

  1. 1. 20 million passengers
  2. 2. 5 construction projects $2 billion investment 2025 completion date
  3. 3. Concourse E extension 2020 Concourse B redevelopment 2021 Ground transportation upgrades 2021-23 New main terminal 2025
  4. 4. Objectives Capacity Enhancements Flexibility Modernization Resilience But most importantly: the Customer Experience!
  5. 5. 21.3 13.4 8.4 0 5 10 15 20 25 1975 1985 1995 2005 2015 2025 2035 Enplanedpassengers(millions) PDX PROBABILISTIC FORECASTS OF ENPLANED PASSENGERS Sources: Historical: Port of Portland records. 2010 Master Plan forecasts (2010 MP): Jacobs Consultancy and NEXTOR, April 2008. Planning Forecast 13.4 Enplaned = 26.8 Million Annual Passengers (27 MAP) Actual Activity through CY 2018
  6. 6. CAPACITY: LANDSIDE / AIRFIELD / TERMINAL Existing Capacity Future Improvements 2025 PDX System Capacity 202020152010 2030 2035 2040 2045 24 MAP 27 MAP 34 MAP LANDSIDE CLOSE-IN PUBLIC PARKING RAC READY/RETURN CURBSIDE & ROADWAYS AIRFIELD GATE CAPACITY TERMINAL CORE INCLUDES TERMINAL BALANCING AIRFIELDTERMINAL CC B/CC D REDEVELOPMENT GA RELOCATE N RAMP & CCA PACRINCLUDES QTA PACR REMAIN OVERNIGHT PARKING 2019 20 MAP
  7. 7. Six new gates for Southwest Airlines
  8. 8. 12 More places to sit, eat, shop and read
  9. 9. A new concourse for Alaska Airlines
  10. 10. New Concourse B exterior
  11. 11. An open, flexible new main terminal
  12. 12. How do you keep the heart and soul of PDX?
  13. 13. Make it easy to get places
  14. 14. How do you make a 1950s building seismically resilient?
  15. 15. A new roof
  16. 16. Can you make an airport bigger and reduce energy use intensity?
  17. 17. Aquifer Heat Pump Ground source heat pump
  18. 18. Increase airport size by 40%. Use 50% less energy per sq. ft.