My projects CEng MICE

607 views

Published on

Here you can find some examples of the projects I have managed.
I hope you enjoy it as much as I do building them!

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
607
On SlideShare
0
From Embeds
0
Number of Embeds
23
Actions
Shares
0
Downloads
12
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

My projects CEng MICE

  1. 1. Oscar Moreno Asenjo, CEng. MICE ® PMP
  2. 2.  Chief Resident Engineer (Highway). November 2011 – June 2012 Control and monitoring:  4.3 km motorway.  8 viaducts.  Partial cloverleaf interchange.
  3. 3. Viaduct construction
  4. 4. Cranes lifting concrete beams
  5. 5. Asphalt mixtures spread, Viaduct pillars
  6. 6. Load test
  7. 7.  Project Manager (Perm-way works). July 2007 – November 2009 Implementation of the following activities:  Earth Movement: 550.000 m3.  Double track using Iberian gauge with a total length of 27.500m.  Track ballast spread (167.000 m3), placement of sleepers “MR” and “PR”, placement of track, securing, heavy tamper, welding and rail de-stress.  Installing a total of 28 crossovers and railroad switches.
  8. 8. Ballast spread, final link
  9. 9. Final link, unloading tracks
  10. 10. Levelling, switch detail
  11. 11. Rail yard
  12. 12. Crossover detail, work train
  13. 13. Station rail yard
  14. 14.  Construction Manager. December 2005 – June 2007 Typology of the tunnels (Cut & Cover, total length of 3.600 m):  Concrete pile walls (diameters from 800 to 1500, depth up to 22m). In total 120.000 ml were performed.  Upper slab on supporting heads and lower reinforced slab.  Shotcreting of pile walls. Typology of the bridges:  Pk 0+500, Single steel box girder bridge of 96m length, central span 48m.  Pergola pk 6+100, two openings of 14 and 12 beams of 21m length each beam.  4 curved post-tensioned slabs of 1,20m at the edge y 27 m of length.  Footbridge between Pozuelo and the University of Somosaguas.
  15. 15. Bored piles
  16. 16. Pile walls
  17. 17. Steel box girder bridge
  18. 18. Pergola over motorway
  19. 19. Curved post-tensioned slabs
  20. 20. Finished project
  21. 21.  Site Manager. June 2004 – November 2005 Work’s description:  Drainage system of 370 m length with a stretch of 135 m jackable and diameter of 2500mm.  Three connecting chambers.  Roundabout renovation.  Overflow and sand trap chambers
  22. 22. Launch shaft
  23. 23. Pipe jacking in progress
  24. 24. Pipe jacking in progress
  25. 25. Pipe jacking in progress
  26. 26. Pipe trench and roundabout
  27. 27. Roundabout renovation
  28. 28.  Construction Manager. May 2002 – May 2004 Typology of the bridges:  Foundations: footings over drive piles or on land.  Circular pillars of 1,5m diameter with height up to 15 m.  Superstructure formed by pre-fabricated beams and solid slab  Two of the bridges are extensions of the existing ones at the San Pedro Sula highway – Puerto Cortés
  29. 29. Driven Piles for Gabriela Bridge
  30. 30. Channel flowing
  31. 31. Channel flowing

×