Geometrix Training For Ericsson Swap

  1. 1. Geometrix Overview Orlando Moreno omoreno@hotmail.com 408.656.2498 One Company. A World of Solutions.
  2. 2. Geometrix Architecture & Components omoreno@hotmail.com 2 One Company. A World of Solutions.
  3. 3. Geometrix Architecture MPC/SMLC/BSC omoreno@hotmail.com 3 One Company. A World of Solutions.
  4. 4. Time Difference of Arrival (TDOA) omoreno@hotmail.com 4 One Company. A World of Solutions.
  5. 5. TDOA + AOA - If required, selectively deployed at selected sites omoreno@hotmail.com 5 One Company. A World of Solutions.
  6. 6. Communication Interfaces BSC SMLC WLS TCP/IP v.35 SS7/ TCP/IP AMU TCP/IP WAN CSU/DSU GCS TCP/IP Processor TCP/IP Ethernet Supported WAN Interfaces T1-DS0 Ethernet Frame Relay T1 OAM ISDN Leased Line xDSL GCS TCP/IP X.25 Router WAN SMDS MPC omoreno@hotmail.com 6 One Company. A World of Solutions.
  7. 7. Wireless Location Sensor (WLS)  Located at wireless network base transceiver stations (BTS)  Measures features of the handset’s radio signal  Dual RF Band, Multi-Mode Interface support  Connects to base station power, receive antennas, CSU/DSU communication and alarm systems  Uses GPS for time synchronization; (GPS receiver integrated in unit)  Forwards signal measurements to the SMLC location system control unit omoreno@hotmail.com 7 One Company. A World of Solutions.
  8. 8. Wireless Location Sensor (WLS) BTS Receive Antennas BTS Receive Antennas BTS GPS Antenna BTS Multicoupler BTS GPS Splitter (optional) Multicoupler 6 (WLS DC blocked) Combiner To BTS GPS Rx (DC pass) Dry Contact Alarm (optional) v.35 connection To CSU/DSU 24/-48v DC from breaker panel WLS omoreno@hotmail.com 8 One Company. A World of Solutions.
  9. 9. Geolocation Control System (GCS=SMLC) • Central processor for the Geometrix location system • Manages, coordinates, and administers the WLS network • Interfaces directly to a carrier’s MPC/GMLC/SMLC/BSC • Composed of processor and router components • Is sized to the needs of the particular market(s) to be covered omoreno@hotmail.com 9 One Company. A World of Solutions.
  10. 10. Geolocation Control System (GCS) DTP Modem DTP Modem Non-Redundant Redundant omoreno@hotmail.com 10 One Company. A World of Solutions.
  11. 11. AMU-Based Deployed Architecture Um A MS BTS MSC E3 GCS CRDB E5+ LMU AMU (WLS) MPC/ GMLC PSAP Lg MS BTS BSC MSC GMLC Um Abis A omoreno@hotmail.com 11 One Company. A World of Solutions.
  12. 12. Lbis-Based Deployed Architecture (E///) Um A MS BTS MSC *CRDB (Coordinate E3 Routing Database) GCS CRDB Lbis E5 LMU SMPC (WLS) MPC PSAP Lb Lg MS BTS BSC MSC GMLC Um Abis A omoreno@hotmail.com 12 One Company. A World of Solutions.
  13. 13. System Tasking & Reporting 1. Caller initiates call 2. MSC analyzes the call, sends “origination request” message to the MPC/GMLC 3. MPC/GMLC tasks Geometrix to determine location 4. For GSM, the GCS/SMLC acquires the call channel assignment data from the Abis, Lbis, or Lb interface. For other air interfaces, this information is forwarded to the GCS by the MPC omoreno@hotmail.com 13 One Company. A World of Solutions.
  14. 14. System Tasking & Reporting Contd. 1. GCS tasks the appropriate WLS units to acquire and measure target handset signal 2. WLS units measure the target handset signal and return the measurements to the GCS 3. GCS computes caller’s position and sends the location information to the requesting MPC/GMLC 4. MPC/GMLC sends location info to the PSAP omoreno@hotmail.com 14 One Company. A World of Solutions.
  15. 15. TDMA E-911 Call Flow Geometrix Geolocation System Wireless GCS WLS MSC MPC Phone Invoke call. Analyze digital dialed and send OREQ msg. Task the PDE. Task the appropriate WLS. Return location measurements. Calculate and provide location. Send location information. PSAP omoreno@hotmail.com 15 One Company. A World of Solutions.
  16. 16. GSM AMU E-911 Call Flow Geometrix Geolocation System Abis AMU MSC/B GSM SC MPC/ GCS WLS Phone GMLC Invoke call Monitor Call Setup Messages Preliminary PDE Analyze Dialed Digits and send tasking OREQ msg Task the Task the PDE appropriate WLSs Return location measurements Calculate and provide Send location location information PSAP omoreno@hotmail.com 16 One Company. A World of Solutions.
  17. 17. GSM Lbis E-911 Call Flow omoreno@hotmail.com 17 One Company. A World of Solutions.
  18. 18. Redeployment testing • Greenlight testing • Face Testing (for in-progress “Phase 0” sites) • PSAP Testing omoreno@hotmail.com 18 One Company. A World of Solutions.
  19. 19. “Green Light” Testing • DS0 verified between the GCS and DSU port with hard loopback plug • WLS connected and diagnostics run to verify online functionality of WLS omoreno@hotmail.com 19 One Company. A World of Solutions.
  20. 20. Face Testing • Test all components of the Geometrix System for functionality • Confirm correct WLS installation • Verify site specific data provided from customer loaded accurately into the system • Verify RF connection between WLS and BTS for each sector omoreno@hotmail.com 20 One Company. A World of Solutions.
  21. 21. Drive Test Platform • Modified Grayson Wireless Invex Test Set • Used for Prior Carrier Tests/Trials • Provides E5 Interface Mobile Data for PDE Tasking • Call Data & DGPS Delivered Via – Wireless Data Link omoreno@hotmail.com 21 One Company. A World of Solutions.
  22. 22. Drive Testing Platform Components omoreno@hotmail.com 22 One Company. A World of Solutions.
  23. 23. Face Testing • Verify GPS hardware and installation • Verify WLS hardware, replace if faulty • Simulate 911 calls, to verify WLS has been configured correctly and responds appropriately when tasked • Confidence in operation of system end to end, prior to PSAP Integration testing omoreno@hotmail.com 23 One Company. A World of Solutions.
  24. 24. GCS and Site Readiness • Testing begins after connections are established between the WLS and the GCS – Provision of the WLS DS0 • Verification of all parameters associated with operation of WLS defined in the GCS database per the design • Modem connected to GCS omoreno@hotmail.com 24 One Company. A World of Solutions.
  25. 25. Tools Used • Drive Testing Platform • S/W Applications: • Map Tool • Cell Site Tool (in-house application) • Connection to GCS, via a Terminal omoreno@hotmail.com 25 One Company. A World of Solutions.
  26. 26. WLS Operation Verification Alpha Sector omoreno@hotmail.com 26 One Company. A World of Solutions.
  27. 27. WLS Operation Verification Alpha Sector omoreno@hotmail.com 27 One Company. A World of Solutions.
  28. 28. Participating Sites RECV_PRIMARY_SITE:vid:20074,tune_id:35565351,score:221.000000 for site:484 RECV_PRIMARY_SITE:vid:20074,tune_id:35565351,score:194.000000 for site:490 RECV_PRIMARY_SITE:vid:20074,tune_id:35565351,score:165.000000 for site:470 RECV_PRIMARY_SITE:vid:20074,tune_id:35565351,score:-1000.000000 for site:465 RECV_PRIMARY_SITE:vid:20074,tune_id:35565351,score:-1000.000000 for site:486 RECV_PRIMARY_SITE:vid:20074,tune_id:35565351,score:116.000000 for site:492 RECV_PRIMARY_SITE:vid:20074,tune_id:35565351,score:-1000.000000 for site:478 RECV_PRIMARY_SITE:vid:20074,tune_id:35565351,score:180.000000 for site:506 RECV_PRIMARY_SITE:vid:20074,tune_id:35565351,score:-1000.000000 for site:502 RECV_PRIMARY_SITE:vid:20074,tune_id:35565351,score:-1000.000000 for site:472 RECV_PRIMARY_SITE:vid:20074,Serving Site:484 was selected as primary omoreno@hotmail.com 28 One Company. A World of Solutions.
  29. 29. Participating Sites omoreno@hotmail.com 29 One Company. A World of Solutions.
  30. 30. WLS Operation Verification Alpha Sector VID TUNE_ID SITE SECTOR RSSI0 RSSI1 ======================================================== 20074 3556471 484 0 -89.00 -94.00 20074 3556471 484 0 -91.00 -93.00 20074 3556471 484 0 -89.00 -93.00 20074 3556472 484 0 -88.00 -96.00 20074 3556472 484 0 -91.00 -93.00 20074 3556472 484 0 -88.00 -93.00 20074 3556472 484 0 -91.00 -92.00 20074 3556472 484 0 -88.00 -91.00 20074 3556472 484 0 -95.00 -91.00 20074 3556472 484 0 -89.00 -93.00 omoreno@hotmail.com 30 One Company. A World of Solutions.
  31. 31. WLS Operation Verification Beta Sector omoreno@hotmail.com 31 One Company. A World of Solutions.
  32. 32. PSAP Testing/Verification • Live 911 call or PSAP Simulator • Monitor SMPC log file in GCS during testing • Verify tasking received from the SMPC – Verify correct tasking parameters for site • Verify response returned to SMPC • NOTE: GCS has no visibility into response delivery to PSAP omoreno@hotmail.com 32 One Company. A World of Solutions.
  33. 33. Concept of Beacon Sites • The term ‘Beacon Site’ is used to describe sites that do not have WLS hardware installed at the site and whose BCCH is received at an acceptable level by a neighboring site that does have a WLS installed. • In order for the Beacon Site feature to work, the BCCH and BSIC of the GSM Beacon Site must be received at the BCCH antenna of a Sync Site at an acceptable level as defined separately. Field tests carried out to validate theoretical design prior to formal approval. • Neighboring WLS sites will be tasked to calculate location of calls originated on the Beacon Site • The Beacon Site entry in the CID is needed for documentation purposes only; no DS0 required. omoreno@hotmail.com 33 One Company. A World of Solutions.
  34. 34. Example of Candidate Beacon and Candidate Sync Sites 4 Candidate Beacon 2 3 1 -75dBm Contour omoreno@hotmail.com 34 One Company. A World of Solutions.
  35. 35. Concept of Virtual WLS Sites • No WLS hardware (WLS, GPS or BCCH antenna etc) installed at Virtual WLS cell site location • Indoor and Limited Site Coverage Questionnaire filed with Andrew Corp. • A pre-assigned location (latitude, longitude) provided by the local (Cingular) RF Engineering team will be reported for all the calls made on each Virtual WLS sector omoreno@hotmail.com 35 One Company. A World of Solutions.
  36. 36. Ericsson Swap Acceptance Procedure • Andrew Pre-Swap Data: – In order for Andrew to properly support the swap three documents are needed prior to the night of the swaps • CID (provided by Cingular Transport Engineering) • TVW (provided to Cingular by Intrado) • BSC Dump (provided by Cingular Network Engineering) – These documents need to be submitted on a weekly basis 1 week prior to the swap date. All documents should be submitted to the ca.ericsson-swap@andrew.com mailbox. omoreno@hotmail.com 36 One Company. A World of Solutions.
  37. 37. Ericsson Swap Acceptance Procedure – contd. • Andrew Post-Swap Data: – Before formal acceptance the following data needs to submitted to Andrew • GCS As built template with accurate field data supplied within 24 hours. This document will be loaded by the support engineer from Andrew. • MDT (Market Data Template) with accurate data supplied within 1 week. This document will be forwarded to Andrew’s RF engineering department for records and reanalysis for accuracy after the market wide cutover is complete. omoreno@hotmail.com 37 One Company. A World of Solutions.
  38. 38. Brief Process Description for Acceptance Testing (reuse of WLS) • WLS States at Time of Cut Over – To collect lost timing information in order to update GPS almanac in WLS, 10-15 minutes spent after WLS powered up (after cut) while WLS state shows FAIL in GCS – Once process complete, WLS reboots and comes ONLINE • ON, ONLINE and ACTIVE leds should glow at this time – WLS OK/ONLINE in GCS menu • Active DS0 connectivity, updated GPS timing, functional hardware inside WLS omoreno@hotmail.com 38 One Company. A World of Solutions.
  39. 39. Brief Process Description for Acceptance Testing Contd. • Remote Diagnostics (about 10 min) – Telnet to WLS and conduct • BPU functionality test, SNR test, RF cabling test • Verification of BCCH hearability – WLS able to see BCCH channels the site is operating on? – Status of WLS moved to MPC_OR_TEST mode omoreno@hotmail.com 39 One Company. A World of Solutions.
  40. 40. Provisional and Final Acceptance – Functional Tests • Provisional Acceptance (PH II, FT, passed DL&D, DL) – Setup call trace for Phase II verification • Confirm GCS supplying appropriate (Phase II) coordinates – Andrew does not control /assure that the PSAP would see the Phase II data, as routing to PSAP involves the MSC and the Intrado (MPC) elements. Cingular/Ericsson shall ensure that the implementations in those elements are complete and accurate. • Final Acceptance – GPS receiver in WLS put into self-survey mode for 10,000 fixes (3 hours taken, result updated within 24 hours of cut) omoreno@hotmail.com 40 One Company. A World of Solutions.
  41. 41. Questions and Answers Orlando Moreno omoreno@hotmail.com 408.656.2498 omoreno@hotmail.com 41 One Company. A World of Solutions.

×