OPEP Newsletter Vol 1 Issue 3

1,612 views

Published on

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,612
On SlideShare
0
From Embeds
0
Number of Embeds
1,320
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

OPEP Newsletter Vol 1 Issue 3

  1. 1. opep@iimraipur.ac.in Volume: 1 Issue: 3 Date 23rd October, 2012 www.opepiimraipur.blogspot.in Q CORNER-HOTEL On an average 12 guests Toyota to recall 7.4 million cars arrive at a reception per Toyota is voluntarily recalling more than seven million hour. (Inter – arrival time vehicles worldwide, including some Yaris, Corolla and Camry is 5 minutes). It takes 4 models, over faulty window switches. minutes for the receptionist in the counter to answer the questions of guests. The There Will Be a Factory Skills Shortage. Just Not Yet standard deviation for it is A shortage of skilled manufacturing labor is on the way, says a three minutes. What is new study by Boston Consulting Group. But, says the firm, it average wait time of the hasn’t arrived yet. Many factory managers claim they’re guests? already suffering from a skills shortage. Recovery measure last resort to resume Kingfisher ANSWER TO SKI KING: Airlines operation, say lenders 80 Lenders to Kingfisher Airlines, whose combined exposure of nearly Rs. 7,500 crore is at risk, have said they will go in for recovery measures only as the last resort and expressed hope that its promoters will be able to find an investor and resume operations. Industrial Visit to Bhilai Steel Plant On Thursday, the 18th of October, 57 students of PGP 2012 -14 batch of Indian Institute of Management Raipur visited Bhilai Steel Plant, the flagship unit of Steel Authority of India EDITORS Limited. This plant is popularly known for being the sole  Abhay Shankar supplier of the countrys longest rail tracks of 260 meters.  Sujitha Tikka  Manoj H

×