Marketplace and Quality Assurance Presentation - Vincent Chirchir
School presentation
1. It’s Time To Rethink Modular Construction Lic. # 767505
2. In the 50’s the term was “pre-fab,” in the 70’s it was “ modular” and today it’s “ systems-built .”
3. However, what you call us is not nearly as important as understanding when you choose to build with modular technology, you benefit from fast construction and the superior quality control only available in a systems-built unit.
4.
5. The systems-built process produces less waste. Systems-built construction is a safer alternative. Conventional construction workers at the construction site regularly work in less than ideal conditions, with temperature extremes, rain, wind, or any combination of natural conditions. Because the systems-built structure is substantially completed in a factory- controlled setting using dry materials, the potential for high levels of mold and contaminants is eliminated. The systems-built structure is constructed off-site, reducing the Time and impact on the surrounding site environment.
6.
7. The Design Utilize district standards Sustainability (30 years) Flexibility of installation Easily expanded 10% - 45% or more savings depending on designs and materials
21. Let’s get started today… Lic.# 767505 2206 Alpine Blvd. Ste. B – Alpine CA 91901 619.722.7179 Enriching the neighborhood we live in – one building at a time
Editor's Notes
To insert this slide into your presentation Save this template as a presentation (.ppt file) on your computer. Open the presentation that will contain the image slide. On the Slides tab, place your insertion point after the slide that will precede the image slide. (Make sure you don't select a slide. Your insertion point should be between the slides.) On the Insert menu, click Slides from Files . In the Slide Finder dialog box, click the Find Presentation tab. Click Browse , locate and select the presentation that contains the image slide, and then click Open . In the Slides from Files dialog box, select the image slide. Select the Keep source formatting check box. If you do not select this check box, the copied slide will inherit the design of the slide that precedes it in the presentation. Click Insert . Click Close .
Combining traditional building techniques, quality manufacturing and third-party agencies who offer random inspections, testing, and certification services for quality control, permanent modular buildings are built in strict accordance with appropriate local, state, and national regulations and codes.