Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.
Sustrans’ missionto work everyday on practical andimaginative solutions to the transportchallenges affecting us all
Rupert Crosbee – Sustrans Area Manager         www.sustrans.org.uk•National Cycle Network•Urban work – developing greenway...
How the network hasgrown1995National CycleNetworkThere were 500miles of route open,when Sustrans won£42m to build theNatio...
How the network hasgrown2000National CycleNetwork5,000 miles weredelivered by the half-way point of theMillennium project
How the network hasgrown2005National CycleNetwork10,700 miles weredelivered by the endof the project -double what wasorigi...
How the network hasgrown2012We’ve now reached13,600 milesWithin one mile of55% of the UKpopulationOver one milliontrips ev...
National Trust and the NCN365 NationalTrust propertiesin England andWales within onemile of the NCN
a catalyst for change                          Over one third of                          NCN traffic freeBristol and Bath...
More than a network – it’s a standard
Maintaining infrastructure•   3,500 volunteers•   3,000 rangers•   Conservation•   Work days &    construction    camps
Maintaining infrastructure• 13,600miles        ofroute• 100signingchampions
Changing travel behaviour300 ActiveTravelChampions
Changing travel behaviour300 ActiveTravelChampionsworkplaces,colleges,and thecommunity
Making links
Sustrans and National Trust, Tyntesfield               Tyntesfield
Sustrans and National Trust, Tyntesfield  •Sustrans, National Trust, Local  Authority work together  •Funding opportunitie...
Sustrans - Rupert Crosbee
Upcoming SlideShare
Loading in …5
×

Sustrans - Rupert Crosbee

648 views

Published on

  • Be the first to comment

  • Be the first to like this

Sustrans - Rupert Crosbee

  1. 1. Sustrans’ missionto work everyday on practical andimaginative solutions to the transportchallenges affecting us all
  2. 2. Rupert Crosbee – Sustrans Area Manager www.sustrans.org.uk•National Cycle Network•Urban work – developing greenways•Sustrans volunteer programme•Links
  3. 3. How the network hasgrown1995National CycleNetworkThere were 500miles of route open,when Sustrans won£42m to build theNational CycleNetwork
  4. 4. How the network hasgrown2000National CycleNetwork5,000 miles weredelivered by the half-way point of theMillennium project
  5. 5. How the network hasgrown2005National CycleNetwork10,700 miles weredelivered by the endof the project -double what wasoriginally agreed
  6. 6. How the network hasgrown2012We’ve now reached13,600 milesWithin one mile of55% of the UKpopulationOver one milliontrips every day
  7. 7. National Trust and the NCN365 NationalTrust propertiesin England andWales within onemile of the NCN
  8. 8. a catalyst for change Over one third of NCN traffic freeBristol and Bath Railway Path – more than6,500 walking and cycling journeys everyday
  9. 9. More than a network – it’s a standard
  10. 10. Maintaining infrastructure• 3,500 volunteers• 3,000 rangers• Conservation• Work days & construction camps
  11. 11. Maintaining infrastructure• 13,600miles ofroute• 100signingchampions
  12. 12. Changing travel behaviour300 ActiveTravelChampions
  13. 13. Changing travel behaviour300 ActiveTravelChampionsworkplaces,colleges,and thecommunity
  14. 14. Making links
  15. 15. Sustrans and National Trust, Tyntesfield Tyntesfield
  16. 16. Sustrans and National Trust, Tyntesfield •Sustrans, National Trust, Local Authority work together •Funding opportunities Tyntesfield •Volunteer contributions – construction, promotion

×