  1. 1. DESIGN OF TELECOM NETWORK IN SIKKIM Presented by Anwesha Sarkar Anurag Mondal Ankan Debgupta Subham Chakraborty
  2. 2. AIM OF THE PROJECT  Design of a Transmission Network for the State of Sikkim.  Establish a Network for Wireline Services.  We have to provide the Wireline services to 10,000 subscribers.  Establish a Network for Broadband Services.  We have to provide the Broadband services to 5,000 subscribers.
  3. 3. OUR IMPLEMENTATION  The State of Sikkim has 4 Districts (North,South, East,West).  We have selected the following 9 Sub-division Towns :  Local Exchanges are placed in each of the Town.  We have placed the TAX( Tier 1) in Gangtok to support Wireline Traffic & Tier-1 switch & BNG to support the Broadband Traffic in Backbone Network .  We have placed one TAX ( Tier -2) in each of the district . Therefore 4 TAX (Tier-2) in total to support Backhaul Wireline Traffic. • Pakyonk • Namchi • Soreng • Rongli • Gangtok • Chungthan g • Mangon • Ravong • Gyalsing
  4. 4. OUR IMPLEMENTATION (CONT.)  To support the Backhaul Broadband Traffic , we have place one Tier-2 Swiches in each District. Total 4 switches are placed.  Wireline Traffic & Distribution of connection is estimated based on the population density.  Each Broadband Subscriber is provided Bandwidth in the range of 256 -1024 Kbps.  OFC is predominantly used in Broadband Backbone & Backhaul Network.  We have used both OFC & Microwave (Traffic < 2E1)are used in designing the Wireline Backhaul & Backbone Network.  STM Rings are formed in Backbone Network to provide protection from OFC cuts.
  5. 5. NETWORK NODES FOR WIRELINE & BROADBAND NETWORK Tier 2 Switch Tier 1 Switch BNG TAX(Level 2) TAX(Level 1) Local Exchange
  6. 6. WIRELINE NETWORK
  7. 7. ARCHITECTURE OF WIRELINE NETWORK W N S E ADM -1 E1 E1 E1 E1 ADM -1 ADM -1 ADM -1 ADM -1 STM-1 Ring 2E 1 2E1 3E1 6E1 3E1 10 E1 10 E1 53 E1 33 E1 STM -1Manga n (250) Chungthu ng (250) Ravong (750) Namac hi (750) Rongli (1500) Pakyon g (1500) Gangto k (4000) Soreng (500) Gyalsin g (500) Gangto k To Siliguri TAX(Level 2) TAX(Level 1) Local Exchange ADM Microwave OFC
  8. 8. TRANSMISSION LINK DETAILS : WIRELINE SL.NO Access Network Backhaul Network Backbone Network Local Exchange Node Link Node Link 1 Gangtok TAX-2(East) OFC TAX-1 via TAX-2(East) OFC 2 Mangan TAX-2(North) Microwave TAX-1 via TAX-2(North) OFC 3 Chungthang TAX-2(North) Microwave TAX-1 via TAX-2(North) OFC 4 Ravong TAX-2(South) OFC TAX-1 via TAX-2(South) OFC 5 Gyashing TAX-2(West) Microwave TAX-1 via TAX-2(West) OFC 6 Pakyong TAX-2(East) OFC TAX-1 via TAX-2(East) OFC 7 Namchi TAX-2(South) OFC TAX-1 via TAX-2(South) OFC 8 Soreng TAX-2(West) Microwave TAX-1 via TAX-2(West) OFC 9 Rongli TAX-2(East) OFC TAX-1 via TAX-2(East) OFC
  9. 9. TRAFFIC DETAILS : WIRELINE SL.NO Local Exchange No.of Subscriber BHCA Holding Time (in sec) Traffic (E1) 1 Gangtok 4000 4 180 33 2 Mangan 250 1 60 1 3 Chungthang 250 1 60 1 4 Ravong 750 2 120 3 5 Gyashing 500 1 90 1 6 Pakyong 1500 3 180 10 7 Namchi 750 2 120 3 8 Soreng 500 1 90 1 9 Rongli 1500 3 180 10 Total 10000 63
  10. 10. BROADBAND NETWORK
  11. 11. ARCHITECTURE OF BROADBAND NETWORK W N S E ADM -64 16 E1 16 E1 ADM -64 ADM -64 ADM -64 ADM -64 STM-64 Ring 32 E1 2 STM- 1 22 STM- 1 4GE Manga n (125) Chungthu ng (125) Ravong (375) Namac hi (375) Rongli (750) Pakyon g (750) Gangto k (2000) Soreng (250) Gyalsin g (250) Gangto k To Siliguri 2 STM- 1 4 STM- 1 STM-1 STM-1 2 STM- 1 1 STM- 16 3 STM- 1 3 STM- 1 BNG T2 Switch T1 Switch Local Exchange ADM BNG OFC
  12. 12. TRANSMISSION LINK DETAILS : BROADBAND SL.NO Access Network Backhaul Network Backbone Network Local Exchange Node Link Node Link 1 Gangtok T2(East) OFC T1 via T2(East) OFC 2 Mangan T2(North) OFC T1 via T2(North) OFC 3 Chungthang T2(North) OFC T1 via T2(North) OFC 4 Ravong T2(South) OFC T1 via T2(South) OFC 5 Gyashing T2(West) OFC T1 via T2(West) OFC 6 Pakyong T2(East) OFC T1 via T2(East) OFC 7 Namchi T2(South) OFC T1 via T2(South) OFC 8 Soreng T2(West) OFC T1 via T2(West) OFC 9 Rongli T2(East) OFC T1 via T2(East) OFC
  13. 13. TRAFFIC DETAILS : BROADBAND SL.NO Local Exchange No.of Subscriber Bandwidth(kbps) Traffic 1 Gangtok 2000 1024 STM-16 2 Mangan 125 256 16 E1 3 Chungthang 125 256 16 E1 4 Ravong 375 512 2 STM-1 5 Gyashing 250 512 1 STM-1 6 Pakyong 750 512 3 STM-1 7 Namchi 375 512 2 STM-1 8 Soreng 250 512 1 STM-1 9 Rongli 750 512 3 STM-1 Total 5000 4GE
  14. 14. CONCLUSION  A Wireline Network & Broadband is established in the state of Sikkim.  In Total 9 local exchanges, 4 TAX(level 2), 4 T2 switches , one TAX(level 1), one T1 switch and one BNG are used in the implementation of the complete network.  STM-1 & STM-64 rings are formed in the Backbone of Wireline & Broadband Network respectively to provide protection from OFC cuts.  Network was predominantly constructed over OFC in order to support higher data rates.