Resources

1,231 views

Published on

Module 5:
Resources

Published in: Technology, Business
  • Be the first to comment

Resources

  1. 1. Learn to Lead Projects More Effectively…
  2. 2. User can develop a resource plan that integrates  resources, costs, and the schedule to effectively control  the projects Create a resource hierarchy that reflects your organization’s resource structure:  Labor  Non Labor  Material
  3. 3. LABOR RESOURCES Charges ChargesS. No. Resource Resource ID ($/hr) (Rs/day) Installation  1 IE 50 5,000 Engineer 2 Civil Contractor CC 25 2,000 3 Technician Tech 25 2,000 4 Civil Worker CW 10 1,000
  4. 4. NON‐LABOR RESOURCES Charges ChargesS. No. Resource Resource ID ($/hr) (Rs/day) 5 Crane CR 100 5,000 MATERIAL RESOURCESS. No. Resource Resource ID Charges Charges 30,000 2,000,000 6 Generator GE Per unit Per unit 7 Finishing Goods FG 2,500 LS 50,000 LS
  5. 5.  Non‐resource costs associated with a project and assigned to a projects  activities Typically one‐time expenditures Examples of expenses include materials, facilities, travel, overhead, and  training EXPENSES FOR SAMPLE PROJECT Expense Rate Expense Rate S. No. Expense Item ($) (Rs) 1 Structural Goods (SG) 3,000 60,000 2 Logistics (L) 500 5,000
  6. 6. S. No. Activity Resources 1 Preliminary Works IE, CC 2 Procurement IE, GE, Tech 3 Structural Works CC, CW, SG 4 Installation IE, Tech, CR, L 5 Finishing Works CC, CW, FG 6 Commissioning IE, Tech

×