SlideShare a Scribd company logo
1 of 20
Download to read offline
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
CLIENT VENDOR N/A 1
DÂY CHUYỀN PHÂN LOẠI NARIME
Title
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
DÂY CHUYỀN PHÂN LOẠI NARIME
Total page :
Project
20
Intech_2021
ELECTRICAL CIRCUIT DIAGRAM
Code DH001833
INTECH GROUP-2022
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
Address: Lot 5+6 Lai Xa Industrial Park, Kim Chung Commune, Hoai Duc District, Ha Noi
Tel: (+84)24 66 806 795
Website: www.intechvietnam.com - Email: info@intech-group.vn
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
CLIENT VENDOR N/A 2
DÂY CHUYỀN PHÂN LOẠI NARIME
Table of contents
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
Page
1
3
7
Table of Contents
7a
10
B
Date Rev.
Drawing name
Title
Symbol of Device
Power Supply 380VAC Page 2/2
Power Distribution
02/12/2022
14
15
PLC Input 01 (X00-X17) Page 1/2
PLC Input 02 (X20-X37) Page 2/2
Layout In/Out Signal Input CV
Layout In/Out Signal Check CV
Layout In/Out Signal Main CV
2 Table of contents
11
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
02/12/2022
02/12/2022
4 B
Single Line Diagram Of System 02/12/2022
5a B
Layout Of Cabinet Page 1/2 02/12/2022
5b B
Layout Of Cabinet Page 2/2 02/12/2022
02/12/2022
02/12/2022
02/12/2022
02/12/2022
02/12/2022
02/12/2022
02/12/2022
02/12/2022
02/12/2022
02/12/2022
02/12/2022
02/12/2022
02/12/2022
12
13
6
Power Supply 380VAC Page 1/2
Power Supply 220VAC Page 1/2
8
Power Supply 220VAC Page 2/2
9
Power Supply 24VDC
16
PLC Output 01 (Y00-Y17) Page 1/2
17
PLC Output 02 (Y20-Y37) Page 2/2
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
CLIENT VENDOR N/A 3
DÂY CHUYỀN PHÂN LOẠI NARIME
Symbol of Device
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
MCCB
PS
PLC
HMI
BT
INVT
BL
SS
SK
MCB
SIGN EXPLAIN
Moulded Case Circuit Breaker
Miniature Circuit Breaker
Power Supply DC
Program Logic Controller
Human-Machine-Interface
Button
Inverter
Lamp
Sensor
Socket
NF Noise Filter
TL Tower Lamp
RL Relays, contactors
SW Switch
SP Speed Controller
BT
BL
Button
Lamp
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
CLIENT VENDOR N/A 4
DÂY CHUYỀN PHÂN LOẠI NARIME
Single Line Diagram Of System
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
Button + Lamp
PS
(S8FS-C35024)
PLC
(FX5U-64MT/ES)
Power Supply
(3 phases 380V, 50HZ)
MCB
(BKN 3P 6A)
MCB
(BKN 3P 63A)
NF
(RSHN-2020)
INVT
(LSLV0015G100
-4EOFN)
Motor
(1.5 kW)
Tower Lamp
MCB
(BKN 3P 6A)
INVT
(LSLV0004G100
-4EOFN)
Motor
(0.37 kW)
INVT
(LSLV0004G100
-4EOFN)
Motor
(0.37 kW)
MCB
(BKN 2P 20A)
HMI Sensor Rơ le
Remote I/O
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
CLIENT VENDOR N/A
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
5a
DÂY CHUYỀN PHÂN LOẠI NARIME
Layout Of Cabinet Page 1/2
Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
HÔNG BÊN TRÁI HÔNG BÊN PHẢI
MẶT TRƯỚC
800
∅22
192
138
65
300
50
180
(Kích thước theo thực tế)
300
150
127
85
77
180
300
150
1300
1100
200
124
124
124
100
124
488
140
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
CLIENT VENDOR N/A
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
5b
DÂY CHUYỀN PHÂN LOẠI NARIME
Layout Of Cabinet Page 2/2
Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
PANEL MẶT TRƯỚC
40W
x
60D
DUCT
LABEL
PANEL ĐÁY
40W x 60D DUCT
40W x 60D DUCT
CHÂN ĐẾ (MẶT SAU)
900
550
180
170
230
120
40W x 60D DUCT
40W x 60D DUCT
40W x 60D DUCT
40W
x
60D
DUCT
30
100
250
150
275
800
400
200 60 150
Khóet lỗ đi dây điện
800
PULL
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
CLIENT VENDOR N/A 6
DÂY CHUYỀN PHÂN LOẠI NARIME
Power Distribution
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
1.5
Red
1.5
Yellow
1.5
Blue
1.5
Black
1.5 Yellow/Green
2.5 Red
2.5 Yellow
2.5 Blue
1.5 Black N
R1
S1
T1
R
S
T
R0
S0
T0
2.5 Red
2.5 Yellow
2.5 Blue
1.5 Black
1.5
Red
1.5
Yellow
1.5
Blue
1.5
Red
1.5
Yellow
1.5
Blue
1.5
Red
1.5
Black
R1
S1
T1
R1
S1
T1
R1
N
R2
S2
T2
R3
S3
T3
L1
N1
1.5
Red
1.5
Yellow
1.5
Blue
1.5
Red
1.5
Yellow
1.5
Blue
1.5
Red
1.5
Black
1.5
Red
1.5
Black
FUSE1
FUSE2
FUSE3
6F1
GIGA18W
6F2
GIGA18W
6F3
GIGA18W
PE
YW1P-1EQM3S
6H3
YW1P-1EQM3Y
6H2
YW1P-1EQM3R
6H1
R
S
T
N
PE
1 2
3 4
5 6
BKN 3P 63A
6MCB1
1
2
3
4
5
6
6MCB2
BKN 3P 6A
1
2
3
4
5
6
6MCB3
BKN 3P 6A
1
2
3
4
6MCB4
BKN 2P 20A
1
2
3
4
6NF1
RSHN-2020
R1 /
T1 /
S1 /
N /
R2
7.0:A
S2
7.0:A
T2
7.0:B
R3
7a.0:A
S3
7a.0:A
T3
7a.0:A
L1
8.0:A
N1
8.0:A
L2
9.0:A
N2
9.0:A
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
CLIENT VENDOR N/A 7
DÂY CHUYỀN PHÂN LOẠI NARIME
Power Supply 380VAC Page 1/2
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
1.5 Red
1.5 Yellow
1.5 Blue
7INVT#1
LSLV0015G100-4EOFN
G100
TB-01
1.5
Red
1.5
Yellow
1.5
Blue
1.5
Yellow/Green
Cable
VTCF 4x1.5
1.5 Yellow/Green
1.5
Red
1.5
Yellow
1.5
Blue
1.5
Yellow/Green
1.5 Red
1.5 Yellow
1.5 Blue
1.5 Yellow/Green
Cable CC-Link
(FANC-110SBH)
B
SG
A
U1 V1 W1 PE
7M1
(1.5 kW)
Main Conveyor
3
M
U1 V1 W1 PE
W PE
V
U
L1 L2 L3
S+
S-
PE
PE
S2
/
6.5:F
R2 /
T2 /
T2
/
6.6:F
R2
/
6.5:F
S2 /
PE
/
7.11:B PE / 7.0:B
SG
7a.4:E
A
7a.4:E
B
7a.4:E
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
CLIENT VENDOR N/A 7a
DÂY CHUYỀN PHÂN LOẠI NARIME
Power Supply 380VAC Page 2/2
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
1.5 Red
1.5 Yellow
1.5 Blue
7aINVT#1
LSLV0004G100-4EOFN
TB-01
1.5
Red
1.5
Yellow
1.5
Blue
1.5
Yellow/Green
Cable
VTCF 4x1.5
1.5 Yellow/Green
G100
1.5
Red
1.5
Yellow
1.5
Blue
1.5
Yellow/Green
1.5 Yellow/Green
1.5 Red
1.5 Yellow
1.5 Blue
7aINVT#2
LSLV0004G100-4EOFN
TB-01
1.5
Red
1.5
Yellow
1.5
Blue
1.5
Yellow/Green
Cable
VTCF 4x1.5
G100
1.5
Red
1.5
Yellow
1.5
Blue
1.5
Yellow/Green
Cable CC-Link
(FANC-110SBH)
Cable CC-Link
(FANC-110SBH)
SG
B
A
B
SG
A
PE
W PE
V
U
L1 L2 L3 PE
U2 V2 W2 PE
7aM1
(0.37 kW)
Input Conveyor
3
M
U2 V2 W2 PE
W PE
V
U
L1 L2 L3 PE
U3 V3 W3 PE
7aM2
(0.37 kW)
Check Conveyor
3
M
U3 V3 W3
S+
S-
PE S+
S-
PE
x2
x1
7R1
110Ω
S3
/
6.7:F
R3 /
T3 /
T3
/
6.7:F
R3
/
6.7:F
S3 /
PE
/
7a.11:B PE / 7a.0:B
SG
7.6:F
A
7.6:F
B
7.6:F
SG A B
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
CLIENT VENDOR N/A 8
DÂY CHUYỀN PHÂN LOẠI NARIME
Power Supply 220VAC Page 1/2
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
1.5 Black
1.5 Red
1.5
Black
1.5
Red
8SK1
AC30-124
L1.1
L1
N1 1.5 Black
1.5 Red
1.5 Black
1.5 Black
1.5 Red
1.5 Red
1.5 Green/Yelow
L1.2
1.5 Black
1.5 Red
L1
L1
N1
N1
x1 x2
8Lamp1
LEDMF03
1
2
8FAN1
FK 6622.230
M
1~
PE
6
5
/10.3:D
10RL1
2 3
10RL1
/10.3:D
N1
/
6.9:F
L1
/
6.8:F L1 / 8.2:G
N1 / 8.2:G
L1
8.11:A
N1
8.11:A
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
CLIENT VENDOR N/A 9
DÂY CHUYỀN PHÂN LOẠI NARIME
Power Supply 220VAC Page 2/2
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
1.5 Black
1.5 Red
9HMI1
(GS2107-WTBDN)
0.5 White
0.5 Blue
P24
N24
1.5 Red
1.5 Black
0.5
White
0.5
Blue
1.5 Green/Yelow
1.5 Green/Yelow
1.5 Green/Yelow
L2
N2
1.5 Black
1.5 Red
Ethernet
PLC
0.5 White
0.5 Blue
9PLC1
FX5U-64MT/ES
L2
N2
Ethernet
HUB
9Hub1
TL-SG105
24V 0V PE
PE
L N
PE
PE
L 24V
0V
N
9PS1
S8FS-C35024
PE
L N
1
2
3
4
5
N2
/
6.10:F
L2
/
6.9:F L2 /
N2 /
P24 / 10.0:A
N24 / 10.0:A
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
CLIENT VENDOR N/A 10
DÂY CHUYỀN PHÂN LOẠI NARIME
Power Supply 24VDC
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
0.5 White
0.5 Blue
10-1
11
12
10SW1
ZCN-R504C
14
13
10RL1
RJ2S-CL D24
3
2 /8.3:B
5
6 /8.3:D
N24
/
9.11:D
P24
/
9.11:D
P24
/
11.0:A
N24
/
11.1:A
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
CLIENT VENDOR N/A 10
DÂY CHUYỀN PHÂN LOẠI NARIME
Communication Wiring
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
SDA
SDB
RDA
RDB
SG
Master
10PLC1
Slave 2
7aInvt1
Resister
110 Ohm 1/2W
Cable CC-Link
(FANC-110SBH)
Slave 3
7aInvt2
S+
S-
PE
Slave 1
7Invt1
Cable CC-Link
(FANC-110SBH)
S+
S-
PE Cable CC-Link
(FANC-110SBH)
S+
S-
PE
Resister
110 Ohm 1/2W
B
SG
A
PE
PE
PE PE
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
CLIENT VENDOR N/A 11
DÂY CHUYỀN PHÂN LOẠI NARIME
PLC Input 01 (X00-X17) Page 1/2
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
TERMINAL
ADRESS
SW_Auto/Man
BT_Start
COM
+
SS_CV_Pos1
COMMENT
S/S
0.5 White
0.5 Blue
BT_Stop
BT_Reset
BT_EMG
SS_Input_CV
BT_Origin
SS_Trigger
SS_CV_Pos3
SS_CV_Pos2
SS_CV_Pos5
SS_CV_Pos4
0.5
White
X00 X01 X02 X03 X04 X05 X06 X07 X10 X11 X12 X13 X14 X15 X16 X17
S/S
SS_CV_Pos6
SS_CV_Pos7
SS_Door_1
Brown
Black
Blue
Brown
Black
Blue
Brown
Black
Blue
Brown
Black
Blue
Brown
Black
Blue
Brown
Black
Blue
Brown
Black
Blue
Brown
Black
Blue
Brown
Black
Blue
Black
Brown
Blue
TB-02
Cable
16x0.5
X00 X01 X02 X03 X04 X05 X06 X07 X10 X11 X12 X13 X14 X15 X16 X17
0.5 Blue
9PLC1
FX5U-64MT/ES
P24
11SS1
(PZ-G62N)
-
+
11SS2
(PZ-G62N)
-
+
11SS3
(PZ-G62N)
-
+
11SS4
(PZ-G62N)
-
+
11SS5
(PZ-G62N)
-
+
11SS6
(PZ-G62N)
-
+
11SS7
(PZ-G62N)
-
+
11SS8
(PZ-G62N)
-
+
11SS9
(PZ-G62N)
-
+
11SS10
(PZ-G62N)
-
+
N24
P24
N24
P24
N24
P24
N24
P24
N24
P24
N24
P24
N24
P24
N24
P24
N24
P24
N24
P24
N24
X01 X03 X04 X05 X06 X07 X10 X11 X12 X13 X14 X15 X16
X02
X00 X17
13
14
11SW1
YW1S-2E10
Auto/Manual
13
14
11BT1
YW1L-
MF2E10Q4G
Start
11
12
11BT2
YW1L-
MF2E01Q4R
Stop
13
14
11BT3
YW1L-
MF2E10Q4Y
Reset
13
14
11BT4
YW1L-
MF2E10Q4G
Origin
11
12
11BT5
YW1B-
V4E11R
EMG
N24
/
10.11:A
P24
/
10.11:A
P24
/
12.1:A
N24
/
12.1:A
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
CLIENT VENDOR N/A 12
DÂY CHUYỀN PHÂN LOẠI NARIME
PLC Input 02 (X20-X37) Page 2/2
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
TERMINAL
ADRESS
SS_Door_2
SS_Door_3
COMMENT
0.5 White
0.5 Blue
SS_Door_4
SS_Door_5
SS_Door_7
SS_Door_NG
SS_Door_6
Spare
Spare
Spare
Spare
Spare
Spare
X20 X21 X22 X23 X24 X25 X26 X27 X30 X31 X32 X33 X34 X35 X36 X37
Brown
Black
Blue
Brown
Black
Blue
Brown
Black
Blue
Brown
Black
Blue
TB-03
0.5 Blue
Cable
16x0.5
Brown
Black
Blue
Brown
Black
Blue
Brown
Black
Blue
X20 X21 X22 X23 X24 X25 X26 X27 X30 X31 X32 X33 X34 X35 X36 X37
9PLC1
FX5U-64MT/ES
Spare
Spare
Spare
12SS1
(PZ-62N)
-
+
12SS2
(PZ-62N)
-
+
12SS3
(PZ-62N)
-
+
12SS4
(PZ-62N)
-
+
P24
N24
P24
N24
P24
N24
P24
N24
X21 X23 X24 X25 X26 X32 X33 X34 X35 X36
X22
X20 X37
12SS5
(PZ-62N)
-
+
12SS6
(PZ-62N)
-
+
12SS7
(PZ-62N)
-
+
P24
N24
P24
N24
P24
N24
X27 X30 X31
N24
/
11.11:A
P24
/
11.11:A
P24
/
13.1:A
N24
/
13.1:A
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
CLIENT VENDOR N/A 13
DÂY CHUYỀN PHÂN LOẠI NARIME
PLC Output 01 (Y00-Y17) Page 1/2
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
TERMINAL
ADRESS
BL_Start
Y00 Y01 Y02 Y03 Y04 Y05 Y06 Y07 Y10 Y11 Y12 Y13 Y14 Y15 Y16 Y17
BL_Stop
TL_Red
TL_Yellow
TL_Green
TL_Buzzer
Valve_Door1
Valve_Door2
Valve_Door3
Valve_Door4
Valve_Door5
BT_Reset
BT_Origin
COMMENT
TB-03
COM0
0.5 White
0.5 Blue
0.5
Blue
0.5
Blue
0.5
Blue
0.5
Blue
0.5
Blue
0.5
Blue
0.5
Blue
0.5
Blue
0.5
Blue
0.5
Blue
0.5
Blue
0.5
Blue
0.5
Blue
0.5
Blue
0.5
Blue
0.5 Blue
Y00 Y01 Y02 Y03 Y04 Y05 Y06 Y07 Y10 Y11 Y12 Y13 Y14 Y15 Y16 Y17 COM0 COM1
COM1
COM2
COM2
13TL1
(ST56L-BZ-3-24-RAG)
Red
Yellow
Green
Brown
Black
0.5
White
0.5
White
0.5
White
0.5
White
0.5
White
0.5
White
0.5
White
0.5
White
0.5
White
9PLC1
FX5U-64MT/ES
Com
Com
Com
Valve_Door7
Valve_Door6
Spare
Y01 Y03 Y04 Y05 Y06 Y07 Y10 Y11 Y12 Y13 Y14 Y15 Y16
Y02
Y00 Y17
N24
x1
x2
11BL1
YW1L-
MF2E10Q4G
Start
x1
x2
11BL2
YW1L-
MF2E01Q4R
Stop
x1
x2
11BL3
YW1L-
MF2E10Q4Y
Reset
x1
x2
11BL4
YW1L-
MF2E10Q4G
Origin
P24 P24
x1
x2
x1
x2
x1
x2
x1
x2
P24 P24 P24
x1
x2
13V1
VX220A
AXNB
x1
x2
13V2
VX220A
AXNB
x1
x2
13V3
VX220A
AXNB
x1
x2
13V4
VX220A
AXNB
x1
x2
13V5
VX220A
AXNB
P24 P24 P24 P24
x1
x2
13V6
VX220A
AXNB
x1
x2
13V7
VX220A
AXNB
N24
/
12.11:A
P24 / 14.1:A
P24
/
12.11:A
N24 / 14.1:A
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
CLIENT VENDOR N/A 14
DÂY CHUYỀN PHÂN LOẠI NARIME
PLC Output 02 (Y20-Y37) Page 2/2
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
TERMINAL
ADRESS
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
COMMENT
TB-03
0.5 White
0.5 Blue
0.5 Blue
Y20 Y21 Y22 Y23 Y24 Y25 Y26 Y27 Y30 Y31 Y32 Y33 Y34 Y35 Y36 Y37 COM3 COM4 COM5
COM3 COM4 COM5
Y20 Y21 Y22 Y23 Y24 Y25 Y26 Y27 Y30 Y31 Y32 Y33 Y34 Y35 Y36 Y37
0.5
Blue
9PLC1
FX5U-64MT/ES
Com
Com
Com
Y21 Y23 Y24 Y25 Y26 Y27 Y30 Y31 Y32 Y33 Y34 Y35 Y36
Y22
Y20 Y37
N24
N24
/
13.11:A
P24 /
P24
/
13.11:A
N24 /
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
CLIENT VENDOR N/A 15
DÂY CHUYỀN PHÂN LOẠI NARIME
Layout In/Out Signal Input CV
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
X06
7aM1
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
CLIENT VENDOR N/A 16
DÂY CHUYỀN PHÂN LOẠI NARIME
Layout In/Out Signal Check CV
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
X07
7aM2
Y04
Y05
Y06
Y07
A3 EPLAN ELECTRIC
TITLE:
Scale: Purchaser Doc. No.: Vendor Doc. No.: REV:
VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY
BY
CHECKED
STATUS
REV. DATE REVISION DESCRIPTION DESIGN
BY BY
APPROVED
N.T.S
(INTECH GROUP.,JSC)
B
0 1 2 3 4 5 6 7 8 9 10 11
H
G
F
E
D
C
B
A
0 1 2 3 4 5 6 7 8 9 10 11
A
B
C
D
E
F
G
H
CLIENT VENDOR N/A 17
DÂY CHUYỀN PHÂN LOẠI NARIME
Layout In/Out Signal Main CV
IFR
A ISSUED FOR REVIEW
NOTE:
IFA
B ISSUED FOR APPROVAL Mr.Tới
Mr.Tới
Mr.Ngọc
Mr.Ngọc
Mr.Anh
Mr.Anh
12/21/2021
12/21/2021
X10
X17
X11
X20
X12
X21
X13
X22
X14
X23
X15
X24
X16
X25
X26
7M1
Y14
Y13
Y15
Y16
Y17
Y20
Y21

More Related Content

Similar to MẪU TỦ ĐIỆN.pdf

23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdfMODI20077
 
panel designing software
panel designing softwarepanel designing software
panel designing softwareRamesh G
 
Cnc projeto completo (só montar)
Cnc projeto completo (só montar)Cnc projeto completo (só montar)
Cnc projeto completo (só montar)epahk
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CARichard Clark
 
Datasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdf
Datasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdfDatasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdf
Datasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdfEngrMuhammadArslan4
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATSMary Calkins
 
mackie_profx12_sch.pdf
mackie_profx12_sch.pdfmackie_profx12_sch.pdf
mackie_profx12_sch.pdfWijiUtami22
 
Adobe Scan Apr 27, 2023 (2).pdf
Adobe Scan Apr 27, 2023 (2).pdfAdobe Scan Apr 27, 2023 (2).pdf
Adobe Scan Apr 27, 2023 (2).pdfAJITTHAKUR68
 
Heat_exchanger_mechanical_design_calculations_per_asme_& tema by abdel hali...
Heat_exchanger_mechanical_design_calculations_per_asme_& tema   by abdel hali...Heat_exchanger_mechanical_design_calculations_per_asme_& tema   by abdel hali...
Heat_exchanger_mechanical_design_calculations_per_asme_& tema by abdel hali...MIGUEL SALDIVAR HERNANDEZ
 
Calculation sheet-for-slab q-2053-01
Calculation sheet-for-slab q-2053-01Calculation sheet-for-slab q-2053-01
Calculation sheet-for-slab q-2053-01Ahmed Gaafar
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseGrant Hepburn
 
=03 - Zakretanje Odlozne Trake.pdf
=03 - Zakretanje Odlozne Trake.pdf=03 - Zakretanje Odlozne Trake.pdf
=03 - Zakretanje Odlozne Trake.pdfssuser41d5bf
 
ARCH 390 D AAYO Technical/Des Drawings
ARCH 390 D AAYO Technical/Des DrawingsARCH 390 D AAYO Technical/Des Drawings
ARCH 390 D AAYO Technical/Des DrawingsAustinAyo
 
PCB manufacture design rule
PCB manufacture design rulePCB manufacture design rule
PCB manufacture design ruleJane Soong
 
Electrical Schematic of PowerPC GNU/Linux Notebook
Electrical Schematic of PowerPC GNU/Linux NotebookElectrical Schematic of PowerPC GNU/Linux Notebook
Electrical Schematic of PowerPC GNU/Linux NotebookRoberto Innocenti
 

Similar to MẪU TỦ ĐIỆN.pdf (20)

23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf23055 - LAVALIN PROJECT - Shop Drawing.pdf
23055 - LAVALIN PROJECT - Shop Drawing.pdf
 
panel designing software
panel designing softwarepanel designing software
panel designing software
 
Cnc projeto completo (só montar)
Cnc projeto completo (só montar)Cnc projeto completo (só montar)
Cnc projeto completo (só montar)
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CA
 
Datasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdf
Datasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdfDatasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdf
Datasheet for firefighting equipment 1971-11-EX06-00-340-FF-DS-00001_01.pdf
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS
 
Working drawings sample
Working drawings sampleWorking drawings sample
Working drawings sample
 
20150811-Allied Telecom
20150811-Allied Telecom20150811-Allied Telecom
20150811-Allied Telecom
 
mackie_profx12_sch.pdf
mackie_profx12_sch.pdfmackie_profx12_sch.pdf
mackie_profx12_sch.pdf
 
Adobe Scan Apr 27, 2023 (2).pdf
Adobe Scan Apr 27, 2023 (2).pdfAdobe Scan Apr 27, 2023 (2).pdf
Adobe Scan Apr 27, 2023 (2).pdf
 
Design
DesignDesign
Design
 
ProcContSite
ProcContSiteProcContSite
ProcContSite
 
Heat_exchanger_mechanical_design_calculations_per_asme_& tema by abdel hali...
Heat_exchanger_mechanical_design_calculations_per_asme_& tema   by abdel hali...Heat_exchanger_mechanical_design_calculations_per_asme_& tema   by abdel hali...
Heat_exchanger_mechanical_design_calculations_per_asme_& tema by abdel hali...
 
Calculation sheet-for-slab q-2053-01
Calculation sheet-for-slab q-2053-01Calculation sheet-for-slab q-2053-01
Calculation sheet-for-slab q-2053-01
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson House
 
=03 - Zakretanje Odlozne Trake.pdf
=03 - Zakretanje Odlozne Trake.pdf=03 - Zakretanje Odlozne Trake.pdf
=03 - Zakretanje Odlozne Trake.pdf
 
ARCH 390 D AAYO Technical/Des Drawings
ARCH 390 D AAYO Technical/Des DrawingsARCH 390 D AAYO Technical/Des Drawings
ARCH 390 D AAYO Technical/Des Drawings
 
PCB manufacture design rule
PCB manufacture design rulePCB manufacture design rule
PCB manufacture design rule
 
E1 Electrical System
E1 Electrical SystemE1 Electrical System
E1 Electrical System
 
Electrical Schematic of PowerPC GNU/Linux Notebook
Electrical Schematic of PowerPC GNU/Linux NotebookElectrical Schematic of PowerPC GNU/Linux Notebook
Electrical Schematic of PowerPC GNU/Linux Notebook
 

Recently uploaded

Oro -dental Preparation.pdfsksjssjsjsssss
Oro -dental Preparation.pdfsksjssjsjsssssOro -dental Preparation.pdfsksjssjsjsssss
Oro -dental Preparation.pdfsksjssjsjsssssMustafaHussain83
 
CO-OP4CBD and its role in increasing Science – Policy Interface. Jorge Luis V...
CO-OP4CBD and its role in increasing Science – Policy Interface. Jorge Luis V...CO-OP4CBD and its role in increasing Science – Policy Interface. Jorge Luis V...
CO-OP4CBD and its role in increasing Science – Policy Interface. Jorge Luis V...pensoftservices
 
Insights regarding EU Coordination. Hendrik Segers.. The main challenges of C...
Insights regarding EU Coordination. Hendrik Segers.. The main challenges of C...Insights regarding EU Coordination. Hendrik Segers.. The main challenges of C...
Insights regarding EU Coordination. Hendrik Segers.. The main challenges of C...pensoftservices
 
Synthetic biology. Fanny Coppens, Sciensano.
Synthetic biology. Fanny Coppens, Sciensano.Synthetic biology. Fanny Coppens, Sciensano.
Synthetic biology. Fanny Coppens, Sciensano.pensoftservices
 
ENVIRONMENTAL ISSUES AND AWARENESS - Presentation
ENVIRONMENTAL ISSUES AND AWARENESS - PresentationENVIRONMENTAL ISSUES AND AWARENESS - Presentation
ENVIRONMENTAL ISSUES AND AWARENESS - PresentationTaruna Deshwal
 
Forest Loss in 2023: Regional Contexts and Global Trends - April 4, 2024 Webinar
Forest Loss in 2023: Regional Contexts and Global Trends - April 4, 2024 WebinarForest Loss in 2023: Regional Contexts and Global Trends - April 4, 2024 Webinar
Forest Loss in 2023: Regional Contexts and Global Trends - April 4, 2024 WebinarGlobal Forest Watch
 
Little Green Ranger ESG Sustainability Report
Little Green Ranger ESG Sustainability ReportLittle Green Ranger ESG Sustainability Report
Little Green Ranger ESG Sustainability ReportKennethOng48
 
Poly-_and_perfluoroalkyl_substances_-sources_pathways_and_environmental_data_...
Poly-_and_perfluoroalkyl_substances_-sources_pathways_and_environmental_data_...Poly-_and_perfluoroalkyl_substances_-sources_pathways_and_environmental_data_...
Poly-_and_perfluoroalkyl_substances_-sources_pathways_and_environmental_data_...Eric Liu
 
Your Compost Is Not Compostable -- Tips on What Best Rots
Your Compost Is Not Compostable -- Tips on What Best RotsYour Compost Is Not Compostable -- Tips on What Best Rots
Your Compost Is Not Compostable -- Tips on What Best RotsDeidre Pike
 
Discussing how the scientific mechanisms of the CBD work. CBD mechanisms, pro...
Discussing how the scientific mechanisms of the CBD work. CBD mechanisms, pro...Discussing how the scientific mechanisms of the CBD work. CBD mechanisms, pro...
Discussing how the scientific mechanisms of the CBD work. CBD mechanisms, pro...pensoftservices
 
DETAILED LESSON FINAL DEMO TEACHING.docx
DETAILED LESSON FINAL DEMO TEACHING.docxDETAILED LESSON FINAL DEMO TEACHING.docx
DETAILED LESSON FINAL DEMO TEACHING.docxImilyAcma
 
Transforming Landscapes-The Inspiring Journey of Restoring Mines, the Ruhr Va...
Transforming Landscapes-The Inspiring Journey of Restoring Mines, the Ruhr Va...Transforming Landscapes-The Inspiring Journey of Restoring Mines, the Ruhr Va...
Transforming Landscapes-The Inspiring Journey of Restoring Mines, the Ruhr Va...G20LandInitiative
 
CIP Presentation Abdul Jabbar Shahani 2.pptx
CIP Presentation Abdul Jabbar Shahani 2.pptxCIP Presentation Abdul Jabbar Shahani 2.pptx
CIP Presentation Abdul Jabbar Shahani 2.pptxporaniyadain1
 
Winter Springs Sediment Removal: A Major Step Forward
Winter Springs Sediment Removal: A Major Step ForwardWinter Springs Sediment Removal: A Major Step Forward
Winter Springs Sediment Removal: A Major Step ForwardVictoriaColangelo
 
Issues regarding the provision of the Convention. Introduction to the Text an...
Issues regarding the provision of the Convention. Introduction to the Text an...Issues regarding the provision of the Convention. Introduction to the Text an...
Issues regarding the provision of the Convention. Introduction to the Text an...pensoftservices
 
Objectives and main international biodiversity events during the upcoming Hun...
Objectives and main international biodiversity events during the upcoming Hun...Objectives and main international biodiversity events during the upcoming Hun...
Objectives and main international biodiversity events during the upcoming Hun...pensoftservices
 
Planning and Designing Green buildings-.issues, options and strategies
Planning and Designing Green buildings-.issues, options and strategiesPlanning and Designing Green buildings-.issues, options and strategies
Planning and Designing Green buildings-.issues, options and strategiesJIT KUMAR GUPTA
 
Identifying ecologically or biologically significant marine areas: a national...
Identifying ecologically or biologically significant marine areas: a national...Identifying ecologically or biologically significant marine areas: a national...
Identifying ecologically or biologically significant marine areas: a national...pensoftservices
 
Green minimalist professional Business Proposal Presentation.pptx
Green minimalist professional Business Proposal Presentation.pptxGreen minimalist professional Business Proposal Presentation.pptx
Green minimalist professional Business Proposal Presentation.pptxrudkiaman0001
 

Recently uploaded (20)

Oro -dental Preparation.pdfsksjssjsjsssss
Oro -dental Preparation.pdfsksjssjsjsssssOro -dental Preparation.pdfsksjssjsjsssss
Oro -dental Preparation.pdfsksjssjsjsssss
 
CO-OP4CBD and its role in increasing Science – Policy Interface. Jorge Luis V...
CO-OP4CBD and its role in increasing Science – Policy Interface. Jorge Luis V...CO-OP4CBD and its role in increasing Science – Policy Interface. Jorge Luis V...
CO-OP4CBD and its role in increasing Science – Policy Interface. Jorge Luis V...
 
Insights regarding EU Coordination. Hendrik Segers.. The main challenges of C...
Insights regarding EU Coordination. Hendrik Segers.. The main challenges of C...Insights regarding EU Coordination. Hendrik Segers.. The main challenges of C...
Insights regarding EU Coordination. Hendrik Segers.. The main challenges of C...
 
Synthetic biology. Fanny Coppens, Sciensano.
Synthetic biology. Fanny Coppens, Sciensano.Synthetic biology. Fanny Coppens, Sciensano.
Synthetic biology. Fanny Coppens, Sciensano.
 
ENVIRONMENTAL ISSUES AND AWARENESS - Presentation
ENVIRONMENTAL ISSUES AND AWARENESS - PresentationENVIRONMENTAL ISSUES AND AWARENESS - Presentation
ENVIRONMENTAL ISSUES AND AWARENESS - Presentation
 
Forest Loss in 2023: Regional Contexts and Global Trends - April 4, 2024 Webinar
Forest Loss in 2023: Regional Contexts and Global Trends - April 4, 2024 WebinarForest Loss in 2023: Regional Contexts and Global Trends - April 4, 2024 Webinar
Forest Loss in 2023: Regional Contexts and Global Trends - April 4, 2024 Webinar
 
Little Green Ranger ESG Sustainability Report
Little Green Ranger ESG Sustainability ReportLittle Green Ranger ESG Sustainability Report
Little Green Ranger ESG Sustainability Report
 
Poly-_and_perfluoroalkyl_substances_-sources_pathways_and_environmental_data_...
Poly-_and_perfluoroalkyl_substances_-sources_pathways_and_environmental_data_...Poly-_and_perfluoroalkyl_substances_-sources_pathways_and_environmental_data_...
Poly-_and_perfluoroalkyl_substances_-sources_pathways_and_environmental_data_...
 
Your Compost Is Not Compostable -- Tips on What Best Rots
Your Compost Is Not Compostable -- Tips on What Best RotsYour Compost Is Not Compostable -- Tips on What Best Rots
Your Compost Is Not Compostable -- Tips on What Best Rots
 
Discussing how the scientific mechanisms of the CBD work. CBD mechanisms, pro...
Discussing how the scientific mechanisms of the CBD work. CBD mechanisms, pro...Discussing how the scientific mechanisms of the CBD work. CBD mechanisms, pro...
Discussing how the scientific mechanisms of the CBD work. CBD mechanisms, pro...
 
DETAILED LESSON FINAL DEMO TEACHING.docx
DETAILED LESSON FINAL DEMO TEACHING.docxDETAILED LESSON FINAL DEMO TEACHING.docx
DETAILED LESSON FINAL DEMO TEACHING.docx
 
Transforming Landscapes-The Inspiring Journey of Restoring Mines, the Ruhr Va...
Transforming Landscapes-The Inspiring Journey of Restoring Mines, the Ruhr Va...Transforming Landscapes-The Inspiring Journey of Restoring Mines, the Ruhr Va...
Transforming Landscapes-The Inspiring Journey of Restoring Mines, the Ruhr Va...
 
CIP Presentation Abdul Jabbar Shahani 2.pptx
CIP Presentation Abdul Jabbar Shahani 2.pptxCIP Presentation Abdul Jabbar Shahani 2.pptx
CIP Presentation Abdul Jabbar Shahani 2.pptx
 
The IFLA ENSULIB Webinar Series #11: The Walking Librarians in Kerala
The IFLA ENSULIB Webinar Series #11: The Walking Librarians in KeralaThe IFLA ENSULIB Webinar Series #11: The Walking Librarians in Kerala
The IFLA ENSULIB Webinar Series #11: The Walking Librarians in Kerala
 
Winter Springs Sediment Removal: A Major Step Forward
Winter Springs Sediment Removal: A Major Step ForwardWinter Springs Sediment Removal: A Major Step Forward
Winter Springs Sediment Removal: A Major Step Forward
 
Issues regarding the provision of the Convention. Introduction to the Text an...
Issues regarding the provision of the Convention. Introduction to the Text an...Issues regarding the provision of the Convention. Introduction to the Text an...
Issues regarding the provision of the Convention. Introduction to the Text an...
 
Objectives and main international biodiversity events during the upcoming Hun...
Objectives and main international biodiversity events during the upcoming Hun...Objectives and main international biodiversity events during the upcoming Hun...
Objectives and main international biodiversity events during the upcoming Hun...
 
Planning and Designing Green buildings-.issues, options and strategies
Planning and Designing Green buildings-.issues, options and strategiesPlanning and Designing Green buildings-.issues, options and strategies
Planning and Designing Green buildings-.issues, options and strategies
 
Identifying ecologically or biologically significant marine areas: a national...
Identifying ecologically or biologically significant marine areas: a national...Identifying ecologically or biologically significant marine areas: a national...
Identifying ecologically or biologically significant marine areas: a national...
 
Green minimalist professional Business Proposal Presentation.pptx
Green minimalist professional Business Proposal Presentation.pptxGreen minimalist professional Business Proposal Presentation.pptx
Green minimalist professional Business Proposal Presentation.pptx
 

MẪU TỦ ĐIỆN.pdf

  • 1. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H CLIENT VENDOR N/A 1 DÂY CHUYỀN PHÂN LOẠI NARIME Title IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 DÂY CHUYỀN PHÂN LOẠI NARIME Total page : Project 20 Intech_2021 ELECTRICAL CIRCUIT DIAGRAM Code DH001833 INTECH GROUP-2022 VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY Address: Lot 5+6 Lai Xa Industrial Park, Kim Chung Commune, Hoai Duc District, Ha Noi Tel: (+84)24 66 806 795 Website: www.intechvietnam.com - Email: info@intech-group.vn
  • 2. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H CLIENT VENDOR N/A 2 DÂY CHUYỀN PHÂN LOẠI NARIME Table of contents IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 Page 1 3 7 Table of Contents 7a 10 B Date Rev. Drawing name Title Symbol of Device Power Supply 380VAC Page 2/2 Power Distribution 02/12/2022 14 15 PLC Input 01 (X00-X17) Page 1/2 PLC Input 02 (X20-X37) Page 2/2 Layout In/Out Signal Input CV Layout In/Out Signal Check CV Layout In/Out Signal Main CV 2 Table of contents 11 B B B B B B B B B B B B B B B 02/12/2022 02/12/2022 4 B Single Line Diagram Of System 02/12/2022 5a B Layout Of Cabinet Page 1/2 02/12/2022 5b B Layout Of Cabinet Page 2/2 02/12/2022 02/12/2022 02/12/2022 02/12/2022 02/12/2022 02/12/2022 02/12/2022 02/12/2022 02/12/2022 02/12/2022 02/12/2022 02/12/2022 02/12/2022 02/12/2022 12 13 6 Power Supply 380VAC Page 1/2 Power Supply 220VAC Page 1/2 8 Power Supply 220VAC Page 2/2 9 Power Supply 24VDC 16 PLC Output 01 (Y00-Y17) Page 1/2 17 PLC Output 02 (Y20-Y37) Page 2/2
  • 3. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H CLIENT VENDOR N/A 3 DÂY CHUYỀN PHÂN LOẠI NARIME Symbol of Device IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 MCCB PS PLC HMI BT INVT BL SS SK MCB SIGN EXPLAIN Moulded Case Circuit Breaker Miniature Circuit Breaker Power Supply DC Program Logic Controller Human-Machine-Interface Button Inverter Lamp Sensor Socket NF Noise Filter TL Tower Lamp RL Relays, contactors SW Switch SP Speed Controller BT BL Button Lamp
  • 4. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H CLIENT VENDOR N/A 4 DÂY CHUYỀN PHÂN LOẠI NARIME Single Line Diagram Of System IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 Button + Lamp PS (S8FS-C35024) PLC (FX5U-64MT/ES) Power Supply (3 phases 380V, 50HZ) MCB (BKN 3P 6A) MCB (BKN 3P 63A) NF (RSHN-2020) INVT (LSLV0015G100 -4EOFN) Motor (1.5 kW) Tower Lamp MCB (BKN 3P 6A) INVT (LSLV0004G100 -4EOFN) Motor (0.37 kW) INVT (LSLV0004G100 -4EOFN) Motor (0.37 kW) MCB (BKN 2P 20A) HMI Sensor Rơ le Remote I/O
  • 5. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A CLIENT VENDOR N/A IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H 5a DÂY CHUYỀN PHÂN LOẠI NARIME Layout Of Cabinet Page 1/2 Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 HÔNG BÊN TRÁI HÔNG BÊN PHẢI MẶT TRƯỚC 800 ∅22 192 138 65 300 50 180 (Kích thước theo thực tế) 300 150 127 85 77 180 300 150 1300 1100 200 124 124 124 100 124 488 140
  • 6. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A CLIENT VENDOR N/A IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H 5b DÂY CHUYỀN PHÂN LOẠI NARIME Layout Of Cabinet Page 2/2 Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 PANEL MẶT TRƯỚC 40W x 60D DUCT LABEL PANEL ĐÁY 40W x 60D DUCT 40W x 60D DUCT CHÂN ĐẾ (MẶT SAU) 900 550 180 170 230 120 40W x 60D DUCT 40W x 60D DUCT 40W x 60D DUCT 40W x 60D DUCT 30 100 250 150 275 800 400 200 60 150 Khóet lỗ đi dây điện 800 PULL
  • 7. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H CLIENT VENDOR N/A 6 DÂY CHUYỀN PHÂN LOẠI NARIME Power Distribution IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 1.5 Red 1.5 Yellow 1.5 Blue 1.5 Black 1.5 Yellow/Green 2.5 Red 2.5 Yellow 2.5 Blue 1.5 Black N R1 S1 T1 R S T R0 S0 T0 2.5 Red 2.5 Yellow 2.5 Blue 1.5 Black 1.5 Red 1.5 Yellow 1.5 Blue 1.5 Red 1.5 Yellow 1.5 Blue 1.5 Red 1.5 Black R1 S1 T1 R1 S1 T1 R1 N R2 S2 T2 R3 S3 T3 L1 N1 1.5 Red 1.5 Yellow 1.5 Blue 1.5 Red 1.5 Yellow 1.5 Blue 1.5 Red 1.5 Black 1.5 Red 1.5 Black FUSE1 FUSE2 FUSE3 6F1 GIGA18W 6F2 GIGA18W 6F3 GIGA18W PE YW1P-1EQM3S 6H3 YW1P-1EQM3Y 6H2 YW1P-1EQM3R 6H1 R S T N PE 1 2 3 4 5 6 BKN 3P 63A 6MCB1 1 2 3 4 5 6 6MCB2 BKN 3P 6A 1 2 3 4 5 6 6MCB3 BKN 3P 6A 1 2 3 4 6MCB4 BKN 2P 20A 1 2 3 4 6NF1 RSHN-2020 R1 / T1 / S1 / N / R2 7.0:A S2 7.0:A T2 7.0:B R3 7a.0:A S3 7a.0:A T3 7a.0:A L1 8.0:A N1 8.0:A L2 9.0:A N2 9.0:A
  • 8. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H CLIENT VENDOR N/A 7 DÂY CHUYỀN PHÂN LOẠI NARIME Power Supply 380VAC Page 1/2 IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 1.5 Red 1.5 Yellow 1.5 Blue 7INVT#1 LSLV0015G100-4EOFN G100 TB-01 1.5 Red 1.5 Yellow 1.5 Blue 1.5 Yellow/Green Cable VTCF 4x1.5 1.5 Yellow/Green 1.5 Red 1.5 Yellow 1.5 Blue 1.5 Yellow/Green 1.5 Red 1.5 Yellow 1.5 Blue 1.5 Yellow/Green Cable CC-Link (FANC-110SBH) B SG A U1 V1 W1 PE 7M1 (1.5 kW) Main Conveyor 3 M U1 V1 W1 PE W PE V U L1 L2 L3 S+ S- PE PE S2 / 6.5:F R2 / T2 / T2 / 6.6:F R2 / 6.5:F S2 / PE / 7.11:B PE / 7.0:B SG 7a.4:E A 7a.4:E B 7a.4:E
  • 9. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H CLIENT VENDOR N/A 7a DÂY CHUYỀN PHÂN LOẠI NARIME Power Supply 380VAC Page 2/2 IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 1.5 Red 1.5 Yellow 1.5 Blue 7aINVT#1 LSLV0004G100-4EOFN TB-01 1.5 Red 1.5 Yellow 1.5 Blue 1.5 Yellow/Green Cable VTCF 4x1.5 1.5 Yellow/Green G100 1.5 Red 1.5 Yellow 1.5 Blue 1.5 Yellow/Green 1.5 Yellow/Green 1.5 Red 1.5 Yellow 1.5 Blue 7aINVT#2 LSLV0004G100-4EOFN TB-01 1.5 Red 1.5 Yellow 1.5 Blue 1.5 Yellow/Green Cable VTCF 4x1.5 G100 1.5 Red 1.5 Yellow 1.5 Blue 1.5 Yellow/Green Cable CC-Link (FANC-110SBH) Cable CC-Link (FANC-110SBH) SG B A B SG A PE W PE V U L1 L2 L3 PE U2 V2 W2 PE 7aM1 (0.37 kW) Input Conveyor 3 M U2 V2 W2 PE W PE V U L1 L2 L3 PE U3 V3 W3 PE 7aM2 (0.37 kW) Check Conveyor 3 M U3 V3 W3 S+ S- PE S+ S- PE x2 x1 7R1 110Ω S3 / 6.7:F R3 / T3 / T3 / 6.7:F R3 / 6.7:F S3 / PE / 7a.11:B PE / 7a.0:B SG 7.6:F A 7.6:F B 7.6:F SG A B
  • 10. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H CLIENT VENDOR N/A 8 DÂY CHUYỀN PHÂN LOẠI NARIME Power Supply 220VAC Page 1/2 IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 1.5 Black 1.5 Red 1.5 Black 1.5 Red 8SK1 AC30-124 L1.1 L1 N1 1.5 Black 1.5 Red 1.5 Black 1.5 Black 1.5 Red 1.5 Red 1.5 Green/Yelow L1.2 1.5 Black 1.5 Red L1 L1 N1 N1 x1 x2 8Lamp1 LEDMF03 1 2 8FAN1 FK 6622.230 M 1~ PE 6 5 /10.3:D 10RL1 2 3 10RL1 /10.3:D N1 / 6.9:F L1 / 6.8:F L1 / 8.2:G N1 / 8.2:G L1 8.11:A N1 8.11:A
  • 11. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H CLIENT VENDOR N/A 9 DÂY CHUYỀN PHÂN LOẠI NARIME Power Supply 220VAC Page 2/2 IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 1.5 Black 1.5 Red 9HMI1 (GS2107-WTBDN) 0.5 White 0.5 Blue P24 N24 1.5 Red 1.5 Black 0.5 White 0.5 Blue 1.5 Green/Yelow 1.5 Green/Yelow 1.5 Green/Yelow L2 N2 1.5 Black 1.5 Red Ethernet PLC 0.5 White 0.5 Blue 9PLC1 FX5U-64MT/ES L2 N2 Ethernet HUB 9Hub1 TL-SG105 24V 0V PE PE L N PE PE L 24V 0V N 9PS1 S8FS-C35024 PE L N 1 2 3 4 5 N2 / 6.10:F L2 / 6.9:F L2 / N2 / P24 / 10.0:A N24 / 10.0:A
  • 12. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H CLIENT VENDOR N/A 10 DÂY CHUYỀN PHÂN LOẠI NARIME Power Supply 24VDC IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 0.5 White 0.5 Blue 10-1 11 12 10SW1 ZCN-R504C 14 13 10RL1 RJ2S-CL D24 3 2 /8.3:B 5 6 /8.3:D N24 / 9.11:D P24 / 9.11:D P24 / 11.0:A N24 / 11.1:A
  • 13. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H CLIENT VENDOR N/A 10 DÂY CHUYỀN PHÂN LOẠI NARIME Communication Wiring IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 SDA SDB RDA RDB SG Master 10PLC1 Slave 2 7aInvt1 Resister 110 Ohm 1/2W Cable CC-Link (FANC-110SBH) Slave 3 7aInvt2 S+ S- PE Slave 1 7Invt1 Cable CC-Link (FANC-110SBH) S+ S- PE Cable CC-Link (FANC-110SBH) S+ S- PE Resister 110 Ohm 1/2W B SG A PE PE PE PE
  • 14. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H CLIENT VENDOR N/A 11 DÂY CHUYỀN PHÂN LOẠI NARIME PLC Input 01 (X00-X17) Page 1/2 IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 TERMINAL ADRESS SW_Auto/Man BT_Start COM + SS_CV_Pos1 COMMENT S/S 0.5 White 0.5 Blue BT_Stop BT_Reset BT_EMG SS_Input_CV BT_Origin SS_Trigger SS_CV_Pos3 SS_CV_Pos2 SS_CV_Pos5 SS_CV_Pos4 0.5 White X00 X01 X02 X03 X04 X05 X06 X07 X10 X11 X12 X13 X14 X15 X16 X17 S/S SS_CV_Pos6 SS_CV_Pos7 SS_Door_1 Brown Black Blue Brown Black Blue Brown Black Blue Brown Black Blue Brown Black Blue Brown Black Blue Brown Black Blue Brown Black Blue Brown Black Blue Black Brown Blue TB-02 Cable 16x0.5 X00 X01 X02 X03 X04 X05 X06 X07 X10 X11 X12 X13 X14 X15 X16 X17 0.5 Blue 9PLC1 FX5U-64MT/ES P24 11SS1 (PZ-G62N) - + 11SS2 (PZ-G62N) - + 11SS3 (PZ-G62N) - + 11SS4 (PZ-G62N) - + 11SS5 (PZ-G62N) - + 11SS6 (PZ-G62N) - + 11SS7 (PZ-G62N) - + 11SS8 (PZ-G62N) - + 11SS9 (PZ-G62N) - + 11SS10 (PZ-G62N) - + N24 P24 N24 P24 N24 P24 N24 P24 N24 P24 N24 P24 N24 P24 N24 P24 N24 P24 N24 P24 N24 X01 X03 X04 X05 X06 X07 X10 X11 X12 X13 X14 X15 X16 X02 X00 X17 13 14 11SW1 YW1S-2E10 Auto/Manual 13 14 11BT1 YW1L- MF2E10Q4G Start 11 12 11BT2 YW1L- MF2E01Q4R Stop 13 14 11BT3 YW1L- MF2E10Q4Y Reset 13 14 11BT4 YW1L- MF2E10Q4G Origin 11 12 11BT5 YW1B- V4E11R EMG N24 / 10.11:A P24 / 10.11:A P24 / 12.1:A N24 / 12.1:A
  • 15. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H CLIENT VENDOR N/A 12 DÂY CHUYỀN PHÂN LOẠI NARIME PLC Input 02 (X20-X37) Page 2/2 IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 TERMINAL ADRESS SS_Door_2 SS_Door_3 COMMENT 0.5 White 0.5 Blue SS_Door_4 SS_Door_5 SS_Door_7 SS_Door_NG SS_Door_6 Spare Spare Spare Spare Spare Spare X20 X21 X22 X23 X24 X25 X26 X27 X30 X31 X32 X33 X34 X35 X36 X37 Brown Black Blue Brown Black Blue Brown Black Blue Brown Black Blue TB-03 0.5 Blue Cable 16x0.5 Brown Black Blue Brown Black Blue Brown Black Blue X20 X21 X22 X23 X24 X25 X26 X27 X30 X31 X32 X33 X34 X35 X36 X37 9PLC1 FX5U-64MT/ES Spare Spare Spare 12SS1 (PZ-62N) - + 12SS2 (PZ-62N) - + 12SS3 (PZ-62N) - + 12SS4 (PZ-62N) - + P24 N24 P24 N24 P24 N24 P24 N24 X21 X23 X24 X25 X26 X32 X33 X34 X35 X36 X22 X20 X37 12SS5 (PZ-62N) - + 12SS6 (PZ-62N) - + 12SS7 (PZ-62N) - + P24 N24 P24 N24 P24 N24 X27 X30 X31 N24 / 11.11:A P24 / 11.11:A P24 / 13.1:A N24 / 13.1:A
  • 16. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H CLIENT VENDOR N/A 13 DÂY CHUYỀN PHÂN LOẠI NARIME PLC Output 01 (Y00-Y17) Page 1/2 IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 TERMINAL ADRESS BL_Start Y00 Y01 Y02 Y03 Y04 Y05 Y06 Y07 Y10 Y11 Y12 Y13 Y14 Y15 Y16 Y17 BL_Stop TL_Red TL_Yellow TL_Green TL_Buzzer Valve_Door1 Valve_Door2 Valve_Door3 Valve_Door4 Valve_Door5 BT_Reset BT_Origin COMMENT TB-03 COM0 0.5 White 0.5 Blue 0.5 Blue 0.5 Blue 0.5 Blue 0.5 Blue 0.5 Blue 0.5 Blue 0.5 Blue 0.5 Blue 0.5 Blue 0.5 Blue 0.5 Blue 0.5 Blue 0.5 Blue 0.5 Blue 0.5 Blue 0.5 Blue Y00 Y01 Y02 Y03 Y04 Y05 Y06 Y07 Y10 Y11 Y12 Y13 Y14 Y15 Y16 Y17 COM0 COM1 COM1 COM2 COM2 13TL1 (ST56L-BZ-3-24-RAG) Red Yellow Green Brown Black 0.5 White 0.5 White 0.5 White 0.5 White 0.5 White 0.5 White 0.5 White 0.5 White 0.5 White 9PLC1 FX5U-64MT/ES Com Com Com Valve_Door7 Valve_Door6 Spare Y01 Y03 Y04 Y05 Y06 Y07 Y10 Y11 Y12 Y13 Y14 Y15 Y16 Y02 Y00 Y17 N24 x1 x2 11BL1 YW1L- MF2E10Q4G Start x1 x2 11BL2 YW1L- MF2E01Q4R Stop x1 x2 11BL3 YW1L- MF2E10Q4Y Reset x1 x2 11BL4 YW1L- MF2E10Q4G Origin P24 P24 x1 x2 x1 x2 x1 x2 x1 x2 P24 P24 P24 x1 x2 13V1 VX220A AXNB x1 x2 13V2 VX220A AXNB x1 x2 13V3 VX220A AXNB x1 x2 13V4 VX220A AXNB x1 x2 13V5 VX220A AXNB P24 P24 P24 P24 x1 x2 13V6 VX220A AXNB x1 x2 13V7 VX220A AXNB N24 / 12.11:A P24 / 14.1:A P24 / 12.11:A N24 / 14.1:A
  • 17. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H CLIENT VENDOR N/A 14 DÂY CHUYỀN PHÂN LOẠI NARIME PLC Output 02 (Y20-Y37) Page 2/2 IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 TERMINAL ADRESS Spare Spare Spare Spare Spare Spare Spare Spare Spare Spare Spare Spare Spare Spare Spare Spare COMMENT TB-03 0.5 White 0.5 Blue 0.5 Blue Y20 Y21 Y22 Y23 Y24 Y25 Y26 Y27 Y30 Y31 Y32 Y33 Y34 Y35 Y36 Y37 COM3 COM4 COM5 COM3 COM4 COM5 Y20 Y21 Y22 Y23 Y24 Y25 Y26 Y27 Y30 Y31 Y32 Y33 Y34 Y35 Y36 Y37 0.5 Blue 9PLC1 FX5U-64MT/ES Com Com Com Y21 Y23 Y24 Y25 Y26 Y27 Y30 Y31 Y32 Y33 Y34 Y35 Y36 Y22 Y20 Y37 N24 N24 / 13.11:A P24 / P24 / 13.11:A N24 /
  • 18. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H CLIENT VENDOR N/A 15 DÂY CHUYỀN PHÂN LOẠI NARIME Layout In/Out Signal Input CV IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 X06 7aM1
  • 19. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H CLIENT VENDOR N/A 16 DÂY CHUYỀN PHÂN LOẠI NARIME Layout In/Out Signal Check CV IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 X07 7aM2 Y04 Y05 Y06 Y07
  • 20. A3 EPLAN ELECTRIC TITLE: Scale: Purchaser Doc. No.: Vendor Doc. No.: REV: VIET NAM INDUSTRIAL AND TECHNICAL GROUP JOINT STOCK COMPANY BY CHECKED STATUS REV. DATE REVISION DESCRIPTION DESIGN BY BY APPROVED N.T.S (INTECH GROUP.,JSC) B 0 1 2 3 4 5 6 7 8 9 10 11 H G F E D C B A 0 1 2 3 4 5 6 7 8 9 10 11 A B C D E F G H CLIENT VENDOR N/A 17 DÂY CHUYỀN PHÂN LOẠI NARIME Layout In/Out Signal Main CV IFR A ISSUED FOR REVIEW NOTE: IFA B ISSUED FOR APPROVAL Mr.Tới Mr.Tới Mr.Ngọc Mr.Ngọc Mr.Anh Mr.Anh 12/21/2021 12/21/2021 X10 X17 X11 X20 X12 X21 X13 X22 X14 X23 X15 X24 X16 X25 X26 7M1 Y14 Y13 Y15 Y16 Y17 Y20 Y21