Architecture
of
NATURE
By : Yap Wei Tyng 0314058
Content
1. Company profile
2. Organization structure
3. Architectural Service
4. Completed project
5. Personal Details
6. ...
Company Profile
Company Name: Architect of Nature Sdn Bhd
Office Location: Block2-02-1,Taman Tun Ismail,
Jalan Ampang,5510...
Organization Structure
Architect
(LAM Part III)
Project Manager Accountant
Assistant
Architect
Clerk
Site Manager
Supervis...
Architectural Service
Pre-Design
Assisting with formulation of a brief; bulk and location studies;
evaluation of propertie...
Completed Project
Project name: Subang street Apartment
Building type: Residential
Project cost: RM 100,000
Project name: ...
Personal Detail:
Name: Yap Wei Tyng
Address: Block2-02-1,Taman Tun Ismail, Jalan Ampang,
55100,Kuala Lumpur
Telephone: 012...
Financial Information
Registration Company Number: SA0094065-W
Authorized Capital: RM 100,000
Paid up Capital: RM20,000
Re...
Building and Process
Role of an Architect
•Architect is the one who came out the design of the Smart.
•Determine the mater...
Standard Service for Architect
Stage1: Inception
•Meet up with client to receive client’s requirement for the project
Stag...
Presentation12345
Presentation12345
Presentation12345
Presentation12345
Presentation12345
Presentation12345
Presentation12345
Presentation12345
Upcoming SlideShare
Loading in …5
×

Presentation12345

323 views

Published on

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
323
On SlideShare
0
From Embeds
0
Number of Embeds
65
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Presentation12345

  1. 1. Architecture of NATURE By : Yap Wei Tyng 0314058
  2. 2. Content 1. Company profile 2. Organization structure 3. Architectural Service 4. Completed project 5. Personal Details 6. Financial Information 7. Building and Process
  3. 3. Company Profile Company Name: Architect of Nature Sdn Bhd Office Location: Block2-02-1,Taman Tun Ismail, Jalan Ampang,55100, KL Telephone: 012-3456987 Fax: 03-98761234 E-mail: archinature@gmail.com Website: archinature.com.my Director: Nicholas Yap
  4. 4. Organization Structure Architect (LAM Part III) Project Manager Accountant Assistant Architect Clerk Site Manager Supervisor Assistant Accountant Clerk Secretary Chua Kong Sean Director Yap Wei Tyng
  5. 5. Architectural Service Pre-Design Assisting with formulation of a brief; bulk and location studies; evaluation of properties; feasibility studies; resource consent applications; encroachment license applications; arranging land surveys and geotechnical reports. Sketch Design Space planning; architectural design; engaging consultants; preliminary estimates of cost. Documentation Coordination of consultants; detailed construction documentation; comprehensive specifications; color schemes; building consent applications.
  6. 6. Completed Project Project name: Subang street Apartment Building type: Residential Project cost: RM 100,000 Project name: Ampang street Apartment Building type: Residential Project cost: RM 120,000 Project name: Happy Marketing Office Fitout Building type: Commercial Project cost: RM 300,000
  7. 7. Personal Detail: Name: Yap Wei Tyng Address: Block2-02-1,Taman Tun Ismail, Jalan Ampang, 55100,Kuala Lumpur Telephone: 012-3456987 Fax: 03-98761234 E-mail: archinature@gmail.com Website: archinature.com.my Date of Birth: 15 March 1995 Nationality: Malaysia Academic Qualification Bachelor of Architecture ( Taylor’s University, School of Architecture, Malaysia ) PROFESSIONAL ASSOCIATIONS: Associate of Malaysia Hijjas Kasturi Associates Sdn Bhd
  8. 8. Financial Information Registration Company Number: SA0094065-W Authorized Capital: RM 100,000 Paid up Capital: RM20,000 Registered Bank: Maybank _______________________ ______________________ Director Secretary Yap Wei Tyng Adrean Chua Kong Sean
  9. 9. Building and Process Role of an Architect •Architect is the one who came out the design of the Smart. •Determine the materials needed for the Smart’s roof, wall, floors and more to suit the weather, the condition in the environment. •Submit modification of the design of Smart during construction to contractor. •Closely supervise the construction company to ensure the building is built according to building plans. •Give advices to the client on the cost of the Smart building. •Architect recommends alternative solution to resolve any variations to original budgets. •Conduct an assessment of the site for the owner. •Consider the operations and performance of the facilities and make recommendations for maintenance and improvement. •Assign the building for approval of authorities.
  10. 10. Standard Service for Architect Stage1: Inception •Meet up with client to receive client’s requirement for the project Stage2: Concept •Prepare initial design and suitable material for the project building •Availability for the cost Stage3: Design Development •Review the costing, design and programme with the consultant Stage4: Documentation •Prepare documentation for the local authority •Complete construction documentation Stage5 :Construction •Handover site to the contractor Stage6: Close out •Project done and finalize the project

×