Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

E Governance Design & Implementation

728 views

Published on

Final Year Projects, IEEE Projects, Final Year Projects in Chennai, Final Year IEEE Projects, final year projects, college projects, student projects, java projects, asp.net projects, software projects, software ieee projects, ieee 2009 projects, 2009 ieee projects, embedded projects, final year software projects, final year embedded projects, ieee embedded projects, matlab projects, microcontroller projects, vlsi projects, dsp projects, free projects, project review, project report, project presentation, free source code, free project report, Final Year Projects, IEEE Projects, Final Year Projects in Chennai, Final Year IEEE Projects, final year projects, college projects, student projects, java projects, asp.net projects, software projects, software ieee projects, ieee 2009 projects, 2009 ieee projects, embedded projects, final year software projects, final year embedded projects, ieee embedded projects, matlab projects, final year java projects, final year asp.net projects, final year vb.net projects, vb.net projects, c# projects, final year c# projects, electrical projects, power electronics projects, motors and drives projects, robotics projects, ieee electrical projects, ieee power electronics projects, ieee robotics projects, power system projects, power system ieee projects, engineering projects, ieee engineering projects, engineering students projects, be projects, mca projects, mtech projects, btech projects, me projects, mtech projects, college projects, polytechnic projects, real time projects, ieee projects, non ieee projects, project presentation, project ppt, project pdf, project source code, project review, final year project, final year projects

Published in: Technology, Art & Photos
  • Be the first to comment

  • Be the first to like this

E Governance Design & Implementation

  1. 1. E-GOVERNANCE DESIGN & IMPLEMENTATION e-Governance Solutions for Better Governance E-Governance manages the entire details of all departments of the Government. It keeps track of the each movement of the concerned officials. The details pertaining to each and every department are maintained so that the WHAT IS E-GOVERNANCE? delay and the corruption in the implementation of the Government scheme E-governance or electronic will be reduced. governance may be defined as delivery of government services In automating the above process the and information to the public using project is divided into three modules. electronic means. Department Module Such means of delivering information is often referred to as Scheme Module information technology or 'IT' in Scheme Description Module short form. Use of IT in government DEPARTMENT MODULE facilitates an efficient, speedy This module captures all the details of the and transparent process for department like dcode, dname, and disseminating information to the authority. public and other agencies, and Once the details are entered and are found for performing government to be consistent, information pertaining to the administration activities. department is added to the system. SCHEME MODULE The details pertaining to scheme concerning the module are stored in the system for ready reference such as the Dcode, Dname, Scode, Sname, Date, Duration, and Authority. The details pertaining to the existing schemes are displayed in the screen. SCHEME DESCRIPTION MODULE This module consists of Dcode, Dname, Scode, Sname, Estimation Cost, Allotment Cost, and Source of amount. In this module we enter the dcode the corresponding fields dname, scode, sname are selected from the scheme table automatically. These details are displayed in the screen. OBJECTIVE SYSTEM E-Governance is aimed in the activities of the Government. It keeps track of the each movement of the concerned officials. The main advantage is we can save the manpower, time and money. It is very helpful to the higher officials to know about the exact status of the scheme. So that all departments maintain there own database to collect and send the information between higher and lower levels.
  2. 2. PROPOSED SYSTEM System analysis focuses on specifying what the system or application required to do. It allows individuals see logical elements (what the system should do) apart from the physical component it uses (computers, terminals and storage system). It is the process of gathering and interpreting facts, diagnosing problem and using the information to recommend improvements to the system. The existing system is the manual system. The manual system is prone to error. It is time consuming. It is very difficult for a person to produce report. There are chances for changing the scheme report and do malpractice. This system involves a lot of manual entries with the applications to perform the desired task. The proposed system is designed to eliminate the drawbacks of the existing system. It is designed by keeping to eliminate the drawbacks of the present system in order to provide a permanent solution to the problems. The primary aim of the new system is to speedup transactions. The report is prepared for the schemes and implemented by the concerned officials. NEED FOR COMPUTERIZATION Computerizing the activities of the Government, we can save the manpower, time and money. All Departments maintain their own database to collect and send the information between Higher and Lower levels. This project is made online so that the concerned departments can directly enter and receive the information. For example, let us have a look at the computerization of the Educational Department. Recently H.O had introduced a new scheme for the welfare of the school students. Step 1 : In this G.O is sent to the concerned department. Step 2 : Educational Minister sends this G.O to every district Chief educational officers. Step 3 : Chief educational officers collect the information from the schools. Step 4 : The collected information’s are sent to Education Ministry via chief educational officers. Step 5 : The education Ministry analyses the reports and the consolidated reports are sent to the HO Step 6 : Based on the consolidated reports, the finance ministry sanctions the amount to that scheme. Step 7 : All people can see the present status of this scheme. SYSTEM CONFIGURATION NODE - CLIENT Intel PIII 512 MB RAM 40 GB IDE HDD & EIDE ctrl card 15 SVGA color monitor SERVER • Intel stl2 server motherboard dual processor 1GHZ • 512 MB ECCRAM • 2*18 GB SCSI HDD with Ultra Wide SCSI Controlled Card • 52X CDROM • 15 INCH SVGA color monitor
  3. 3. • 104 Key Keyboard • 250 MB 2PP Drive • 2USB port, 2 Serial &Parallel Port • 10/100 Ethernet Card • Server Cabinet • 104 Keys Keyboard • ATX Cabinet • 2USB Port, 2 Serial & 1 Parallel Port • 10/100 Ethernet Card • ATX Cabinet SOFTWARE • ASP.NET, HTML • ACCESS / SQL Server / Oracle • Windows XP / 2000 OS Future of E-Governance In the Future E-Governance will be applicable & available in the following areas, fully functional & effective Transport Municipalities / Urban Development Land Records Education Healthcare Dairy Ports & Shipping Co-operative sector / Nodal agencies VAT / Sales Tax Insurance Property Registration Citizen Service Centers Why E-Governance Better governance - The cost efficient way • Government information resources are invaluable assets-the fuel of the state's economy. • This information has to be readily located, analyzed, and exchanged between government and citizens and between government agencies-by adhering to privacy and security obligations. • You require a highly cost-efficient and proven technology solution to be used as a cost-efficient enabler to make these happen
  4. 4. E-GOVERNANCE - PROJECT DESCRIPTION This project concept is implemented in one of the State Government process and is fully computerized named as "E-Government". It keeps track of the each movement of the concerned officials. It generates reports as the output. The project consists of the main screen as Department Information Scheme Estimation Information Scheme Information Reports DEPARTMENT INFORMATION Select the department information, it goes to the department html page for inserting the records. The person has to enter the department details like dcode, dname, and authority. Click on the submit button the values are inserted into the department table. SCHEME INFORMATION Select the scheme information, it goes to the scheme html page for inserting the records. The person has to enter the scheme details like dcode, scode, sname, date, duration. The details are entered then click on the submit button the dname for the corresponding dcode value is taken from the department table and inserted into the department table. SCHEME ESTIMATION INFORMATION Select the Scheme Estimation Information, it goes to the scheme html page for inserting the records. The person has to enter the scheme estimation values like dcode, scode, ecost, and acost, source of amount. The dname and the sname are taken from the department and scheme table for the corresponding dcode and scode and are inserted into the scheme estimation table. DEPARTMENT REPORT: SINGLE REPORT, ENTIRE REPORT Single Report:- Here the dcode alone is given as input. It is checked from the department table. If it exists then the details about the department is generated as a report. Entire Report:- Here on clicking the report button all the details about the entire department is displayed. SCHEME REPORT: INDIVIDUAL REPORT, ENTIRE REPORT Individual Report:- Here the scode alone is given as input. It is checked from the scheme table. If it exists then the details about the scheme is generated as a report. Entire Report:- Here on clicking the report button all the details about the entire scheme details are displayed. SCHEME STATUS REPORT: SCHEME STATUS, COMPLETED SCHEME, UNCOMPLETED SCHEME Scheme Status:- Under this we know the status of each scheme. That is we enter scheme code, it will display the scheme is controlled by Minister or Director or DEO (District Educational Officer). Completed Scheme:- Here the completed schemes are generated as report Uncompleted Scheme:- Here the uncompleted schemes are generated as report

×