  1. 1. Case Study 2: Reducing pesticide pollution and managing waste
  2. 2. Case study 3: Generating electricity from slurry Food Waste + slurry electricity for • the grid The capacity of the farm is for 15,000 tonnes • of food waste per year . A Waste Management Licence will be • required
  3. 3. Main Challenges Power company are currently unsure if they • want to use it. They charge £75 000 to connect to the grid Obtaining planning permission and • agreeing a location with the planners Green belt using existing facilities

×