Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

CLRBP Presentation

673 views

Published on

Regional and Local Bike Plan presentation for public meeting.

Published in: Technology, Business
  • Be the first to comment

  • Be the first to like this

CLRBP Presentation

  1. 1. Miami Valley Comprehensive Local-Regional Bikeways Plan Public Meetings: October 22, 2008 1
  2. 2. Your Vision is Our Mission: “The Miami Valley Regional Planning Commission’s Comprehensive Local-Regional Bikeway Plan is intended to enhance region-wide bikeway networks including both regional and local bike paths and their connections throughout the MVRPC planning area.” 2
  3. 3. Ohio’s Bikeway Heritage Xenia was named the quot;5th best place in the nation to livequot; by the American Hiking Society and inducted into the Trail Town USA Hall of Fame. 3
  4. 4. The Existing System 4
  5. 5. 5
  6. 6. Opportunities • Bike on Bus/Vans • Existing Partners • Cultural / Heritage Tourism • Environmental Education • Safe Routes to Schools • New Green Movement • SAFETEA 6
  7. 7. Challenges • Rights-of-Way • On- and Off-Street Bikeways • Trail/Roadway X-ings • Funding Priorities • Declining Bike to Work Data Physical Inactivity Epidemic • Land Use/Sprawl • Aging in Place • Rural Roads / Complete Streets 7
  8. 8. Bikeway Types Shared Use Paths / Trails “In-Corridor” Bikeways Rural Roads 8
  9. 9. Task 1: Project Management Task 1 Products Final project schedule Project Contact list Monthly Conference Calls Status report to accompany invoices 9
  10. 10. Task 2: Public Involvement • YOU! • Steering Committee • Public Workshops • Project Website: www. altaplanning.com/mvrpc/ Task 2 Products Public Involvement Plan ( Technical Memo #1) (3) Steering Committee Meetings (9) Public Meetings, (3 per county) (1) Additional on-site meeting, if needed Contact lists Project Website Powerpoint Presentations Meeting Agendas, Media Releases, Meeting Summaries 10
  11. 11. Task 3: Inventory and Mapping 11
  12. 12. Task 4: Safe Routes to School Toolkit and Project Description Sheets 12
  13. 13. Task 5: Project Recommendations Draft & Final Bikeways Plan 13
  14. 14. Key Changes • Modified “complete streets’ language • Coordinated database with LRP • Updated Maps per Committee comments • Emphasized voluntary cooperation of local communities • SR2S Toolbox for each district • General edits and final formatting 14
  15. 15. 15
  16. 16. 16
  17. 17. 17
  18. 18. 18
  19. 19. MVRPC TIP and Long-Range Plan 19
  20. 20. The Long Range Plan Connection 20
  21. 21. Priority Projects • ~20 Project Description Sheets • Planning-Level Cost Opinions • Pre-Funding Applications • Corridors, Area–wide projects • “Early Wins” 21
  22. 22. The Other E’s 22
  23. 23. Task 6: Local Bikeway Action Plans 23
  24. 24. BFC Best Practices • Education • Enforcement • Encouragement • Engineering • Evaluation 24
  25. 25. Innovation 25
  26. 26. Solutions 26
  27. 27. Thank You! Alta Planning + Design www.altaplanning.com/mvrpc/ Burgess & Niple www.burgessniple.com MVRPC: Kjirsten Frank www.mvrpc.org kfrank@mvrpc.org 937.531.6524 “ Determine that the thing can and shall be done, and then we shall find the way.” Abraham Lincoln 27

×