LCA insulation materials

1,327 views

Published on

polyurethane insulation material life cycle assessment integration in building design

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,327
On SlideShare
0
From Embeds
0
Number of Embeds
21
Actions
Shares
0
Downloads
29
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

LCA insulation materials

  1. 1. Life Cycle Assessment van isolatie: y isolatie: integratie in het bouwkundig ontwerp Sam De Jongh – Matthias Van Wijnendaele
  2. 2. Uitdagingen Aarde warmt op Bouwsector 1/3 CO2 uitstoot Trias Energetica 1 Reductie 60 à 90% Isolatie 20 à 50% Sam De Jongh – Matthias Van Wijnendaele 2
  3. 3. Uitdagingen Aarde warmt op Bouwsector 1/3 CO2 uitstoot Trias Energetica 1 Reductie 60 à 90% Isolatie 20 à 50% Sam De Jongh – Matthias Van Wijnendaele 3
  4. 4. Life Cycle Assessment C dl t Cradle-to-gate t C dl t Cradle-to-grave Cradle-to-cradle C dl t dl • Ontstaan O s aa • Alle fasen in e ase • Recyclage in ecyc age • Verbeteren rekening eindfase productieproces • Gebouwen • Start in • Vergelijken • Materiaalkeuze ontwerpfase producten • Gebouwen • Leiden tot EPD • Mc Donough Sam De Jongh – Matthias Van Wijnendaele 4
  5. 5. Life Cycle Assessment Omschrijving doel en bereik Inventaris Interpretatie analyse Beoordeling impact p Sam De Jongh – Matthias Van Wijnendaele 5
  6. 6. Life Cycle Assessment Omschrijving doel en bereik Inventaris Interpretatie analyse Beoordeling impact p Sam De Jongh – Matthias Van Wijnendaele 6
  7. 7. LCA – doel en bereik Vergelijken isolatiematerialen Functionele eenheid: 1 m² spouwmuur <-> 1 kg isolatiemateriaal <-> gebouw als geheel (GreenCalc +) 60 jaar Sam De Jongh – Matthias Van Wijnendaele 7
  8. 8. Life Cycle Assessment Omschrijving doel en bereik Inventaris Interpretatie analyse Beoordeling impact p Sam De Jongh – Matthias Van Wijnendaele 8
  9. 9. LCA - inventarisatie Eco Invent 2000 – Database: 4000 datasets – Energie, transport, bouwmaterialen, afval, … Energie, bouwmaterialen, afval, – Ingebouwde energie EPD – Environmental Product Declaration – CEN – Snel consulteerbaar en overzichtelijk j Energie- Energie-efficiëntie – EPB, TRNSYS, vereenvoudiging , , g g Sam De Jongh – Matthias Van Wijnendaele 9
  10. 10. LCA - inventarisatie Onzekerheden en tijdsinstabiliteit – Transport T t – Correcte uitvoering en onderhoud – Gebruiksfase ( -> monitoring) b k f (<- (< ) – Eindfase Sam De Jongh – Matthias Van Wijnendaele 10
  11. 11. Life Cycle Assessment Omschrijving doel en bereik Inventaris Interpretatie analyse Beoordeling impact p Sam De Jongh – Matthias Van Wijnendaele 11
  12. 12. LCA – beoordeling impact Categorieën Depletion of raw material RESOURCE Use of land and space SPACE Global warming potential GWP Ozon depletion potential p p ODP Acidification potential AP Nutrification potential NP Photochemical ozone creation potential POCP Human and ecotoxicity TOXIC Non-renewable primary energy NRPE Renewable primary energy RPE Sam De Jongh – Matthias Van Wijnendaele 12
  13. 13. LCA – beoordeling impact Categorieën Depletion of raw material RESOURCE Use of land and space SPACE Global warming potential GWP Ozon depletion potential p p ODP Acidification potential AP Nutrification potential NP Photochemical ozone creation potential POCP Human and ecotoxicity TOXIC Non-renewable primary energy NRPE Renewable primary energy RPE Sam De Jongh – Matthias Van Wijnendaele 13
  14. 14. Case studies 1 m spouwmuur m² 1 1. 16 cm PUR U = 0,14 W/m²K 2. 26 cm MW 3. Niet geïsoleerd U = 2,82 W/m²K 4 Ytong 4. U = 0,58 W/m²K W/m K Norm U ≤ 0,6 W/m²K , / Sam De Jongh – Matthias Van Wijnendaele 14
  15. 15. Case studies U = 0,14 W/m²K , / Sam De Jongh – Matthias Van Wijnendaele 15
  16. 16. Case studies Primair energieverbruik kg CO2-uitstoot – 90% k l d ketelrendement – 0,056 kg CO2/MJ 1. 1 PUR 172 kg k 2. Rockwool 172 kg 3. Niet-geïsoleerd 3466 kg 4. YTONG 676 kg Sam De Jongh – Matthias Van Wijnendaele 16
  17. 17. Case studies DALY of 4 case studies over 60 years 0,80 0,70 0,60 0,50 0 50 DALY 0,40 ODP GWP 0,30 0,20 0,10 0,00 Massive PU Massive MW Uninsulated YTONG wall Sam De Jongh – Matthias Van Wijnendaele 17
  18. 18. Case studies Embodied E b di d energy vs Primary energy use Pi over 60 years per m² wall 1,20 1,00 massive PU: Embodi energy (GJ) Highest embodied 0,80 energy 0,60 ied 0,40 uninsulated wall: Highest Primary 0,20 Energy Use 0,00 0 50 100 150 200 250 Primary Energy Use (GJ) Sam De Jongh – Matthias Van Wijnendaele 18
  19. 19. Case studies Embodied energy vs Primary energy over 60 years per m² wall 1,20 1,00 16 cm MW GJ) Embodie energy (G 0,80 16 cm PU PU: Lower primary 0,60 energy use ed 0,40 0,20 0 20 0,00 2,90 3,00 3,10 3,20 Primary Energy Use (GJ) Sam De Jongh – Matthias Van Wijnendaele 19
  20. 20. Discussion Eco Invent – Voor simulaties, niet toegankelijk voor ontwerper ENP – Gemiddelde waarde 1 m² paneel (dikte, densiteit?) EPD – EPD eenvoudig, maar vaak onvergelijkbaar – Verdere standaardisatie CEN noodzakelijk j Sam De Jongh – Matthias Van Wijnendaele 20
  21. 21. Besluit LCA – Allesomvattend, Allesomvattend gebouwbenadering – Toekomst – Vergelijking ingebouwde energie en verbruik g j g g g – Kritische benadering data Sleutelparameters – Performantie isolatiewaarde in toepassing/tijd – λ-waarde bij beperkte isolatiedikte en gewicht – Kostevaluatie Sam De Jongh – Matthias Van Wijnendaele 21

×