Avanzament 5 - Part 2 of 2

555 views

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
555
On SlideShare
0
From Embeds
0
Number of Embeds
19
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Avanzament 5 - Part 2 of 2

  1. 1. Team Lead: Musstanser Tinauli Project Partners Waste Management Telit Telecom Italia ATT Google (tbc) Nokia (tbc)
  2. 2. Issues -- Technology Design -- Water resilience -- Environment friendly -- Waste Management System friendly -- Water proof -- Localization (when + how) -- packaging (sterol foam) + plastic bag -- strong enough -- Mobile Signal -- Behavioral Impact Algorithm -- T Turn on/off Mechanism / ff M h i -- When to send its locations -- when to wake up and when to sleep Other Ideas -- talk to your trash -- Wedding list for trash objects -- our trash connects us (face book application) --Tagging Scenarios + Visualizations + Exhibition
  3. 3. Trash Track System Maps
  4. 4. Trash Tagging Scenarios
  5. 5. Trash Track Study of the City of Seattle
  6. 6. Adobe Acrobat Document
  7. 7. Next Steps Trash Track Deployment ‐‐Deployment 2‐3 phases l h ‐‐ Deployment with New Scientist,  Architectural League and Seattle Application of the usability like experiential factors on Trash Track. Application of the usability like experiential factors on Trash Track ‐‐ Evaluation of Trash Track as a system  with reference to its effect on how people  connect themselves to their trash ‐ Introduction of a new Experiential  Factor (sustainability) Exhibition in Architectural League of New York + Seattle Public Library ‐‐ Visualizations ‐‐Video shoot + Photos with Armin Linke ‐‐ Interviews of people who will track  their trash Writing  ‐‐ Thesis h i ‐‐ Articles on the project with  TimeMagazine, New Scientist, Discovery,  BBC
  8. 8. Thank you

×