A
Presentation
on
MANJEERA GROUP
COMPANY PROFILE
• Elevating lives since 25 years
• Net worth above `1500 Millions.
• Created 3 million Sft....
MANJEERA GROUP
GROUP COMPANIES & BUSINESS VERTICALS
MANJEERA GROUP‘s BUSINESS VERTICALS:
RESIDENTIAL (Apartments / Villas ...
MANJEERA GROUP
COMPLETED PROJECTS
• Aditya Trade Centre
• Manjeera Plaza
• Aditya Enclave
• Manjeera Square
• Aditya Park
...
MANJEERA COMMERCIAL PROJECTS
ONGOING PROJECT S - BRIEF DETAILS
Building Name MANJEERA MAJESTIC
COMMERCIAL
Total Office
Spa...
DESTINATION – KUKATPALLY (KPHB)
EMPLOYEE CATCHMENT
• Kukatpally Housing Board (KPHB) is Asia's largest
residential colony ...
PROJECT - LOCATION MAP
PROJECT - SITE LAYOUT
HOME
S
MALL
CORPORA
TE
MANJEERA TRINITY
CORPORATE
PROJECT OVERVIEW
•The emerging Corporate District address is
in the hear...
10 corridors in the core area (150kms)
NH 9
BHEL
TOLICHOWKI UPPAL
PANJAGUTTAJUBILEEHILLS C.P
BEGUMPET
FALKNUMA
SECUNDERABA...
• Total Office Leasable Area: 9,50,000 Sqft
• Ample Parking on 5 Levels of Basement Floors
• Ground Floor + 18 Floors of O...
MANJEERA TRINITY CORPORATE
DESIGN FEATURES
• The building is designed based on the ‘Core & Shell’ concept under
the IGBC g...
MANJEERA TRINITY CORPORATE
DESIGN FEATURES
• Air conditioning is provided by a central variable flow chilled water recircu...
ENVIRONMENTALLY SUSTAINABLE DESIGN
GREEN REVOLUTION FOR REAL ESTATE INDUSTRY:
LEED certified building helps in conserving ...
MICRO CLIMATE ANALYSIS
WEATHER CONDITIONS
Manjeera Trinity Corporate has been designed considering the Micro Climate Analy...
ELECTRICAL USAGE SUMMARY
PER DAY CALCULATIONS
As per the IGBC Green
building design guidelines the
day and night study has...
ENERGY CONSERVATION FEATURES
• Manjeera Trinity Project comes with insulated wall and roof measures as per
the standard IG...
INDOOR POLLUTANTS CONTROL MEASURES
Main service entryways of the building directly
connected to the outdoors have been ins...
2nd to 10th Floor Office
Saleable Area in sft.
1 4937
2 6060
3 7692
4 2706
5 2742
6 2486
7 2764
8 2475
9 7703
10 5993
11 4...
EFFECTIVE VERTICAL
TRANSPORTATION
Comprehensive vertical transport system is provided with dedicated Lift Lobbies for
tota...
PROJECT SAFETY FEATURES
• Fully Automated Fire Alarm and Detection System is provided.
• Automatic Sprinkler System is ava...
DESCRIPTION BUILDING SPECIFICATIONS UNDER DEVELOPER SCOPE
STRUCTURE RCC framed structure with large column free spaces
SUP...
DESCRIPTION BUILDING SPECIFICATIONS UNDER DEVELOPER SCOPE
FIRE PROTECTION
Automatic fire detection, fire fighting & smokin...
DESCRIPTION BUILDING SPECIFICATIONS UNDER TENANT SCOPE
INTERIORS WORKS
All interiors works within the office premises are ...
ENTRANCE LOBBY
LIFT LOBBY
COMPLIANCE TO VAASTU
The broad principles of Vaastu were considered in the
design of the project. Some of the principles o...
Employee’s
Perspective
Parameter Hitec City Nanakramguda MTC
Travel time 30-45 min 45 min 5-10 min
Travel time
(2 way)
60-...
CONSTRUCTION PROGRESS
THANK
YOU !!
MANJEERA TRINITY CORPORATE PRESENTATION
MANJEERA TRINITY CORPORATE PRESENTATION
MANJEERA TRINITY CORPORATE PRESENTATION
Upcoming SlideShare
Loading in …5
×

MANJEERA TRINITY CORPORATE PRESENTATION

723 views

Published on

Trinity Corporate
Manjeera Trinity - Office Space, an iconic high rise destined to be The Metropolitan Landmark for your office need is abutting 120' wide road on west (Road connecting Kukatpally and Hitec City, adjacent to JNTU Campus, Kukatpally). Construction Commenced

Look beyond the glass façade, look beyond the prime location, look beyond the arresting 19-storied structure, look beyond the common connotations of work spaces - find a corporate space with a thoughtful design, a logic-led blueprint that works splendidly for your business.

Conceived especially for professional organizations, Manjeera Trinity Corporate offers signature office spaces ideal for fast-growing companies in the everchanging market scenario.

Supported by world-class amenities and cutting-edge styling, its seamless design gives you the flexibility to expand as you grow.Corporate spaces start from 2,300 sft. and go up to 55,000 sft., in independent and customized office modules.

Located in the 'always-on-the-move' locale of Hyderabad, JNTU-Hitech City Road, Kukatpally, this prominent high-rise is immediately distinguishable for its excellent infrastructure, impeccable detailing and abundant facilities for business and pleasure. Manjeera Trinity Corporate is a repository of all that makes for an efficient work space.Cutting-edge amenities, and well-planned areas for recreation and social interaction contribute to a stress-free ambience and greater productivity, enhancing tremendously, the quality of time spent.

Its masterly blend of functional and aesthetic excellence, makes Manjeera Trinity Corporate a next-generation commercial landmark. Spread across 900,000 sft., this signature space caters to the unique needs of a diverse corporate clientele. The design language and elevation of Manjeera Trinity Corporate speak the story of uncommon class. Spatial design intelligentsia, best-in-class architects and renowned consultants have actively contributed in the making of this project - that embraces contemporary construction techniques and safety mechanisms keeping corporate ethos and sensitivities in mind.

Another specialty is the extensive landscaping that inspires the free flow of energy and fosters
a distinctly positive work environment that blurs the work-life divide with aplomb.

Published in: Real Estate, Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
723
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
25
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

MANJEERA TRINITY CORPORATE PRESENTATION

  1. 1. A Presentation on
  2. 2. MANJEERA GROUP COMPANY PROFILE • Elevating lives since 25 years • Net worth above `1500 Millions. • Created 3 million Sft. of Commercial, residential and mixed use spaces and 5 million Sft. in the pipeline • Successfully operating 3 Hotels in Hyderabad • Manjeera Group is a member of CREDAI and IGBC (Indian Green Building Council).
  3. 3. MANJEERA GROUP GROUP COMPANIES & BUSINESS VERTICALS MANJEERA GROUP‘s BUSINESS VERTICALS: RESIDENTIAL (Apartments / Villas / Gated Communities) COMMERCIAL (Corporate Office / Software IT-ITES Parks) RETAIL (Shopping Malls / Multiplexes / Hypermarket) HOSPITALITY (Boutique Hotels / 5 star rated Hotels) MANJEERA GROUP’s COMPANIES: • Manjeera Construction Limited • Manjeera Estates Private Limited • Manjeera Hotels & Resorts Limited • Manjeera Retail Holdings Pvt. Ltd. • GM Infra Ventures Pvt. Ltd. • Manjeera Projects Limited Manjeera Constructions Ltd. the flagship company of the Group has received the ISO 9001:2000 certification for its process excellence. MCL is also listed on BSE (Bombay Stock Exchange)
  4. 4. MANJEERA GROUP COMPLETED PROJECTS • Aditya Trade Centre • Manjeera Plaza • Aditya Enclave • Manjeera Square • Aditya Park • Manjeera Nest • Aditya Hometel • Manjeera Heights – I & II • Aditya Sarovar Premier • Manjeera Residency • Manjeera Smart Home Apartments
  5. 5. MANJEERA COMMERCIAL PROJECTS ONGOING PROJECT S - BRIEF DETAILS Building Name MANJEERA MAJESTIC COMMERCIAL Total Office Space 235,000 sqft (approx) Typical Floor Plate 37,500 sqft (approx) No of Floors 3 Basements + GF + 8 Floors Building Comments Corporate Office space building Handover Date Ready for fit-outs Building Name MANJEERA TRINITY CORPORATE Total Building Area 950,000 sqft (approx) Typical Floor Plate 45,000 - 55,000 sqft (approx) No of Floors 5 Basement + GF + 18 Office Floors Building Comments LEED Gold rated Green building Handover Date Sep 2014 Completion Date Dec 2014
  6. 6. DESTINATION – KUKATPALLY (KPHB) EMPLOYEE CATCHMENT • Kukatpally Housing Board (KPHB) is Asia's largest residential colony having 40% of the total employable workforce that travel daily to work in Software IT/ ITES Corporates at HITEC City • 7.5 lakh residents living in primary areas in and around (KPHB) within a travel time of 10-15 minutes towards the project location. • 15 lakh residents living in & around surrounding secondary areas within a travel time of 30-45 minutes towards the project location. • JNTU-HITEC City Road is an emerging Commercial District with infrastructure that is gaining significance growth in this region. • Connectivity is a growth driver for this location with an under construction HITEC city Flyover Bridge and METRO Rail transport system having a station near JNTU College.
  7. 7. PROJECT - LOCATION MAP
  8. 8. PROJECT - SITE LAYOUT
  9. 9. HOME S MALL CORPORA TE MANJEERA TRINITY CORPORATE PROJECT OVERVIEW •The emerging Corporate District address is in the heart of JNTU-HITEC City Road stretch • The project location has a good network access to the twin cities of Hyderabad and Secunderabad arterial transport system • The project has been built according to the international standards and benchmarks. SITE AREA - 6.5 Acres BUILT-UP AREA - 1.8 Million Sq ft TO HITEC CITY
  10. 10. 10 corridors in the core area (150kms) NH 9 BHEL TOLICHOWKI UPPAL PANJAGUTTAJUBILEEHILLS C.P BEGUMPET FALKNUMA SECUNDERABAD CHARMINAR ASHOKNAGAR PUBLICGARDEN BOIGUDA NH 7 LIBERTY M.J.MARKET ZOO PARK PURANAPUL SAGAR RING ROAD DMRL NALGONDA X ROAD ALWAL ESI TAJICECREAM KHAIRATABAD ECIL TARNAKA LB NAGAR NH 7 BAIRAMALGUDA BOWENPALLI L - 1 L - 1 MIYAPUR HABSIGUDA (OU) JBSSHILPARAMAM L - 2 L - 3 L - 3 L - 2 AMEERPET Maytas Hill County HYDERABAD METRO RAIL: MASTER PLAN
  11. 11. • Total Office Leasable Area: 9,50,000 Sqft • Ample Parking on 5 Levels of Basement Floors • Ground Floor + 18 Floors of Office Space • 100% Power Back-up with Air-Conditioning High-side • LEED rated Gold certified Green Building Technology • High-speed internet with Wi-Fi access availability • Common business requirements have been designed to facilitate in-house occupants that include Cafeteria, Travel Desks, Conference Rooms, Banks, ATM etc. MANJEERA TRINITY CORPORATE PROJECT – BRIEF DETAILS
  12. 12. MANJEERA TRINITY CORPORATE DESIGN FEATURES • The building is designed based on the ‘Core & Shell’ concept under the IGBC guidelines and all the common area interiors inside the building area are fully finished with 100% power back-up. • The building has a seismic resistant design with accessibility for the physically challenged and an integrated built-up landscape. • Treated Fresh-Air is being supplied at all the office floors to improve air quality, thus reduces toxins, odour and provides significant reduction in energy cost of HVAC operations; eco-friendly benefits for the end user. • The building consists of stepped terraces for every four floors, sun breakers, glass facades that provide a unique characteristic. • Facade cleaning system is mounted on the terrace area with separate garbage shafts for a cleaner and greener environment.
  13. 13. MANJEERA TRINITY CORPORATE DESIGN FEATURES • Air conditioning is provided by a central variable flow chilled water recirculation system for maximum energy conservation for both the common and office work areas. • Spaces are fitted out with AHU rooms and connected to central HVAC chiller plant to enable individual customization for optimum comfort with indoor temperature. • Materials with recycled contents are prioritized and construction waste is diverted into recycle center to minimize the amount of waste going to the landfill. • The building has been designed incorporating the usage of Green Technologies with a high performance glazing system, sewage treatment plant, rain water harvesting, usage of green construction materials, recycled water management system, zero discharge of water etc.
  14. 14. ENVIRONMENTALLY SUSTAINABLE DESIGN GREEN REVOLUTION FOR REAL ESTATE INDUSTRY: LEED certified building helps in conserving natural resources thereby reducing water consumption, optimizing energy efficiency and waste management, thus giving cost effective solution GREEN CONCEPT TANGIBLE BENEFITS: • Lack of pollutants and other harmful substances in the building materials used reduces the environmental impact leading to energy and water conservation • Efficient effluent management and recycling techniques enables a relatively low amount of sewage and garbage helps in achieving a zero liquid discharge model. GREEN CONCEPT INTANGIBLE BENEFITS: • Positive social and economic impact on the residents life cycle. • Improves health, productivity and safety of its occupants • Enhances work comfort and productivity gains in employees.
  15. 15. MICRO CLIMATE ANALYSIS WEATHER CONDITIONS Manjeera Trinity Corporate has been designed considering the Micro Climate Analysis of Hyderabad City based on prevailing weather forecast, wind movement, annual precipitation measures, solar radiations and daylight temperatures that were analyzed throughout the year.
  16. 16. ELECTRICAL USAGE SUMMARY PER DAY CALCULATIONS As per the IGBC Green building design guidelines the day and night study has been conducted to ascertain the per day average calculations for: • Equipment handling • Occupancy schedule • Lighting usage to arrive at an effective average electrical usage to evolve the sustainable design features at Manjeera Trinity Corporate project
  17. 17. ENERGY CONSERVATION FEATURES • Manjeera Trinity Project comes with insulated wall and roof measures as per the standard IGBC guidelines that will re-radiate heat to control heat transfer providing reduction of energy usage and air conditioning or cooling cost loads (upto 20%) • Façade elements provide continuous rejection of solar heat to enable drastic reduction of temperature (upto 25 C) and increased comfort level for occupant • Double glazing and UV resistance façade glass provides thermal resistance against the wide temperature fluctuations prevalent in Hyderabad Metro region
  18. 18. INDOOR POLLUTANTS CONTROL MEASURES Main service entryways of the building directly connected to the outdoors have been installed with grates at least six feet long that allow for cleaning underneath, in the primary direction of travel to capture dirt and particulates from entering the building. Roll-out mats will be placed at the main front entrance and other subsidiary entrances on the building front. Building - Side Entrance Building - Front Entrance
  19. 19. 2nd to 10th Floor Office Saleable Area in sft. 1 4937 2 6060 3 7692 4 2706 5 2742 6 2486 7 2764 8 2475 9 7703 10 5993 11 4776 12 2526 13 2722 14 2767
  20. 20. EFFECTIVE VERTICAL TRANSPORTATION Comprehensive vertical transport system is provided with dedicated Lift Lobbies for total 21 Nos Passenger Lifts from MITSUBISHI m ake with Elevator Automatic Rescue Device (ARD) & VVVF Technology are valuable add on units in all elevators. Basement Lifts 3 Nos - 21 persons capacity - 1.75 m/sec speed – integrated for safety reasons Low Rise Lifts 2 Nos – From Ground to 3rd fl – 14 persons capacity - 1.75 m/sec speed Mid Rise Lifts 8 Nos. - From Ground, 4th - 10th fl – 15 persons capacity - 2.50 m/sec speed High Rise Lifts 8 Nos. - From Ground, 11th to 18th fl – 20 persons capacity - 2.50 m/sec speed Goods Lift 2 Nos – All Floors - 20 persons capacity - 1.75 m/sec speed Fire Safety Lifts 2 Nos. – All Floors – 10 persons capacity - 1.75 m/sec speed Escalators Available from Ground to First Floor to handle higher traffic volumes 11th to 18th Office Saleable Area in sft. 1 14333 2 11225 3 14412 4 6884
  21. 21. PROJECT SAFETY FEATURES • Fully Automated Fire Alarm and Detection System is provided. • Automatic Sprinkler System is available in all the office floors. • Provision of Fire Staircases & Fire Hydrants as per DGFS norms. • Helipad and Fire Refuge area are provided for Life Safety. • Integration of BMS (Building Management System) that will optimize the operations cost for the end corporate user. • Intercom facility with Wi-Fi environment along with the security is provided in all other important spaces within the building premises. • Rails are to be provided along periphery of terrace enabling cleaning staff to access entire façade on all sides. • All Electrification is provided with IS certified fixtures & fittings'
  22. 22. DESCRIPTION BUILDING SPECIFICATIONS UNDER DEVELOPER SCOPE STRUCTURE RCC framed structure with large column free spaces SUPER STRUCTURE Walls with AAC block and cement mortar PLASTERING Smooth / Sponge finished in cement mortar for internal and external walls PAINTS External walls finished in Textured Paints / Acrylic Emulsion / ACP cladding / Structural Glazing. DOORS Engineered door frames with flush shutters WINDOWS & VENTILATORS Structural glazing / Powder coated Aluminium windows / Glazing FLOORING Building Entrance Lobbies: Combination of Granite & Vitrified Tiles Inside Office Premises: 60mm IPS flooring Staircase & Service rooms: Flooring and skirting with Kota stone FLOOR PLATE AREA (SQFT) 45,000 sqft - 55,000 sqft (approx) NO OF ELEVATORS (NOS) 16 (Passenger lifts) + 2 (Service lifts) + 2 (Fire Safety lifts) FLOOR TO FLOOR HEIGHT (MTRS) 3.75 mtrs EFFICIENCY (%) 78% (+/-2) (approx) for full floor tenant
  23. 23. DESCRIPTION BUILDING SPECIFICATIONS UNDER DEVELOPER SCOPE FIRE PROTECTION Automatic fire detection, fire fighting & smoking management system in common areas like corridors, lobbies etc. (all as per DGFS / NBC codes) AIR CONDITIONING High side air-conditioning for all office spaces are under Developer scope with complete high side & low side air-conditioning for corridors & lobbies. ELECTRIFICATION Metered Power supply for each office POWER ALLOCATED 1 KVA per 100 sqft POWER BACKUP 100% Power Backup COMMUNICATION SYSTEM Wi-Fi environment for internet GREEN TECHNOLOGIES Sewage treatment plant, Zero discharge, Rain water harvesting and recycling, Usage of green construction material & technologies, Irrigation system for landscaping using STP water. BUILDING MAINTENANCE SYSTEM IBMS for effective maintenance VERTICAL TRANSPORTATION SYSTEM High speed elevators / Separate elevators for Parking floors & Service Areas SECURITY SYSTEMS CCTV / Surveillance cameras at all entry and exit points of the building PARKING All covered vehicle parking in 3 basements.
  24. 24. DESCRIPTION BUILDING SPECIFICATIONS UNDER TENANT SCOPE INTERIORS WORKS All interiors works within the office premises are under tenant scope including false ceiling, furniture, fixtures, fittings, electrical works, data-voice cabling etc. TOILETS All the interior finishes within the office premises are under tenant scope including flooring, cladding, sanitary, fixtures and fittings etc. AIR CONDITIONING All low side works inside the office premises are under tenant scope including AHU unit, ducting, diffusers etc. FIRE FIGHTING & ACCESS CONTROL All low side works inside the office premises are under tenant scope including smoke detectors, fire sprinklers, extinguishers etc.
  25. 25. ENTRANCE LOBBY
  26. 26. LIFT LOBBY
  27. 27. COMPLIANCE TO VAASTU The broad principles of Vaastu were considered in the design of the project. Some of the principles of Vaastu applied are: • Open space around the building. North and East setbacks shall be more or equal to South and West setbacks respectively • Southern Building higher than Northern building • Entries & Exits at site level and unit level. • Placement of service utilities like sumps, D.G.s. • Avoiding toilets at North & East quadrants.
  28. 28. Employee’s Perspective Parameter Hitec City Nanakramguda MTC Travel time 30-45 min 45 min 5-10 min Travel time (2 way) 60-90 min 90 min 10-20 min WHY MANJEERA TRINITY CORPORATE ?
  29. 29. CONSTRUCTION PROGRESS
  30. 30. THANK YOU !!

×