CONTENTS
INTRODUCTION
History
Manufacturing Infrastructure
PRODUCTS MANUFACTURED
DEPARTMENT/SHOPS AND THEIR PROCESSES
CAST IRON FOUNDRY SHOP
Estimation of Cost of Castings
FABRICATION SHOP
MACHINE SHOP
TESTING
LEARNING OUTCOMES
CONCLUSION
INTRODUCTION
HISTORY
Year of Established:1949
Managing Director (S. D. Shibulal)
Established for Manufacture of equipment and spares for Bhilai Steel Plant
It soon began catering to the requirements of other Steel plant at Rourkela,
Durgapur & Bokaro.
Beekay entered the field of turnkey projects in 1987 .
Beekay has also successfully completed the construction of 600 m3 BF for Nacast,
Notable achievements recently was supply of BF & HS shells for POSCO's 4000M3 BF
project at SAIL ISP.
Beekay is accredited with ISO 9001, ISO 14001, ISO 18001, API, ASME U Stamp and
CCE approvals.
Beekay is using cutting edge technology for the manufacturing of their products.
They also have some technologies from different countries like China, Italy, etc
MANUFACTURING
INFRASTRUCTURE
PRODUCTS
MANUFACTURED
Iron Making Equipments
Blast furnace
SPONGE IRON PLANTS
Dewatering drumHot metal car
TYRE SHELL FOR 300 TPD
Steel Making Equipments
Steel making equipments
Caster equipments
RH Vacuum Degassing Vessel Twin Pot Slag Thimble Car
Addle turret Segment for slab caster
ROLLING MILL EQUIPMENTS
Pinch Roll Merchant Mill Rolling mill
COKE OVEN EQUIPMENTS
Coke quenching car waste gas valve
PRESSURE VESSELS
Vapour collecting unit Nitrogen tank
RAILWAYS
140 T Jib crane boom Engine floor frame
An Industry comprises of different types of departments and shops for the proper working
and completion of a job in a required time period with efficiency.
The different departments can be classified as :-
Marketing department.
Finance department
Planning department
Machine shop
Fabrication shop
Foundry shop
Assembly shop
Testing department
Other
DEPARTMENT/SHOPS AND
THEIR PROCESSES
The product undergoes by sequential process are :-
Enquiry done by the customer about the product to know about it and related queries.
Quotation is made to show all the specification and expected cost for a particular
product which is asked by the customer.
It involves the extra cost like excise duty ,sales tax, e-tax, etc.
A sample diagram is sent by the customer to the industry.
Finance department estimate the basic cost of the materials and other resources used.
Standards of the material are followed and if standards do not match an alternate
standard is confirmed by the customer.
Original manufacturing drawing is sent with actual specification of the size and shape.
Planning department plan a efficient way to achieve the target of the product to be made.
Manufacturing involving the different shops the product is formed.
Product is tested by the NDT department.
Delivery of the product is done.
CAST IRON
FOUNDRY SHOP
TO PRODUCE THE METAL CASTING DIFFERENT OPERATIONS ARE DONE
ARE:-
Drying of sand
Separation of sand in different size
Mixing of the Mold Mixture
Melting of cast iron
Collection of molten metal
Mold and riser making
Chipping of the waste material after removal of the casting
Stress relief provided to the casting
Estimation of Cost of Castings
The total cost of manufacturing a component consists of following elements :
 Material cost.
 Labour cost.
 Direct other expenses.
 Overhead expenses.
Material Cost
From the component drawing, calculate
the volume of material required for casting.
This volume multiplied by density of
material gives the net weight of the casting.
Add the weight of process scrap i.e.
weight of runners, gates and risers and other
material consumed as a part of process in
getting the casting.
Add the allowance for metal loss in
oxidation in furnace, in cutting the gates and
runners and over runs etc.
Multiply the total weight by cost per unit
weight of the material used.
Subtract the value of scarp return from the
amount obtained in previous step ,to get the
direct material cost.
Labour Cost
Labour is involved at various stages in a foundry shop.
Broadly it is divided into two categories :
The cost of labour involved in making the cores, baking of
cores and moulds is based on the time taken for making various
moulds and cores.
The cost of labour involved in firing the furnace, melting and
pouring of the metal.
Cleaning of castings, fettling, painting of castings etc., is
generally calculated on the basis of per kg of cast weight.
Direct Other Expenses
Direct expenses include the expenditure incurred on patterns, core
boxes, cost of using machines and other items which can be directly
identified with a particular product. The cost of patterns, core boxes
etc., is distributed on per item basis.
Overhead Expenses
The overheads consist of the salary and wages of supervisory staff,
pattern shop staff and inspection staff, administrative expenses, water
and electricity charges etc. The overheads are generally expressed as
percentage of labour charges.
The cost of a cast component is calculated by adding the above
constituents.
CUTTING
CNC Profile Cutting
Gas Cutting
BENDING
Bending Roller
PLANNING
Edge planner
WELDING
GMAW(Gas metal arc welding)
Submerged arc welding
Flux cored welding
Grinding
FABRICATION SHOP
MACHINE SHOP
In this shop the machines are conventional and are manual or semi
automated. Here the parts are machined in accordance with the requirement
of the job. In a separate part there are non conventional machines(CNC machines),
Which work faster than the conventional one and more efficient with more finish.
The different kind of operations done here are:-
Boring :- In this there are horizontal and vertical boring machines of different specifications
for example a HB upto spindle dia 210mm,VB upto height 3700mm and spindle dia 7000 mm,
etc.
Milling: - For milling the boring machine can be used by changing the tool form the tool
post.
Shaper: - Some shaper machines are installed upto stroke 600mm.
Planning:- Planomiller are used having ability to do planning and milling operations.
Turning :- Lathe range upto 3m dia and 11m long.
Slotting:- Slot machine are available upto 200mm.
Cutting:- Hacksaw/Bandsaw are installed.
Pressing:-Single action hydraulic press of upto 400 ton capacity.
Drilling:-It can be done on lathe machine or any other boring machine by placing drill bit.
PLANOMILLER
MILLING
LATHE MACHINE
DEEP BORING
SINGLE ACTION
HYDRAULIC PRESS
BENDING /PRESSING
LATHE MACHINE
TURNING
Physical testing
Universal testing machine
Brinell hardness tester
Charpy tester
Chemical testing
TESTING
Sand testing
Compressive and tensile test
Permeability test
NDT(Non destructive testing)
Radiography (X-ray)
Ultrasonic testing
Magnetic particle testing machine
Die penetrant test
Learned about the standards and its necessity. Also learned that the name
of a material denotes something about it for example material like
S335j0Cu641210 which tells that S means material is structure type and 335
gives its tensile strength J0 gives the detail that it is tested in 0’C and Cu
denotes cupper based and last denotes the standard followed by it.
Learned about the different gases used for different material for cutting like
for stainless steel nitrogen and air is used while for mild steel oxygen and LPG
is used.
Learned about the command for manual control over the path movement for
critical path or for interval based check by the command MDI(Manual data
input).
Lubrication is not used for cast iron and the reason behind it is the brittleness
and hardness of cast iron make the chip like dust which can choke the system if
mixed with lubrication forming a muddy mixture.
LEARNING
OUTCOMES
The BEEKAY ENGINEERING CORPORATION is a well know
industry manufacturing equipments of different industries.
The industry is utilizing its waste resources for the development of the
industry and taking care of the safety and environment.
Very high technology is introduced and is a industry for producing a
variety of products. The profit of an organization entirely depends on the
way the top chairs manage the resources the organization has. Whatever
the other aspects may be, it was seen that managing human resource was
extremely difficult. The stability or the sustainability of the organization
mostly depends on this factor.
In most cases it could be seen that there exists easier or better ways to do
something.
Adopting new methods provide efficient use of resources and can enhance
the effectiveness of the work.
CONCLUSION
Industrial training presentation (mechanical engineering)

More Related Content

What's hot

CNC REPORT BY 11115517
CNC REPORT BY 11115517CNC REPORT BY 11115517
CNC REPORT BY 11115517PANKAJ DHIR
 
internship report and design 5th year mechanical enginering
internship report and design 5th year mechanical engineringinternship report and design 5th year mechanical enginering
internship report and design 5th year mechanical engineringshushay hailu
 
Final Year Mechanical Project
Final Year Mechanical ProjectFinal Year Mechanical Project
Final Year Mechanical ProjectSanjeevSutar1
 
Sheet metal-operations
Sheet metal-operationsSheet metal-operations
Sheet metal-operationsPrasanna M N
 
CNC part programming
CNC part programmingCNC part programming
CNC part programmingjntuhcej
 
TRAINING REPORT ON CASTING
TRAINING REPORT ON CASTINGTRAINING REPORT ON CASTING
TRAINING REPORT ON CASTINGPawan Kumar
 
Summer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) StudentsSummer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) StudentsKashifRaza113
 
Internship presentation at Fabrimax Engg Pvt Ltd
Internship presentation at Fabrimax Engg Pvt LtdInternship presentation at Fabrimax Engg Pvt Ltd
Internship presentation at Fabrimax Engg Pvt Ltdabhishekgawande
 
Mercedes benz service centre training report
Mercedes benz service centre training reportMercedes benz service centre training report
Mercedes benz service centre training reportPanchal Anand
 
Welding Robots
Welding RobotsWelding Robots
Welding RobotsHarsha M
 
INTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORTINTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORTshone john
 
Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).Nitin Patil
 
Manual part programming
Manual part programmingManual part programming
Manual part programmingjntuhcej
 
jyoti cnc training report
jyoti cnc training reportjyoti cnc training report
jyoti cnc training reportvikas thakkar
 
ppt on industrial training at maruti suzuki workshop
ppt on industrial training at maruti suzuki workshopppt on industrial training at maruti suzuki workshop
ppt on industrial training at maruti suzuki workshopVivekGaur34
 

What's hot (20)

A Project Report on CNC Training
A Project Report on CNC TrainingA Project Report on CNC Training
A Project Report on CNC Training
 
CNC REPORT BY 11115517
CNC REPORT BY 11115517CNC REPORT BY 11115517
CNC REPORT BY 11115517
 
internship report and design 5th year mechanical enginering
internship report and design 5th year mechanical engineringinternship report and design 5th year mechanical enginering
internship report and design 5th year mechanical enginering
 
Final Year Mechanical Project
Final Year Mechanical ProjectFinal Year Mechanical Project
Final Year Mechanical Project
 
Sheet metal-operations
Sheet metal-operationsSheet metal-operations
Sheet metal-operations
 
CNC part programming
CNC part programmingCNC part programming
CNC part programming
 
TRAINING REPORT ON CASTING
TRAINING REPORT ON CASTINGTRAINING REPORT ON CASTING
TRAINING REPORT ON CASTING
 
Jigs and Fixture
Jigs and FixtureJigs and Fixture
Jigs and Fixture
 
Summer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) StudentsSummer Training Report for Diploma (mechanical) Students
Summer Training Report for Diploma (mechanical) Students
 
Internship presentation at Fabrimax Engg Pvt Ltd
Internship presentation at Fabrimax Engg Pvt LtdInternship presentation at Fabrimax Engg Pvt Ltd
Internship presentation at Fabrimax Engg Pvt Ltd
 
Mercedes benz service centre training report
Mercedes benz service centre training reportMercedes benz service centre training report
Mercedes benz service centre training report
 
Welding Robots
Welding RobotsWelding Robots
Welding Robots
 
INTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORTINTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORT
 
Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).
 
Welding Robots
Welding RobotsWelding Robots
Welding Robots
 
ppt on cnc
ppt on cncppt on cnc
ppt on cnc
 
Cnc machine report
Cnc machine reportCnc machine report
Cnc machine report
 
Manual part programming
Manual part programmingManual part programming
Manual part programming
 
jyoti cnc training report
jyoti cnc training reportjyoti cnc training report
jyoti cnc training report
 
ppt on industrial training at maruti suzuki workshop
ppt on industrial training at maruti suzuki workshopppt on industrial training at maruti suzuki workshop
ppt on industrial training at maruti suzuki workshop
 

Similar to Industrial training presentation (mechanical engineering)

IRJET- Productivity and Quality Improvement Through Setting Parameters in...
IRJET-  	  Productivity and Quality Improvement Through Setting Parameters in...IRJET-  	  Productivity and Quality Improvement Through Setting Parameters in...
IRJET- Productivity and Quality Improvement Through Setting Parameters in...IRJET Journal
 
Production cost Estimation
Production cost EstimationProduction cost Estimation
Production cost Estimationbaskaransece
 
Stainless Steel Castings, Steel Casting Manufacturer, Steel Casting Manufactu...
Stainless Steel Castings, Steel Casting Manufacturer, Steel Casting Manufactu...Stainless Steel Castings, Steel Casting Manufacturer, Steel Casting Manufactu...
Stainless Steel Castings, Steel Casting Manufacturer, Steel Casting Manufactu...Natarajan CV
 
VOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITED
VOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITEDVOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITED
VOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITEDSurendra Kumar Dewangan
 
Basic manufacturing process
Basic manufacturing processBasic manufacturing process
Basic manufacturing processVaibhav Pardeshi
 
Project study report c&b
Project  study report c&bProject  study report c&b
Project study report c&bParam Saxena
 
Spatter Reduction by Prateek Biswas
Spatter Reduction by Prateek BiswasSpatter Reduction by Prateek Biswas
Spatter Reduction by Prateek BiswasPrateek Biswas
 
Cape east Internship report
Cape east Internship reportCape east Internship report
Cape east Internship reportTushar Chopra
 
Pulse Electrical Current Assisted Sinter Rolling Mill
Pulse Electrical Current Assisted Sinter Rolling MillPulse Electrical Current Assisted Sinter Rolling Mill
Pulse Electrical Current Assisted Sinter Rolling MillWassim Shirry
 
Automobile pistonh
Automobile pistonhAutomobile pistonh
Automobile pistonhManoj Balla
 
Steelcast limited industrial training report
Steelcast limited industrial training reportSteelcast limited industrial training report
Steelcast limited industrial training reportaman1312
 
JIAHE SEIKO FORGING & CASTING FACTORY
JIAHE SEIKO FORGING & CASTING FACTORYJIAHE SEIKO FORGING & CASTING FACTORY
JIAHE SEIKO FORGING & CASTING FACTORYcharles L
 
Company profile.
Company profile.Company profile.
Company profile.Ankur Patel
 
Mechical car lift ( without power consumption)
Mechical car lift ( without power consumption)Mechical car lift ( without power consumption)
Mechical car lift ( without power consumption)Saifuddin Rakib
 

Similar to Industrial training presentation (mechanical engineering) (20)

IRJET- Productivity and Quality Improvement Through Setting Parameters in...
IRJET-  	  Productivity and Quality Improvement Through Setting Parameters in...IRJET-  	  Productivity and Quality Improvement Through Setting Parameters in...
IRJET- Productivity and Quality Improvement Through Setting Parameters in...
 
Production cost Estimation
Production cost EstimationProduction cost Estimation
Production cost Estimation
 
Stainless Steel Castings, Steel Casting Manufacturer, Steel Casting Manufactu...
Stainless Steel Castings, Steel Casting Manufacturer, Steel Casting Manufactu...Stainless Steel Castings, Steel Casting Manufacturer, Steel Casting Manufactu...
Stainless Steel Castings, Steel Casting Manufacturer, Steel Casting Manufactu...
 
VOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITED
VOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITEDVOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITED
VOCATIONAL TRAINING REPORT OF SIMPLE CASTING LIMITED
 
909090 final
909090 final909090 final
909090 final
 
Basic manufacturing process
Basic manufacturing processBasic manufacturing process
Basic manufacturing process
 
Project study report c&b
Project  study report c&bProject  study report c&b
Project study report c&b
 
Spatter Reduction by Prateek Biswas
Spatter Reduction by Prateek BiswasSpatter Reduction by Prateek Biswas
Spatter Reduction by Prateek Biswas
 
Cape east Internship report
Cape east Internship reportCape east Internship report
Cape east Internship report
 
Alumiunium casting
Alumiunium castingAlumiunium casting
Alumiunium casting
 
Pulse Electrical Current Assisted Sinter Rolling Mill
Pulse Electrical Current Assisted Sinter Rolling MillPulse Electrical Current Assisted Sinter Rolling Mill
Pulse Electrical Current Assisted Sinter Rolling Mill
 
Introduction to Manufacturing procecss
Introduction to Manufacturing procecssIntroduction to Manufacturing procecss
Introduction to Manufacturing procecss
 
Automobile pistonh
Automobile pistonhAutomobile pistonh
Automobile pistonh
 
Steelcast limited industrial training report
Steelcast limited industrial training reportSteelcast limited industrial training report
Steelcast limited industrial training report
 
JIAHE SEIKO FORGING & CASTING FACTORY
JIAHE SEIKO FORGING & CASTING FACTORYJIAHE SEIKO FORGING & CASTING FACTORY
JIAHE SEIKO FORGING & CASTING FACTORY
 
Company profile.
Company profile.Company profile.
Company profile.
 
TAYO PROJECT FINAL
TAYO PROJECT FINALTAYO PROJECT FINAL
TAYO PROJECT FINAL
 
Mechical car lift ( without power consumption)
Mechical car lift ( without power consumption)Mechical car lift ( without power consumption)
Mechical car lift ( without power consumption)
 
U1 p1 overview of manufacturing processes
U1 p1 overview of manufacturing processesU1 p1 overview of manufacturing processes
U1 p1 overview of manufacturing processes
 
training report
training report training report
training report
 

Recently uploaded

Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 

Recently uploaded (20)

Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 

Industrial training presentation (mechanical engineering)

  • 1. INDUSTRIAL TRAINING PRESENTATION By RAHUL BANERJEE (MECHANICAL ENGINEERING) BEEKAY ENGINEERING CORPORATION
  • 2. 1 CONTENTS INTRODUCTION History Manufacturing Infrastructure PRODUCTS MANUFACTURED DEPARTMENT/SHOPS AND THEIR PROCESSES CAST IRON FOUNDRY SHOP Estimation of Cost of Castings FABRICATION SHOP MACHINE SHOP TESTING LEARNING OUTCOMES CONCLUSION
  • 3. INTRODUCTION HISTORY Year of Established:1949 Managing Director (S. D. Shibulal) Established for Manufacture of equipment and spares for Bhilai Steel Plant It soon began catering to the requirements of other Steel plant at Rourkela, Durgapur & Bokaro. Beekay entered the field of turnkey projects in 1987 . Beekay has also successfully completed the construction of 600 m3 BF for Nacast, Notable achievements recently was supply of BF & HS shells for POSCO's 4000M3 BF project at SAIL ISP. Beekay is accredited with ISO 9001, ISO 14001, ISO 18001, API, ASME U Stamp and CCE approvals. Beekay is using cutting edge technology for the manufacturing of their products. They also have some technologies from different countries like China, Italy, etc
  • 5. PRODUCTS MANUFACTURED Iron Making Equipments Blast furnace SPONGE IRON PLANTS Dewatering drumHot metal car TYRE SHELL FOR 300 TPD Steel Making Equipments Steel making equipments Caster equipments RH Vacuum Degassing Vessel Twin Pot Slag Thimble Car Addle turret Segment for slab caster
  • 6. ROLLING MILL EQUIPMENTS Pinch Roll Merchant Mill Rolling mill COKE OVEN EQUIPMENTS Coke quenching car waste gas valve PRESSURE VESSELS Vapour collecting unit Nitrogen tank RAILWAYS 140 T Jib crane boom Engine floor frame
  • 7. An Industry comprises of different types of departments and shops for the proper working and completion of a job in a required time period with efficiency. The different departments can be classified as :- Marketing department. Finance department Planning department Machine shop Fabrication shop Foundry shop Assembly shop Testing department Other DEPARTMENT/SHOPS AND THEIR PROCESSES The product undergoes by sequential process are :- Enquiry done by the customer about the product to know about it and related queries. Quotation is made to show all the specification and expected cost for a particular product which is asked by the customer. It involves the extra cost like excise duty ,sales tax, e-tax, etc. A sample diagram is sent by the customer to the industry. Finance department estimate the basic cost of the materials and other resources used. Standards of the material are followed and if standards do not match an alternate standard is confirmed by the customer. Original manufacturing drawing is sent with actual specification of the size and shape. Planning department plan a efficient way to achieve the target of the product to be made. Manufacturing involving the different shops the product is formed. Product is tested by the NDT department. Delivery of the product is done.
  • 8. CAST IRON FOUNDRY SHOP TO PRODUCE THE METAL CASTING DIFFERENT OPERATIONS ARE DONE ARE:- Drying of sand Separation of sand in different size Mixing of the Mold Mixture Melting of cast iron Collection of molten metal Mold and riser making Chipping of the waste material after removal of the casting Stress relief provided to the casting
  • 9. Estimation of Cost of Castings The total cost of manufacturing a component consists of following elements :  Material cost.  Labour cost.  Direct other expenses.  Overhead expenses. Material Cost From the component drawing, calculate the volume of material required for casting. This volume multiplied by density of material gives the net weight of the casting. Add the weight of process scrap i.e. weight of runners, gates and risers and other material consumed as a part of process in getting the casting. Add the allowance for metal loss in oxidation in furnace, in cutting the gates and runners and over runs etc. Multiply the total weight by cost per unit weight of the material used. Subtract the value of scarp return from the amount obtained in previous step ,to get the direct material cost. Labour Cost Labour is involved at various stages in a foundry shop. Broadly it is divided into two categories : The cost of labour involved in making the cores, baking of cores and moulds is based on the time taken for making various moulds and cores. The cost of labour involved in firing the furnace, melting and pouring of the metal. Cleaning of castings, fettling, painting of castings etc., is generally calculated on the basis of per kg of cast weight. Direct Other Expenses Direct expenses include the expenditure incurred on patterns, core boxes, cost of using machines and other items which can be directly identified with a particular product. The cost of patterns, core boxes etc., is distributed on per item basis. Overhead Expenses The overheads consist of the salary and wages of supervisory staff, pattern shop staff and inspection staff, administrative expenses, water and electricity charges etc. The overheads are generally expressed as percentage of labour charges. The cost of a cast component is calculated by adding the above constituents.
  • 10. CUTTING CNC Profile Cutting Gas Cutting BENDING Bending Roller PLANNING Edge planner WELDING GMAW(Gas metal arc welding) Submerged arc welding Flux cored welding Grinding FABRICATION SHOP
  • 11. MACHINE SHOP In this shop the machines are conventional and are manual or semi automated. Here the parts are machined in accordance with the requirement of the job. In a separate part there are non conventional machines(CNC machines), Which work faster than the conventional one and more efficient with more finish. The different kind of operations done here are:- Boring :- In this there are horizontal and vertical boring machines of different specifications for example a HB upto spindle dia 210mm,VB upto height 3700mm and spindle dia 7000 mm, etc. Milling: - For milling the boring machine can be used by changing the tool form the tool post. Shaper: - Some shaper machines are installed upto stroke 600mm. Planning:- Planomiller are used having ability to do planning and milling operations. Turning :- Lathe range upto 3m dia and 11m long. Slotting:- Slot machine are available upto 200mm. Cutting:- Hacksaw/Bandsaw are installed. Pressing:-Single action hydraulic press of upto 400 ton capacity. Drilling:-It can be done on lathe machine or any other boring machine by placing drill bit.
  • 12. PLANOMILLER MILLING LATHE MACHINE DEEP BORING SINGLE ACTION HYDRAULIC PRESS BENDING /PRESSING LATHE MACHINE TURNING
  • 13. Physical testing Universal testing machine Brinell hardness tester Charpy tester Chemical testing TESTING Sand testing Compressive and tensile test Permeability test NDT(Non destructive testing) Radiography (X-ray) Ultrasonic testing Magnetic particle testing machine Die penetrant test
  • 14. Learned about the standards and its necessity. Also learned that the name of a material denotes something about it for example material like S335j0Cu641210 which tells that S means material is structure type and 335 gives its tensile strength J0 gives the detail that it is tested in 0’C and Cu denotes cupper based and last denotes the standard followed by it. Learned about the different gases used for different material for cutting like for stainless steel nitrogen and air is used while for mild steel oxygen and LPG is used. Learned about the command for manual control over the path movement for critical path or for interval based check by the command MDI(Manual data input). Lubrication is not used for cast iron and the reason behind it is the brittleness and hardness of cast iron make the chip like dust which can choke the system if mixed with lubrication forming a muddy mixture. LEARNING OUTCOMES
  • 15. The BEEKAY ENGINEERING CORPORATION is a well know industry manufacturing equipments of different industries. The industry is utilizing its waste resources for the development of the industry and taking care of the safety and environment. Very high technology is introduced and is a industry for producing a variety of products. The profit of an organization entirely depends on the way the top chairs manage the resources the organization has. Whatever the other aspects may be, it was seen that managing human resource was extremely difficult. The stability or the sustainability of the organization mostly depends on this factor. In most cases it could be seen that there exists easier or better ways to do something. Adopting new methods provide efficient use of resources and can enhance the effectiveness of the work. CONCLUSION