Established 1986
moladi is
A MECHANISM for the RAPID
delivery of QUALITY housing
EMPOWERING local
communities
…a contemporary
company that
...
Foundation-Raft Former
Foundation-Compact
Foundation-Compact
Foundation-Trench
Foundation-Trench
Foundation-Engineer Designed
Foundation-Professional-Indemnity
Foundation-Concrete
Foundation
Foundation-Power Float
moladi Formwork
moladi Formwork
moladi Formwork
Plumbing
Plumbing
moladi Formwork
moladi Formwork
Reinforcing
moladi Formwork
Reinforcing-Engineer Designed
moladi Formwork
moladi Truss Block Out
moladi-Mix Plant
River Sand-Cement-Water-moladiCHEM
moladi-Flow
moladi-Cast In-situ
moladi Formwork
Truss Block-Out
Truss Block-Out
Superstructure
Superstructure
Roof
Ceiling
Complete
Wall Properties
75 m²
80 m²
1987
110 m²
Bonded by Standard Bank since 1993
120 m²
Classrooms
Clinics
Ablution Block
Block vs moladi
Our block is BIGGER
Construction Cycle
– Erratic supplies = erratic delivery
– Dependant on skilled labour
– Waste
– Rework
– Slow delivery
– ...
moladi Cycle
– Constant supply = constant delivery
– Known cost
– Unskilled operators
– Next to no waste
– Increased produ...
Key Benefits
• NHBRC – Rational Design
• Agrément Certified (CSIR)
• SABS tested and approved
• Engineer Certified *
– Fou...
Key Benefits
• Train and employ local unskilled labour
• Utilize local materials
• Re-useable
• Reduced transport cost
• L...
Key Benefits
• Speed without compromising quality
• No need to plaster
• No need to chase
• No beam filling
• Waterproof
•...
Fundamental Criteria
• Social acceptance
• Durability
• Quality
• Variety
• Increase in value
• Re-sale ability
• Minimise...
SABS Test
Waterproof
• Test method is for the worst case
scenario i.e. Cape Town 1,000-mm
rainfall per annum with a wind s...
SABS Test
Soft Body Impact
• A 30 kg bag swings to impact the wall 900 mm
above the floor height to access the
serviceabil...
SABS Test
Chisel Impact
• After two impact of the chisel from a
height of 375 mm above the floor
height a slight indentati...
SABS Test
• All test conducted by the South African Bureau of
Standards, have been executed on a 100 mm (4
inch) wall as t...
Thermal
Conductivity/Resistance
Construcción de viviendas económicas
Upcoming SlideShare
Loading in …5
×

Construcción de viviendas económicas

1,008 views

Published on

Construcción de viviendas económicas - Construção da casa econômica - Economical house construction

Published in: Design, Business
  • Be the first to comment

  • Be the first to like this

Construcción de viviendas económicas

  1. 1. Established 1986
  2. 2. moladi is A MECHANISM for the RAPID delivery of QUALITY housing EMPOWERING local communities …a contemporary company that harnesses and implements contemporary solutions
  3. 3. Foundation-Raft Former
  4. 4. Foundation-Compact
  5. 5. Foundation-Compact
  6. 6. Foundation-Trench
  7. 7. Foundation-Trench
  8. 8. Foundation-Engineer Designed
  9. 9. Foundation-Professional-Indemnity
  10. 10. Foundation-Concrete
  11. 11. Foundation
  12. 12. Foundation-Power Float
  13. 13. moladi Formwork
  14. 14. moladi Formwork
  15. 15. moladi Formwork
  16. 16. Plumbing
  17. 17. Plumbing
  18. 18. moladi Formwork
  19. 19. moladi Formwork
  20. 20. Reinforcing
  21. 21. moladi Formwork
  22. 22. Reinforcing-Engineer Designed
  23. 23. moladi Formwork
  24. 24. moladi Truss Block Out
  25. 25. moladi-Mix Plant River Sand-Cement-Water-moladiCHEM
  26. 26. moladi-Flow
  27. 27. moladi-Cast In-situ
  28. 28. moladi Formwork
  29. 29. Truss Block-Out
  30. 30. Truss Block-Out
  31. 31. Superstructure
  32. 32. Superstructure
  33. 33. Roof
  34. 34. Ceiling
  35. 35. Complete
  36. 36. Wall Properties
  37. 37. 75 m²
  38. 38. 80 m² 1987
  39. 39. 110 m² Bonded by Standard Bank since 1993
  40. 40. 120 m²
  41. 41. Classrooms
  42. 42. Clinics
  43. 43. Ablution Block
  44. 44. Block vs moladi Our block is BIGGER
  45. 45. Construction Cycle – Erratic supplies = erratic delivery – Dependant on skilled labour – Waste – Rework – Slow delivery – Inconsistent quality – Unpredictable cash flow – Increased cost
  46. 46. moladi Cycle – Constant supply = constant delivery – Known cost – Unskilled operators – Next to no waste – Increased productivity – Reduced cost – Consistent quality – Predictable cash flow
  47. 47. Key Benefits • NHBRC – Rational Design • Agrément Certified (CSIR) • SABS tested and approved • Engineer Certified * – Foundation – Super Structure – Roof • Superior wall strength • Quality Controls • Community acceptance NBR SABS - 0400 ...QUALITY * Professional Indemnity
  48. 48. Key Benefits • Train and employ local unskilled labour • Utilize local materials • Re-useable • Reduced transport cost • Low construction cost • Rapid construction time • Practicable designs • Quality approved materials • Variety of finishing details • Low maintenance cost ...SAVINGS
  49. 49. Key Benefits • Speed without compromising quality • No need to plaster • No need to chase • No beam filling • Waterproof • Reinforced • Waste reduction • Logistics • Alterations and additions ...SAVINGS
  50. 50. Fundamental Criteria • Social acceptance • Durability • Quality • Variety • Increase in value • Re-sale ability • Minimise risk - Insurance/Professional Indemnity • Certified • Bondable/Financed
  51. 51. SABS Test Waterproof • Test method is for the worst case scenario i.e. Cape Town 1,000-mm rainfall per annum with a wind speed of 30 metre/second conducted over a 24- hour period.
  52. 52. SABS Test Soft Body Impact • A 30 kg bag swings to impact the wall 900 mm above the floor height to access the serviceability criteria • 1800 mm above the floor height to access the safety criteria. • Two impacts of the bag where executed on the exterior wall surface for each of the above criteria and the wall was inspected after each impact for any sign of cracks, damage or collapse – none.
  53. 53. SABS Test Chisel Impact • After two impact of the chisel from a height of 375 mm above the floor height a slight indentation was visible. The depth of the indentation was less than 3 mm.
  54. 54. SABS Test • All test conducted by the South African Bureau of Standards, have been executed on a 100 mm (4 inch) wall as this is an acceptable norm for in situ walls and is also the standard applied to low cost housing units. • Thermal conductivity of 100 mm moladi wall = 0,54 W/m.K
  55. 55. Thermal Conductivity/Resistance

×