Lta Kpe Infographic

2,181 views

Published on

Some samples based on a published infographic. Here is a reconstruction of those graphics done entirely in the 2003 version of PowerPoint.

Visit the newly updated version of the blog at http://presentationslides.blogspot.com

Published in: Design, Technology
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
2,181
On SlideShare
0
From Embeds
0
Number of Embeds
9
Actions
Shares
0
Downloads
0
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Lta Kpe Infographic

  1. 1. Infographic / LTA Case Study 2003 version of PowerPoint recreation of http://www.lta.gov.sg/KPE/index.htm
  2. 2. > What is this? View the current 2003 version of the samples.
  3. 3. Construction Site Proposed Underground Structure Diverted Road Hoarding Construction Methods / Project Sites Parallel View (Isometric)
  4. 4. Construction Site Proposed Underground Structure Diverted Road Hoarding Construction Methods / Project Sites Perspective View (Isometric)
  5. 5. 2007 Version of PowerPoint
  6. 6. 01. Construction of Guide Wall -1200mm -800 to 1000mm Guide Wall A Guide Wall is constructed to set out the position of the diaphragm wall. Parallel View (Isometric)
  7. 7. 01. Construction of Guide Wall -1200mm -800 to 1000mm Guide Wall A Guide Wall is constructed to set out the position of the diaphragm wall. Perspective View (Isometric)

×