Advertisement

More Related Content

Advertisement

hongkong case studyy ppt.pptx

  1. Case studies 03 Hong Kong Neighborhood recycling center -Administration - Training and consultation
  2. Hong Kong Questions to ponder Problems Results Hongkong’s drowning in waste and its 3 landfills are almost full . What if: The government created waste recovery facilities in every neighborhood instead of collection facilities only What if: a significant portion of waste produced in the neighborhood never left the neighborhood Cutting down on waste transportation finances. What if: Recycling became a fun group activity instead of a mundane individual task The waste producers would also be the recycles: resulting in a balanced self sustainable city. We’ll get closer to living a zero waste life.
  3. Hong Kong Neighborhood Recycling Center A prototype to minimize the export of waste to our landfills Basement Level 1 (ground) Level 2 Level 3 Level 4 Level 5 Level 6 Locate facility close to metro stations and other public transport for ease of access Outdoor gathering and eating spaces to encourage visitation Green building envelope Minimize building’s width to allow implementation in different sites Provide PV collectors,microturbines to maximize on site power generation and harvest rainwater for irrigation Provide rooftop gardens to develop an urban farming culture
  4. Level 0 (basement) On Site composting center Food waste transported from level 1 via conveyor belts and fed into composting machines Wastewater treatment facility Onsite wastewater treatment -using RO system -water storage tanks Primary and secondary systems Lifts pits Mechanical plant Food waste disinfection area
  5. Level 1 (Ground) Recycling Center Water refill station Green product retail Public building access Green product retail Hazardous material temporary storage Incoming material sorting Food Recovery Area
  6. Level 2 Food waste recovery center Cooking School Neighborhood market Public covered terrace Public open air sitting out area
  7. Level 3 Flea Market Electronic and furniture workshops Public access to this level provided
  8. Level 4 Upcycling center Artists Studios Retail Gallery Public access to this level provided by lifts and escalators Select recycled materials transported to this level via freight lifts
  9. Level 5 Community Hall Storage access Exhibit entry for large objects Public access to this level provided by lifts and escalators
  10. Level 6 (Roof ) Community Organic Gardens Gardens Center Microturbines along perimeter for rooftop parapet Community Organic Gardens Public access to this level provided by lifts and escalators PV solar panels at roof area Recycled houseplants and on-site compost
Advertisement