1. 49
REFERENCES BIBLIOGRAPHIE
[Blake et Carter, 1997a] Blake J.T., et Carter M.W.: Surgical process scheduling: a
structured review, Journal of Health systems (I.I.E), 5(3), 17-30, 1997.
[Blake et Carter, 1997b] Blake J.T., et Carter M.W.: Surgical process management: a
conceptual framework, Surgical Services Management, 3(9), 31-37, 1997.
[Breslawki, 1994] Hamilton DM, Breslawski S.: Operating room scheduling. Factors to
consider, Association of Operating Room Nurse (AORN) Journal, 59(3), 665-680, 1994.
[Breit et al., 2001] Breit J., Schmidt G., Strusevich V.A.: Two-machine open shop
scheduling with an availability constraint, Operations Research Letters, 29, 65-77, 2001.
[Chaabane, 2004] Chaabane S.: Gestion prédictive des blocs opératoires, Thèse,L’institut
National des Sciences Appliquées de Lyon, 172p, 2004.
[Cuviller, 1997a] Cuviller P.: Bases d’organisation fonctionnelle d’un bloc opératoire : la
charte opératoire, Objectifs Soins, 57: IV-XVI, 1997
[Cuviller, 1997b] Cuviller P.: Bloc opératoire : procédures, formation et démarche qualité.
Objectifs Soins, 57: I-XI, 1997.
[Duvivier, 2000] Duvivier D.: Etude de l’hybridation des méta-heuristiques, application à
un problème d’ordonnancement de type jobshop, thèse, Université du Littoral Côte d’Opale,
289p, 2000
[FEI 06] : FEI H. « Vers un outil d’aide à la planification et à l’ordonnancement des blocs
opératoires » thèse de doctorat, Facultés universitaires catholiques de Mons et Université de
technologie de Troyes, France 17-03- 2006.
[HAM 94]: HAMILTON D.M, BRESLAWSJKI S. « Operating rooms scheduling.
Factors to consider » Association of Operating Room Nurse (AORN) 1994.
[Giard, 2003] Giard V. : Gestion de la production et des flux, 3ème édition, Collection
Gestion, Série : Production et techniques quantitatives appliquées à la gestion, Economica,
1229p, 2003
[Grant, 1995] Kontak-Forsyth M., Grant A.E.: OR booking policy: development and
implementation, Canadian Nursing Journal, 13(1), 1995.
[Kharraja et al., 2002] Kharraja S., Chaabane S., Marcon E. : Evaluation de performances
pour deux stratégies de programmation opératoire de bloc, Proceeding de la 2ème conférence
Internationale Francophone d’Automatique, France, 2004.
[Kharraja, 2003] Kharraja S. : Outils d’aide à la planification et l’ordonnancement des
plateaux-médico-techniques, Génie Industriel, Saint-Etienne : Université Jean-Monnet, 153P,
2003.
2. 50
[Kharraja et al., 2002] Kharraja S., Chaabane S., Marcon E. : Evaluation de performances
pour deux stratégies de programmation opératoire de bloc, Proceeding de la 2ème conférence
Internationale Francophone d’Automatique, France, 2004.
[Kharraja et Marcon, 2003] Kharraja S., Marcon E. : Vers une construction automatique du
plan directeur d’allocation des plages horaires, Conférence francophone sur la Gestion et
Ingénierie des Systèmes Hospitaliers GISEH’03, 54-6 1, France, 2003.
[Kennedy, 1992] Kennedy M.: Bin-packing, knapsack and chance constrained application to
scheduling operating rooms, Thèse, Resselaer Polytechnic Institute, Troy, NY., 1992..
[Jebali, 2004] Jebali A.: Vers un outil d’aide à la planification et l’ordonnancement des
ressources dans les services de soins. Thèse, Institut National Polytechnique de Grenoble,
216p, 2004.
[Magerlein et Martin, 1978] Magerlein J., et Martin J. : Surgical demand scheduling : a
review , Health Services Research, 31(4), 418-433, 1978, 1978
[Malhorta 2001] Malhorta V.: Nuts and bolts of OR management, 52th Annual Refresher
cours lectures, Clinical updates and basic science reviews, during the Annual Meeting of the
American Society of Anesthesiologists, 13-17, 2001
[Marcon et al., 2003] Marcon E., Kharraja S., Simonnet G.: The Operating theatre
scheduling: an approach centered on the follow-up of the risk of no realization of the
planning, Special issue of International Journal of Production Economics (IJPE), ed.
ELSEVIER, 85(1), 83-90, 2003.
[Marcon et al., 2001a] Marcon E., Kharraja S., Simonnet G.: The operating theatre
scheduling : an approach centred on the follow-up of the risk of no realization of the planning,
Proceeding of the Industrial Engineering and Production Management, Canada, 18-21, 2001.
[Marcon et al., 2001b] Marcon E., Kharraja S., Simonnet G. : Minimization of the risk of
no realization for the planning of the surgical interventions into the operating theatre,
proceeding of 8th IEEE International Conference on Emerging Technologies and Factory
Automation, France, 675-680, 2001.
[OSM 96]: OSMAN I.H., LAPORTE «Métaheuristics» Annals of operations research 63,
513, 623, 1996.
[Patterson, 1996] Patterson P.: What makes a well-oiled scheduling system, Journal of
OR Manager, 12(9), 19-23, 1996.
[Patterson], P. (1996). What makes a well-oiled scheduling system, Journal of OR Manager,
12(9), 19-23
[Przasnyski, 1986] Przasnyski Z.H.: Operating room scheduling: a literature review,
Association of Operating Room Nurse (AORN) Journal, 44, 67-76, 1986.
.
3. 51
[Revel et al., 2003] Revel M., Nicolas G., Bara C., Moreau M.O, Nicolle D., Duret M.:
Synthèse des travaux du groupe sur l’implantation et l’organisation des plateaux technique,
Ministère de la santé, de la famille, et des personnes handicapées, 35p, 2003
LES LIENS :
[Lien 1] :http://fr.wikipedia.org/wiki/MySQL, visite le 30-03-2014.
[Lien 2] :http://fr.wikipedia.org/wiki/Diagramme_de_classes, visite le 30-03-2014.
[Lien 3] :http://fr.wikipedia.org/wiki/Netbeans, visite le 30-03-2014.
[Lien 4] :http://fr.wikipedia.org/wiki/Unified_Modeling_Language, visite le 30-03-2014.
[Lien 5] :http://fr.wikipedia.org/wiki/Base_de_donnees, visite le 30-03-2014.
[Lien 6] :http://fr.wikipedia.org/wiki/Wampserver, visite le 30-03-2014.
[Lien 7] :http://fr.wikipedia.org/wiki/Ordonnancement_d%27atelier, visite le 30-03-2014.