STEP, Industrial Construction

676 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
676
On SlideShare
0
From Embeds
0
Number of Embeds
11
Actions
Shares
0
Downloads
7
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

STEP, Industrial Construction

  1. 1.
  2. 2. Our directions<br />Agro-industrial<br />construction<br />Mining<br />construction<br />Industrial<br />construction<br />Reconstruction<br />And fit-out<br />Commercial<br />construction<br />
  3. 3. Mission and Philosophy<br />Our mission is<br />Managing construction projects in an optimal way for investors<br />BUDGET<br />Complete budget information already in our commercial offer<br />We are able and ready to work in projects with harsh time limits<br />TIME<br />Confirmed by references from our clients and certified by ISO 9001<br />QUALITY<br />We act as general contractor on design and construction, technical customer, construction manager, developer, and consulting company<br />SERVICE<br />EFFICIENCY<br />We are not restricted by the limits of our own technical base<br />
  4. 4. Facts about the company<br />Managing<br />constructionprojects<br />since 1993<br />Completed:<br />More than 100 projects<br />Total area of objects:<br />More than 1 000 000 sq. m<br />Offices in<br />Saint Petersburg, <br />Moscow,<br />Novgorod<br />Geography of projects:<br />11regions of Russia<br />Certificates:<br />ISO 9001<br />SRO membership<br />Number of employees:<br />More than 200<br />
  5. 5. Facts about the company<br />Company turnover, bln. rub.<br />
  6. 6. Our services<br />Development<br />General contract on design<br />Technical customer functions<br />General contract on construction<br />Launching the object<br />Performing guarantee maintenance<br />
  7. 7. Geography of customers<br />Australia<br />Austria<br />Canada<br />China<br />Denmark<br />Finland<br />France<br />Germany<br />Israel<br />Italy<br />Japan<br />Lichtenstein<br />Netherlands<br />Norway<br />Russia<br />South Korea<br />Spain<br />Sweden<br />Turkey<br />United Kingdom<br />United States<br />
  8. 8. Geography of Projects<br />St. Petersburg<br />Moscow<br />Leningrad Region<br />Moscow Region<br />Nizhni Novgorod Region<br />Novgorod Region<br />Penza Region<br />Saratov Region<br />Tyumen Region<br />Vologda Region<br />
  9. 9. Our customers<br />
  10. 10. Company structure<br />
  11. 11. Organizational project chart<br />
  12. 12. Industrial construction<br />
  13. 13. Industrial construction<br />“There are no typical projects in industrial construction. Our goal is to understand the essence of a manufacturing process and to suggest the best constructive solution”.<br />Mikhail Gribov,<br />Department director. Managing partner.<br />We have completed dozens of industrial projects of various complexity since 1998. <br />Our company accumulated unique experience of conducting projects in machinery construction, chemical production, metallurgy, light, food, electronic and other industries. <br />
  14. 14. Industrial construction<br />
  15. 15. Completed projects<br />Stamped details factory<br />General contract on design and construction<br />STADCO<br />16 000 m2<br />801 mln. rub.<br />STADCO<br />Customer:<br />Address:<br />Vsevolozhsk<br />Area:<br />Contract amount:<br />Duration:<br />10 months<br />
  16. 16. Completed projects<br />Air separation plant<br />General contract on construction<br />Air LiquideSeverstal<br />26 000 m2<br />594 mln. rub.<br />Air Liquide<br />Customer:<br />Address:<br />Cherepovets<br />Area:<br />Contract amount:<br />Duration:<br />12 months<br />
  17. 17. Completed projects<br />Packaging products plant<br />General contract on construction<br />Amcor Rentsch<br />7 000 m2<br />$ 7,5 mln.<br />Amcor Rentsch<br />Customer:<br />Address:<br />Novgorod<br />Area:<br />Contract amount:<br />Duration:<br />48 months<br />
  18. 18. Completed projects<br />Flexibles packaging materials factory<br />General contract on design and construction<br />Amcor Flexibles Novgorod<br />8 500 m2<br />5,9 mln. euro<br />Amcor Flexibles Novgorod<br />Customer:<br />Address:<br />Novgorod<br />Area:<br />Contract amount:<br />Duration:<br />12 months<br />
  19. 19. Completed projects<br />Cardboard package factory<br />General contract on design and construction<br />Alcan Packaging<br />13 500 m2<br />10 mln. euro<br />Alcan<br />Customer:<br />Address:<br />Krasnoeselo,<br />Saint Petersburg<br />Area:<br />Contract amount:<br />Duration:<br />17months<br />
  20. 20. Completed projects<br />Aluminum can factory<br />General contract on design and construction<br />ROSTAR<br />23 500 m2<br />$ 12 mln.<br />ROSTAR<br />Customer:<br />Address:<br />Vsevolozhsk<br />Area:<br />Contract amount:<br />Duration:<br />15 months<br />
  21. 21. Completed projects<br />21<br />Nonflammable thermal protection<br />General contract on construction<br />ROCKWOOL<br />1500 m2<br />132 mln. rub.<br />ROCKWOOL<br />Customer:<br />Address:<br />Vyborg<br />Area:<br />Contract amount:<br />Duration:<br />9 months<br />
  22. 22. Completed projects<br />Dry building materials factory<br />General contract on design and construction<br />KREPS<br />9 000 m2<br />$ 1,8 mln.<br />KREPS<br />Customer:<br />Address:<br />Saint Petersburg<br />Area:<br />Contract amount:<br />Duration:<br />13 months<br />
  23. 23. Completed projects<br />Confectionery factory<br />General contract on construction<br />Customer:<br />JoyCo<br />Address:<br />Novgorod<br />Area:<br />3 000 m2<br />Contract amount:<br />$ 1,2 mln.<br />JoyCo<br />
  24. 24. Completed projects<br />Barmy factory<br />General contract on construction<br />Customer:<br />Lesaffre<br />Address:<br />Saint Petersburg<br />Area:<br />5 000 m2<br />Contract amount:<br />$ 1,9 mln.<br />Lesaffre<br />
  25. 25. Completed projects<br />Meat processing complex<br />General contract on design and construction<br />Customer:<br />Rubej Plus Region<br />Address:<br />Saint Petersburg<br />Area:<br />3 500 m2<br />Contract amount:<br />$ 1,5 mln.<br />Rubej Plus Region<br />
  26. 26. Completed projects<br />Flavor enhancers warehouse<br />General contract on construction<br />Wrigley<br />Wrigley<br />Customer:<br />Address:<br />Saint Petersburg<br />Duration:<br />6months<br />
  27. 27. Completed projects<br />Electric product factory<br />General contract on design and construction<br />Customer:<br />LexelElectromaterials(SPb)<br />Address:<br />Kommunar<br />Area:<br />28 000 m2<br />Contract amount:<br />202 mln. rub.<br />Schneider Electric<br />
  28. 28. Completed projects<br />Consists of 7 plants & other facilities<br />General contract on construction<br />Customer:<br />Hyundai AMCO<br />Address:<br />Kamenka,<br />Saint-Petersburg<br />Area:<br />45 000 m2<br />Contract amount:<br />2,2 bln. rub.<br />Hyundai<br />
  29. 29. Completed projects<br />Production-warehouse complex<br />General contract on construction<br />Michelin<br />3 850 m2<br />Michelin<br />Customer:<br />Address:<br />Moscow Region, Orekhovo-Zuevsky District<br />Area:<br />Duration:<br />8months<br />
  30. 30. References<br />«We feel professionalism and understanding of customer’s needs in the work of company specialists. We recommend Step as the company with a high level of responsibility in what they do...»<br />«BTK Development», (Russia)<br />«…We are ready to recommend Step as a highly professional and responsible general contractor…»<br />«OBI», (Russia)<br />«We can point out competent management of the object construction, good organization of works, and precise coordination of subcontractors…»<br />«STADCO», St. Petersburg<br />
  31. 31. Our partners<br /><ul><li>GSE Group (France).European leader in construction of logistic, industrial, and commercial facilities.
  32. 32. SchongauerInvestburo (SIB).Company specializes in development, redevelopment, and support of investments in real estate projects.
  33. 33. PiterGORproekt.The leading company in designing and construction of mining plants in Russia and CIS countries. </li></li></ul><li>Cooperation experience<br />
  34. 34. Shareholders comments<br />Dmitry Kunis, President:<br />«Construction management is an intellectual service. And I’m glad that we’ve built the company that gives priority to intellect».<br />Yuri Ioffe, Vice-President:<br />«Constructor is the most conservative profession. However our ability to think in a modern way, to accept new things and to be open makes Step a really innovative company».<br />
  35. 35. Saint Petersburg<br />Business center Benua, office 629<br />44, Sverdlovskayaemb.<br />tel.: +7 (812) 677-0077<br />Moscow<br />Business center Stanislavsky Factory<br />21, Bld. 1, Stanislavskogo str.<br />tel.: +7 (495) 981-6636<br />www.stepcon.ru<br />Our contacts:<br />

×