Presentation1

685 views

Published on

Published in: Education, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
685
On SlideShare
0
From Embeds
0
Number of Embeds
15
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Presentation1

  1. 1. STaR Chart Tomball ISD – Canyon Pointe Elementary
  2. 2. Texas STaR Chart Information S tudent T echnology a nd R eadiness <ul><li>The Teacher STaR chart is designed as a resource for improving education and success for schools, teachers, and students through the use of technology. </li></ul><ul><li>There are basically two types of STaR charts that schools, teachers, students and stakeholders can utilize to promote performance and achievement. </li></ul><ul><ul><li>Texas Teacher STaR Chart </li></ul></ul><ul><ul><li>Texas Campus STaR Chart </li></ul></ul>
  3. 3. STaR Chart Tomball ISD – Canyon Pointe <ul><li>Our campus is going to use the Texas STaR Chart to evaluate our campus’s technological resources and tools. </li></ul><ul><li>Through this process four key areas will be evaluated: </li></ul><ul><ul><li>Teaching and Learning </li></ul></ul><ul><ul><li>Educator Preparation and Development </li></ul></ul><ul><ul><li>Leadership, Administration, and Instructional Support </li></ul></ul><ul><ul><li>Infrastructure for Technology </li></ul></ul><ul><li>Each of these four key areas are compared to statewide data and each campus is classified accordingly: </li></ul><ul><ul><li>Early Tech </li></ul></ul><ul><ul><li>Developing Tech </li></ul></ul><ul><ul><li>Advanced Tech </li></ul></ul><ul><ul><li>Target Tech </li></ul></ul>
  4. 4. STaR Chart Tomball ISD – Canyon Pointe Key Area: Teaching and Learning
  5. 5. STaR Chart Tomball ISD – Canyon Pointe <ul><li>Key Area STaR Classification: Teaching and Learning </li></ul><ul><li>2008 – 2009: Developing Tech (14) </li></ul><ul><li>2009 – 2010: Advanced Tech (15) </li></ul><ul><li>2010 – 2011: Advanced Tech (18) </li></ul>
  6. 6. STaR Chart Tomball ISD – Canyon Pointe Key Area: Educator Preparation and Development
  7. 7. STaR Chart Tomball ISD – Canyon Pointe <ul><li>Key Area STaR Classification: Educator Preparation and Development </li></ul><ul><li>2008 – 2009: Advanced Tech (15) </li></ul><ul><li>2009 – 2010: Advanced Tech (15) </li></ul><ul><li>2010 – 2011: Advanced Tech (15) </li></ul><ul><li>This area is an area of weakness for our campus. Although this currently a weakness for our campus it is an area that I believe we can improve through professional development and education. </li></ul>
  8. 8. STaR Chart Tomball ISD – Canyon Pointe Key Area: Leadership, Administration, Instructional Support
  9. 9. STaR Chart Tomball ISD – Canyon Pointe <ul><li>Key Area STaR Classification: Leadership, Administration, Instructional Support </li></ul><ul><li>2008 – 2009: Advanced Tech (18) </li></ul><ul><li>2009 – 2010: Advanced Tech (18) </li></ul><ul><li>2010 – 2011: Advanced Tech (18) </li></ul><ul><li>This is an area that we have continue to show strength. </li></ul>
  10. 10. STaR Chart Tomball ISD – Canyon Pointe Key Area: Infrastructure for Technology
  11. 11. STaR Chart Tomball ISD – Canyon Pointe <ul><li>Key Area STaR Classification: Infrastructure for Technology </li></ul><ul><li>2008 – 2009: Developing Tech (13) </li></ul><ul><li>2009 – 2010: Advanced Tech (19) </li></ul><ul><li>2010 – 2011: Advanced Tech (17) </li></ul><ul><li>Currently our campus is classified as Advanced Tech but we have shown a decrease from the 2009-2010 school year, it is important that we continuously strive to maintain this current rating and try to improve our classification in this area. </li></ul>
  12. 12. STaR Chart Tomball ISD – Canyon Pointe <ul><li>From this data we as a campus hope to better understand our technological resources and ways to utilize these resources. </li></ul><ul><li>The Key Area and Classifications should provide valuable information that we could use to best understand campus strengths and weakness, as well as strategies for progress. </li></ul><ul><li>The information provided from this presentation should introduce the STaR Chart components and show where we as a campus stand compared to the statewide data. </li></ul>
  13. 13. STaR Chart Tomball ISD – Canyon Pointe <ul><li>For more information the following resources are available: </li></ul><ul><ul><li>http://starchart.esc12.net/ </li></ul></ul><ul><li>Campus Information: </li></ul><ul><li>2008 – 2009 </li></ul><ul><li>2009 – 2010 </li></ul><ul><li>2010 – 2011 </li></ul><ul><li>http://starchart2.esc12.net/campusreport.aspx?id=e116501f-2b1b-4f6b-ad8e-39770880bc92&foryear=20082009 </li></ul>

×