EGK 2011: Construction 03 IRDS

855 views

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
855
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

EGK 2011: Construction 03 IRDS

  1. 1. <ul><li>Prepared by: </li></ul><ul><li>Michael Asfaw </li></ul><ul><li>(MSc, BSc, MAPM, MBCS) </li></ul>
  2. 2. IRDS <ul><li>is established with experts, and a company in Germany; </li></ul><ul><li>is a progressive and multi-disciplinary Engineering and Consultancy Office with vested interest in development projects in the Region. </li></ul>
  3. 3. Our Services <ul><li>Planning – economic and environmental feasibility studies </li></ul><ul><li>Design and Supervision – real estates, transport, terminals, water treatment, bridges, tunnels ... </li></ul><ul><li>Consultancy and Capacity Building. </li></ul>
  4. 4. Pre-Designing Designing / Supervision
  5. 5. H End-to-end Solution <ul><li>Feasibility Design </li></ul><ul><li>Architectural Design </li></ul><ul><li>Surveying </li></ul><ul><li>Soil Investigation </li></ul><ul><li>Sanitary Design </li></ul><ul><li>Electrical Design </li></ul><ul><li>Structural Design </li></ul><ul><li>Mechanical Design </li></ul><ul><li>Contract Administration </li></ul><ul><li>Quality Management </li></ul>Housing and Real Estate
  6. 6. C Construction Site Management <ul><li>Definition of planning goals </li></ul><ul><li>Organization and staffing </li></ul><ul><li>Coordination of programs and participants </li></ul><ul><li>Controls of deliverables </li></ul><ul><li>Construction supervision </li></ul><ul><li>Technical supervision </li></ul><ul><li>Documentation </li></ul>Construction
  7. 7. T Transport Planning and Optimisation <ul><li>State Transport Planning. </li></ul><ul><li>State and Regional Transport Studies </li></ul><ul><li>Light-Speed Rail and Passenger Rail. </li></ul><ul><li>Freight Rail Capacity and Planning. </li></ul><ul><li>National Rail Policy and Planning. </li></ul><ul><li>Rail and Environmental Planning </li></ul>Transport
  8. 8. R Road Planning <ul><li>Turnpikes </li></ul><ul><li>Express ways </li></ul><ul><li>Municipal roads </li></ul><ul><li>City by-pass </li></ul><ul><li>Bicycle paths </li></ul>Road Infrastructure
  9. 9. R Railroad Stations <ul><li>Transfer connection bus/ railroad/cars/pedestrians </li></ul><ul><li>Volume of traffic </li></ul><ul><li>Allocation of station platforms </li></ul><ul><li>Traffic junctions </li></ul><ul><li>Availability of railroad stations </li></ul><ul><li>Freight traffic </li></ul><ul><li>Combined freight load from roads to rail tracks </li></ul><ul><li>Freight terminals </li></ul>Railroad
  10. 10. R Quality Management <ul><li>National laws </li></ul><ul><li>European/Regional laws </li></ul><ul><li>Special railroad regulations: </li></ul><ul><li>Ground constructions </li></ul><ul><li>Track construction </li></ul><ul><li>Construction design </li></ul><ul><li>Drainage </li></ul><ul><li>Outfitting </li></ul><ul><li>Railroad stations </li></ul>Railroad
  11. 11. T Designing <ul><li>Terminal Planning </li></ul><ul><li>Program Management </li></ul><ul><li>Marine Structures </li></ul><ul><li>Terminal Security </li></ul><ul><li>Terminal Automation </li></ul><ul><li>Ferry Terminals </li></ul><ul><li>Bulk Terminals </li></ul><ul><li>Gate Planning & Design </li></ul><ul><li>Terminal Simulation </li></ul><ul><li>Traffic Studies </li></ul>Terminal
  12. 12. W Water Treatment Plants <ul><li>Sewage treatment is the basis for water purification and the protection of our water resources. </li></ul><ul><li>Reports and studies </li></ul><ul><li>Economic analysis </li></ul><ul><li>Master planning of waste water collection and treatment systems </li></ul><ul><li>Evaluations and hydraulic systems modelling </li></ul><ul><li>Sewage treatment plants </li></ul>
  13. 13. <ul><li>General Steel Bridges </li></ul><ul><li>Cable Bridges </li></ul><ul><li>Modular Bridges </li></ul><ul><li>Movable Bridges </li></ul><ul><li>Special Design – fly over etc…. </li></ul>B Bridge
  14. 14. <ul><li>Feasibility study and Technology Section. </li></ul><ul><li>Full and detailed Tunneling Design. </li></ul><ul><li>Environmental friendliness and Impact Assessment. </li></ul>T Tunnel
  15. 15. T Terminals
  16. 16. A Architecture
  17. 17. Consultancy and Capacity Building
  18. 18. <ul><li>Why? </li></ul><ul><ul><li>Complexity.. </li></ul></ul><ul><ul><ul><li>Lack of Coordianation, </li></ul></ul></ul><ul><ul><ul><li>Lack of Communication, </li></ul></ul></ul><ul><ul><ul><li>Lack of Progress Control, </li></ul></ul></ul><ul><ul><ul><li>Lack of Quality Control, </li></ul></ul></ul><ul><ul><ul><li>Insufficent Measurables, </li></ul></ul></ul><ul><ul><ul><li>Insufficent Stakeholders Management. </li></ul></ul></ul>C Consultancy
  19. 19. <ul><li>How? </li></ul><ul><ul><li>Through set of Processes : provides controlled start, controlled progress and controlled close to all projects. </li></ul></ul><ul><ul><li>Component : controls, business case, organization, quality, risk, planning… </li></ul></ul><ul><ul><li>Techniques : product-based planning, quality review, change control … </li></ul></ul>C Capacity Building
  20. 20. <ul><li>Process </li></ul><ul><ul><li>Project startup, </li></ul></ul><ul><ul><li>Initiating a project, </li></ul></ul><ul><ul><li>Controlling stages, </li></ul></ul><ul><ul><li>Managing Product Delivery, </li></ul></ul><ul><ul><li>Managing Stage Boundaries, </li></ul></ul><ul><ul><li>Closing a Project </li></ul></ul>C Capacity Building
  21. 21. <ul><li>Controlling Stages </li></ul><ul><ul><li>Work allocation, </li></ul></ul><ul><ul><li>Quality reviews, </li></ul></ul><ul><ul><li>Risk managment, </li></ul></ul><ul><ul><li>Change management, </li></ul></ul><ul><ul><li>Stage plan management, </li></ul></ul><ul><ul><li>Product delivery on aggreed: time, cost, quality </li></ul></ul><ul><ul><li>Reporting </li></ul></ul>C Capacity Building
  22. 22. <ul><li>Potential Benefits </li></ul><ul><ul><li>Creates stability, </li></ul></ul><ul><ul><li>Simplifies complexity, </li></ul></ul><ul><ul><li>Provides effective tool on warning of problems, </li></ul></ul><ul><ul><li>Facilitates smooth boundary/stage management, </li></ul></ul><ul><ul><li>Easily teachable, scalable and repeatable. </li></ul></ul>C Capacity Building
  23. 23. <ul><li>Adoption in 2007 </li></ul><ul><ul><li>Over 250,000 practitioners worldwide </li></ul></ul><ul><ul><li>Used on all 7 continents </li></ul></ul><ul><ul><li>Translated in more than 17 languages </li></ul></ul><ul><ul><li>More than 20 User Groups around the world </li></ul></ul><ul><ul><li>Most widely used method on all types of projects (construction, technology, etc.) </li></ul></ul>P Project Management PRINCE2 (Project Managment in a Controlled Enviroment)
  24. 24. <ul><li>For further information please contact us: </li></ul><ul><li>[email_address] or [email_address] </li></ul>THANKS!

×