Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Solar CAPEX vs RESCO/ OPEX / BOOT

198 views

Published on

Many Companies are confused about the right financial model for their Solar Project. This presentation Solar CAPEX or Solar RESCO (OPEX) attempts present deeper insight to give a comparison between the two most popular models.

There is no one-size-fits-all approach and what may work for one Company may not work for other. Each financial model has it's own pros and cons and the chosen financial model should deliver inline with a Company's strategic objectives of going Solar.

Published in: Environment
  • Be the first to comment

Solar CAPEX vs RESCO/ OPEX / BOOT

  1. 1. Comparative Analysis Solar CAPEX vs Solar BOOT
  2. 2. Enerco Energy Solutions LLP Phone : 022 42643671 Email : solar@econserve.in Mobile : 9890737447 Website : www.econserve.in Solar CAPEX (Investment by Power Off-taker / Consumer) Solar BOOT / RESCO / OPEX (Investment by ENERCO) Capital investment of upto INR 4.0 Crores per MW would be done by the consuming company. Capital investment of upto INR 4.0 Crores per MW would be done by ENERCO. No initial investment required by the consuming company. 40% Accelerated Depreciation as per Indian IT Rules can be claimed by off-taker. 40% Accelerated Depreciation as per Indian IT Rules will be claimed by ENERCO. Operation and Maintenance of the Project is the scope of Consuming Company., typically about INR 6-8 Lakh per MW per Annum + replacement cost of equipment, if any. Operation and Maintenance of the Project is in the scope of ENERCO. After initial investment recovery period of about 3 to 5 years, FREE power is available to consuming Company for 20+ years. Off-taker continues to pay to ENERCO for the duration of PPA (typically 10 to 20 years). Technology risks are more as once installed the projects would have a life of 25 years. Technology risks are lesser as technology up- gradation could be negotiated with the ENERCO (subject to conditions). Expected Project IRR would be 15% (+Tax Benefits) Consumer will start saving from the first day of project commissioning on discounted grid tariff (typically INR 4.5 per kWh for a MW+ project)
  3. 3. Enerco Energy Solutions LLP Phone : 022 42643671 Email : solar@econserve.in Mobile : 9890737447 Website : www.econserve.in Assets owned by off-taker from the 1st day of operations. Assets can be transferred to off-taker with a buyback option for each year post commissioning. Performance of the project is responsibility of one-time Contractor chosen for the project. Performance of the project is responsibility of ENERCO to give ensure most optimum output. There are other possible FINANCIAL models such as : 1. EMI with payback option of 3 to 5 years. 2. Combination of above 2 models i.e. Performance linked PPA. 3. Open Access OPEX / 3rd party Open Access. 4. Deferred EPC + Customized EPC Package etc. 5. Customized Financial model. Contact us to NOW know more : www.econserve.in / solar@econserve.in / +91 9890737447 ENERCO ENERGY SOLUTIONS LLP (estd. 2009) is India’s oldest and most reputed Solar Power Company. Clientele – And Many Many More….

×