SlideShare a Scribd company logo
1 of 1
Download to read offline
I:CIRCMSC011482.doc
E
4 ALBERT EMBANKMENT
LONDON SE1 7SR
Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210
MSC.1/Circ.1482
26 June 2014
EARLY IMPLEMENTATION OF THE AMENDMENTS TO SOLAS REGULATION II-1/29
1 The Maritime Safety Committee, at its ninety-third session (14 to 23 May 2014),
adopted, by resolution MSC.365(93), amendments to SOLAS regulation II-1/29, concerning
the methods to demonstrate compliance with the requirements relating to the main and
auxiliary steering gear.
2 In adopting the aforementioned amendments, the Committee agreed to allow
compliance to be demonstrated in accordance with the methods listed under paragraphs 3.2
and 4.2 of the amended regulation before the entry-into-force date of the related amendments.
3 Member Governments, shipyards and shipowners are invited to take account of this
circular and bring it to the attention of all parties concerned.
___________

More Related Content

Viewers also liked

Above and Beyond Honors__01
Above and Beyond Honors__01Above and Beyond Honors__01
Above and Beyond Honors__01Joe Acosta
 
iTeam World 网路系统平台
iTeam World 网路系统平台iTeam World 网路系统平台
iTeam World 网路系统平台iTeam World
 
12 case studies on doctor reputation management teaser
12 case studies on doctor reputation management teaser12 case studies on doctor reputation management teaser
12 case studies on doctor reputation management teaserHealthcare Marketing Center
 
Sécuriser votre site web azure, c'est simple maintenant!
Sécuriser votre site web azure, c'est simple maintenant!Sécuriser votre site web azure, c'est simple maintenant!
Sécuriser votre site web azure, c'est simple maintenant!Chourouk HJAIEJ
 
Llantas OTR - Mantenimiento
Llantas OTR - MantenimientoLlantas OTR - Mantenimiento
Llantas OTR - Mantenimientoreptell
 
Cadenced flow overview
Cadenced flow overviewCadenced flow overview
Cadenced flow overviewLeanDog
 
创业角度看人性 Workface 分享
创业角度看人性 Workface 分享创业角度看人性 Workface 分享
创业角度看人性 Workface 分享Hui Li (李辉)
 

Viewers also liked (9)

Above and Beyond Honors__01
Above and Beyond Honors__01Above and Beyond Honors__01
Above and Beyond Honors__01
 
Presentación1
Presentación1Presentación1
Presentación1
 
iTeam World 网路系统平台
iTeam World 网路系统平台iTeam World 网路系统平台
iTeam World 网路系统平台
 
12 case studies on doctor reputation management teaser
12 case studies on doctor reputation management teaser12 case studies on doctor reputation management teaser
12 case studies on doctor reputation management teaser
 
Sécuriser votre site web azure, c'est simple maintenant!
Sécuriser votre site web azure, c'est simple maintenant!Sécuriser votre site web azure, c'est simple maintenant!
Sécuriser votre site web azure, c'est simple maintenant!
 
Chapter 3
Chapter 3Chapter 3
Chapter 3
 
Llantas OTR - Mantenimiento
Llantas OTR - MantenimientoLlantas OTR - Mantenimiento
Llantas OTR - Mantenimiento
 
Cadenced flow overview
Cadenced flow overviewCadenced flow overview
Cadenced flow overview
 
创业角度看人性 Workface 分享
创业角度看人性 Workface 分享创业角度看人性 Workface 分享
创业角度看人性 Workface 分享
 

Similar to Msc.1 circ.1482 steering geer solas

Res.msc.436(99) solas amendments-Amendments to Chapters II-1, IV and Appendix...
Res.msc.436(99) solas amendments-Amendments to Chapters II-1, IV and Appendix...Res.msc.436(99) solas amendments-Amendments to Chapters II-1, IV and Appendix...
Res.msc.436(99) solas amendments-Amendments to Chapters II-1, IV and Appendix...Admin-marinerscircle
 
IMSAS TRACECA - Istanbul Jan 2015
IMSAS TRACECA - Istanbul Jan 2015IMSAS TRACECA - Istanbul Jan 2015
IMSAS TRACECA - Istanbul Jan 2015Ivaylo Valev
 
Guidelines for compliance with annex v
Guidelines for compliance with annex vGuidelines for compliance with annex v
Guidelines for compliance with annex vanilrai
 
MSC 96.pptxssslsljslmjkmlskmlkMlkmlkMLKmlkMLKm
MSC 96.pptxssslsljslmjkmlskmlkMlkmlkMLKmlkMLKmMSC 96.pptxssslsljslmjkmlskmlkMlkmlkMLKmlkMLKm
MSC 96.pptxssslsljslmjkmlskmlkMlkmlkMLKmlkMLKmadelbelkacem6
 
MSC.365(93) amendments for chp ii-1 and ii-2 of solas
MSC.365(93) amendments for chp ii-1 and ii-2 of solasMSC.365(93) amendments for chp ii-1 and ii-2 of solas
MSC.365(93) amendments for chp ii-1 and ii-2 of solasAdmin-marinerscircle
 

Similar to Msc.1 circ.1482 steering geer solas (6)

Res.msc.436(99) solas amendments-Amendments to Chapters II-1, IV and Appendix...
Res.msc.436(99) solas amendments-Amendments to Chapters II-1, IV and Appendix...Res.msc.436(99) solas amendments-Amendments to Chapters II-1, IV and Appendix...
Res.msc.436(99) solas amendments-Amendments to Chapters II-1, IV and Appendix...
 
IMSAS TRACECA - Istanbul Jan 2015
IMSAS TRACECA - Istanbul Jan 2015IMSAS TRACECA - Istanbul Jan 2015
IMSAS TRACECA - Istanbul Jan 2015
 
Guidelines for compliance with annex v
Guidelines for compliance with annex vGuidelines for compliance with annex v
Guidelines for compliance with annex v
 
MSC 96.pptxssslsljslmjkmlskmlkMlkmlkMLKmlkMLKm
MSC 96.pptxssslsljslmjkmlskmlkMlkmlkMLKmlkMLKmMSC 96.pptxssslsljslmjkmlskmlkMlkmlkMLKmlkMLKm
MSC 96.pptxssslsljslmjkmlskmlkMlkmlkMLKmlkMLKm
 
Msc 366 93
Msc 366 93Msc 366 93
Msc 366 93
 
MSC.365(93) amendments for chp ii-1 and ii-2 of solas
MSC.365(93) amendments for chp ii-1 and ii-2 of solasMSC.365(93) amendments for chp ii-1 and ii-2 of solas
MSC.365(93) amendments for chp ii-1 and ii-2 of solas
 

More from Marcelo Borba

IMO Action plan and procedures 2016/2017
IMO Action plan and procedures 2016/2017IMO Action plan and procedures 2016/2017
IMO Action plan and procedures 2016/2017Marcelo Borba
 
IMO ACTION PLAN AND PROCEDURES 2016/2017
IMO ACTION PLAN AND PROCEDURES 2016/2017IMO ACTION PLAN AND PROCEDURES 2016/2017
IMO ACTION PLAN AND PROCEDURES 2016/2017Marcelo Borba
 
Nape uruguay round 3 presentation 2016 v3
Nape uruguay round 3 presentation 2016 v3Nape uruguay round 3 presentation 2016 v3
Nape uruguay round 3 presentation 2016 v3Marcelo Borba
 
Offshore / drilling uruguay round 3 presentation 2016 v3
Offshore / drilling uruguay round 3 presentation 2016 v3Offshore / drilling uruguay round 3 presentation 2016 v3
Offshore / drilling uruguay round 3 presentation 2016 v3Marcelo Borba
 
IMO - Circular Letter about Ebola Virus Disease
IMO - Circular Letter  about Ebola Virus DiseaseIMO - Circular Letter  about Ebola Virus Disease
IMO - Circular Letter about Ebola Virus DiseaseMarcelo Borba
 
MSC.1/Circ.1408 on Interim Recommendations for port and coastal States regard...
MSC.1/Circ.1408 on Interim Recommendations for port and coastal States regard...MSC.1/Circ.1408 on Interim Recommendations for port and coastal States regard...
MSC.1/Circ.1408 on Interim Recommendations for port and coastal States regard...Marcelo Borba
 
MSC.1/Circ.1406 Rev. 1 Revised interim recommendations for flag States on the...
MSC.1/Circ.1406 Rev. 1 Revised interim recommendations for flag States on the...MSC.1/Circ.1406 Rev. 1 Revised interim recommendations for flag States on the...
MSC.1/Circ.1406 Rev. 1 Revised interim recommendations for flag States on the...Marcelo Borba
 
MSC.1/Circ.1405 Rev.1 Revised Interim Guidance to shipowners, ship operators,...
MSC.1/Circ.1405 Rev.1 Revised Interim Guidance to shipowners, ship operators,...MSC.1/Circ.1405 Rev.1 Revised Interim Guidance to shipowners, ship operators,...
MSC.1/Circ.1405 Rev.1 Revised Interim Guidance to shipowners, ship operators,...Marcelo Borba
 

More from Marcelo Borba (8)

IMO Action plan and procedures 2016/2017
IMO Action plan and procedures 2016/2017IMO Action plan and procedures 2016/2017
IMO Action plan and procedures 2016/2017
 
IMO ACTION PLAN AND PROCEDURES 2016/2017
IMO ACTION PLAN AND PROCEDURES 2016/2017IMO ACTION PLAN AND PROCEDURES 2016/2017
IMO ACTION PLAN AND PROCEDURES 2016/2017
 
Nape uruguay round 3 presentation 2016 v3
Nape uruguay round 3 presentation 2016 v3Nape uruguay round 3 presentation 2016 v3
Nape uruguay round 3 presentation 2016 v3
 
Offshore / drilling uruguay round 3 presentation 2016 v3
Offshore / drilling uruguay round 3 presentation 2016 v3Offshore / drilling uruguay round 3 presentation 2016 v3
Offshore / drilling uruguay round 3 presentation 2016 v3
 
IMO - Circular Letter about Ebola Virus Disease
IMO - Circular Letter  about Ebola Virus DiseaseIMO - Circular Letter  about Ebola Virus Disease
IMO - Circular Letter about Ebola Virus Disease
 
MSC.1/Circ.1408 on Interim Recommendations for port and coastal States regard...
MSC.1/Circ.1408 on Interim Recommendations for port and coastal States regard...MSC.1/Circ.1408 on Interim Recommendations for port and coastal States regard...
MSC.1/Circ.1408 on Interim Recommendations for port and coastal States regard...
 
MSC.1/Circ.1406 Rev. 1 Revised interim recommendations for flag States on the...
MSC.1/Circ.1406 Rev. 1 Revised interim recommendations for flag States on the...MSC.1/Circ.1406 Rev. 1 Revised interim recommendations for flag States on the...
MSC.1/Circ.1406 Rev. 1 Revised interim recommendations for flag States on the...
 
MSC.1/Circ.1405 Rev.1 Revised Interim Guidance to shipowners, ship operators,...
MSC.1/Circ.1405 Rev.1 Revised Interim Guidance to shipowners, ship operators,...MSC.1/Circ.1405 Rev.1 Revised Interim Guidance to shipowners, ship operators,...
MSC.1/Circ.1405 Rev.1 Revised Interim Guidance to shipowners, ship operators,...
 

Recently uploaded

List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier Fernández Muñoz
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
STATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subjectSTATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subjectGayathriM270621
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProRay Yuan Liu
 

Recently uploaded (20)

List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptx
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
STATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subjectSTATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subject
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision Pro
 

Msc.1 circ.1482 steering geer solas

  • 1. I:CIRCMSC011482.doc E 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210 MSC.1/Circ.1482 26 June 2014 EARLY IMPLEMENTATION OF THE AMENDMENTS TO SOLAS REGULATION II-1/29 1 The Maritime Safety Committee, at its ninety-third session (14 to 23 May 2014), adopted, by resolution MSC.365(93), amendments to SOLAS regulation II-1/29, concerning the methods to demonstrate compliance with the requirements relating to the main and auxiliary steering gear. 2 In adopting the aforementioned amendments, the Committee agreed to allow compliance to be demonstrated in accordance with the methods listed under paragraphs 3.2 and 4.2 of the amended regulation before the entry-into-force date of the related amendments. 3 Member Governments, shipyards and shipowners are invited to take account of this circular and bring it to the attention of all parties concerned. ___________