CHENNAI INSTITUTE OF TECHNOLOGY              6. CONSTRUCTION TECHNIQUES, EQUIPMENT AND PRACTICES                          ...
CHENNAI INSTITUTE OF TECHNOLOGY                              UNIT II - CONSTRUCTION PRACTICES                             ...
CHENNAI INSTITUTE OF TECHNOLOGY                           UNIT III - SUB STRUCTURE CONSTRUCTION                           ...
CHENNAI INSTITUTE OF TECHNOLOGY70) What are all the types of domes?71) What are all the usage of adopting domes?72) Define...
CHENNAI INSTITUTE OF TECHNOLOGY                             PART-B95) Write notes on trenching equipment.96) What are all ...
CHENNAI INSTITUTE OF TECHNOLOGY                            7. SURVEYING-I                              Question Bank______...
CHENNAI INSTITUTE OF TECHNOLOGY3.   What do you understand by plane table survey? What are the advantages and dis-advantag...
CHENNAI INSTITUTE OF TECHNOLOGYCompute the interior angle at B.    28. Following are the observed magnetic bearings of the...
CHENNAI INSTITUTE OF TECHNOLOGY    15. What do you understand by reciprocal leveling    16. What are the different types o...
CHENNAI INSTITUTE OF TECHNOLOGY22. The areas enclosed by contours on the upstream face of dam in a hydro-electric project ...
CHENNAI INSTITUTE OF TECHNOLOGY    12. Calculate the independent coordinates of the stations from the following observatio...
CHENNAI INSTITUTE OF TECHNOLOGY    Determine the salient parameters of the simple circular curve.17. Two straights AB and ...
CHENNAI INSTITUTE OF TECHNOLOGY.
Upcoming SlideShare
Loading in …5
×

Ctep civil

2,075 views

Published on

ctep notes

2 Comments
0 Likes
Statistics
Notes
  • Be the first to like this

No Downloads
Views
Total views
2,075
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
55
Comments
2
Likes
0
Embeds 0
No embeds

No notes for slide

Ctep civil

  1. 1. CHENNAI INSTITUTE OF TECHNOLOGY 6. CONSTRUCTION TECHNIQUES, EQUIPMENT AND PRACTICES Question bank UNIT I - CONCRETE TECHNOLOGY PART-A1) What are all the types of cement?2) Write the ASTM classifications of cement?3) What are all the uses of rapid hardening cement?4) Write the usage of quick settling cement?5) Define hydration of the cement?6) Differentiate dry process and wet process of manufacturing cement?7) Define batching, what are all the methods of batching?8) What are all the raw materials of the cement?9) Write notes on steam curing.10) Define non destructive testing.11) Write the requirement of supervision needed when concreting.12) What are all the transporting equipment needed to transport the concrete?13) Which is the efficient type of vibrator used to compact the concrete?14) What are all the types of concrete test? PART-B15) Explain the manufacturing of cement with neat sketches and flow chart16) Explain briefly about the chemicals used in concrete and their advantages17) Write the step by step procedure for BIS mix design18) Explain the procedure of compression test on concrete19) What are all the different types of curing of concrete explain detailedly20) What are all the different methods adopting to transport concrete explain detailedly?
  2. 2. CHENNAI INSTITUTE OF TECHNOLOGY UNIT II - CONSTRUCTION PRACTICES PART-A21) What are all the steps involved in site clearance?22) How will you mark a site for setting out a foundation?23) Define the term masonry.24) Explain the sequence of operation in construction with an example.25) What is composite masonry?26) What are all the types of ashlar masonry?27) Differentiate English bond and Flemish bond.28) Write notes on zig-zag bond29) Write notes on temporary shed30) What are all the types of scaffolding?31) Write notes on centring32) Define dampness33) What are all the causes of dampness?34) What are all the types of damp proofing courses?35) What are all the different types of bonds in masonry PART-B36) Write the fire protective requirement of the building37) Explain the various types of foundation with neat sketches38) Explain the various types of stone masonry with neat sketches39) Make a comparison between stone masonry and brick masonry40) Explain the various types of flooring with neat sketches41) Explain the various types of trusses with neat sketches42) Explain the various types of roof finishes with neat sketches43) Write notes on acoustic of the building44) Write the step by step procedure of laying of brick45) What are all the various types of roof finishes
  3. 3. CHENNAI INSTITUTE OF TECHNOLOGY UNIT III - SUB STRUCTURE CONSTRUCTION PART-A46) Define box jacking47) Differentiate pie jacking and box jacking48) Write notes on under water construction of diaphragm walls49) What are all the techniques adopted for tunneling?50) What are all te different types of coffer dams?51) Write short note on well foundation.52) Write notes on sheet piles.53) Define anchoring.54) What is well point explain?55) Define dewatering? PART-B56) Explain under water construction of diaphragm walls with neat sketches.57) Write the operation procedure for caissons58) Explain the various types of sheet piles.59) Explain the methods of piling60) Write notes on Dewatering and stand by Plant equipment for underground open excavation. UNIT IV - SUPER STRUCTURE CONSTRUCTION PART-A61) Define bridge decks62) What are all the types of off shore platforms?63) What are all the specials forms for shells?64) What is the major technique adopted for heavy decks?65) Define the term pre stress concrete66) Define sky scrapers67) Define articulated structures68) What are all the light weight components of tall structures?69) Define support structures
  4. 4. CHENNAI INSTITUTE OF TECHNOLOGY70) What are all the types of domes?71) What are all the usage of adopting domes?72) Define space decks73) What are all the usage of space decks74) What is all the usage of pre stress concrete? PART-B75) Write notes on material handling76) Explain the types of bridge decks with sketch77) What is the procedure of erecting heavy decks78) Write detailed notes on erecting light weight components on tall structures79) Explain the method of Erection of articulated structures80) Write notes on braced domes and space decks UNIT V - CONSTRUCTION EQUIPMENT PART-A81) What are all the major earth moving operations?82) Define tractors.83) What are all the operations conducted with the help of tractors?84) Write the parts of a motor graders.85) Define scrapers.86) What are all the parts of scraper?87) How can scrapers help to increase the speed of construction?88) Write short notes on earth movers.89) What are all the various forms of earth movers?90) Write short notes on pile driving equipment.91) Differentiate single acting hammer and double acting hammer92) What are all the compacting equipments?93) What is TBM explain shortly.94) What is the need of equipment management in site?
  5. 5. CHENNAI INSTITUTE OF TECHNOLOGY PART-B95) Write notes on trenching equipment.96) What are all the points should be considered while selecting an earth work equipment97) Explain the important and working of tractors and scrapers.98) Explain the equipment used for mixing and compaction of concrete.99) Explain briefly about the various pile driving equipments.100) Write notes on equipment used for erection of structures.
  6. 6. CHENNAI INSTITUTE OF TECHNOLOGY 7. SURVEYING-I Question Bank_______________________________________________________________________ UNIT-I INTRODUCTION AND CHAIN SURVEYING1. Define surveying.2. State two primary divisions of surveying.3. Enumerate the fundamental parameters of surveying measurement?4. State the basic principles of surveying.5. State the basic assumptions of plane surveying.6. Differentiate between plan and map.7. Enumerate the essential elements of a map.8. What are the classifications of survey?9. What do you understand by “measurement” in surveying practice?10. Define “significant figures” and “rounding off” of a measurement. Explain their relevance in surveying.11. List the different types of errors in survey measurement and state their significance12. Describe how you would range a survey line between two stations which are not intervisible?13. What do you mean by limiting length of ‘off set’ in chain surveying?14. What are the equipments used to measure right angle in the chain surveying?15. Enumerate the instruments used for measurement of lengths of survey lines16. Distinguish between perpendicular offset and oblique offset, with neat sketches.17. Which of the following scale is the smallest and largest respectively: (i) 1 cm = 10 meter. (ii) 1: 10,000. (iii) R.F=1/100, 000 (iii) 1cm=1000 Km18. The distance between two stations were repeated 10 times and observed to be as follows: 500.335m, 500.360m; 501.345m, 500.395m, 500.420m, 500.355m, 500.315m, 500.360m, 500.415m, and 500.325m. Justify, if there is any observation having gross error.19. Illustrate with neat sketches, various types of obstacles encountered in chain surveying.20. A survey line PQ intersects a pond. To overcome these obstacle two stations A and B were taken on either side of the pond. A line AC, 90 m long was laid down on the left of AB, and a second line AD, 130 m long was laid down on the right of AB. If points C, B and D are on the same straight line and CB = 75 m and BD = 78 m, determine the length AB. UNIT-II COMPASS SURVEYING AND PLANE TABLE SURVEYING1. Tabulate the differences between different types of meridians along with differences in their utilities.2. What is magnetic declination?
  7. 7. CHENNAI INSTITUTE OF TECHNOLOGY3. What do you understand by plane table survey? What are the advantages and dis-advantages of Plane Tabling? List the different accessories used in plane tabling along with their uses.4. Describe the steps involved in setting up of a Plane Table.5. Explain the different operation involved in temporary adjustment of plane table surveying.6. Enumerate the different types of plane tabling and highlight the topographical conditions under each is generally used.7. Describe the method of orientation of plane table by Backsight method.8. Define "three point problem" in Plane Tabling.9. What do you understand by "Trial and Error" method of solving Three point problem?10. Explain the basic Lehmanns Rule for reducing the number of trials. Further, state the additional rules for special cases.11. Define Bearing.12. Define Dip and Declination13. Define local attraction14. Define W.C.B.15. What is the use of plane table Survey?16. Draw and explain the prismatic compass.17. Write merits and demerits of the plane table.18. Explain the instruments used in plane table surveying19. Explain two point problem with diagram20. Explain Bessel’s method with diagram.21. Define ‘bearing of lines’ and ‘true meridian’ in compass surveying.22. What is ‘orienting the table’ in plane table surveys?23. What do you understand by quadrantal bearing of a line?24. What is plane table surveying? When is it preferred?25. A survey line AB crosses a river obliquely. P and Q are two points selected on the line one at each end of the river. Another line EPF is run parallel to the centre line of the river and point E is such that angle QEP is right angle and EP = PF = 100 m. A third point G is set at a distance of 150 m from P such that angle GFP is also right angle. Compute the distance PQ.26. The magnetic bearing of a line was found to be N 60° 30 W in 1992, when the declination was 5° 10 E. find its present magnetic bearing, if declination is 3° W.27. The bearing taken for two lines are as follows: Line Fore Bearing Back Bearing AB S 37° 30 E 322° 30 (WCB) BC 223° 15 (WCB) N 44° 15 E
  8. 8. CHENNAI INSTITUTE OF TECHNOLOGYCompute the interior angle at B. 28. Following are the observed magnetic bearings of the traverse legs: Line PQ QR RS SP FB 74° 20 107° 20 224° 50 200° 15 BB 256° 00 286° 20 44° 50 126° 00 29. At what stations local attraction is suspected? Determine the correct bearings of the traverse legs and also calculate the included angles. 30. What are the precautions to be adopted in using the Compass? 31. The bearings of the sides of a traverse ABCDE are as follows : Side Fore bearing Back bearing AB 107º 15 287º 15 BC 22º 0 202º 0 CD 281º 30 101º 30 DE 189º 15 9º 15 EA 124º 45 304º 45 Compute the interior angles of the traverse. UNIT-III LEVELLING AND APPLICATIONS 1. Why levels are usually called as “spirit level”? 2. Explain the importance of level tube in a leveling instrument. 3. Explain the chief feature of a digital level. 4. State the differences in the temporary adjustment of a dumpy level and an IOP level. 5. State the difference between a dumpy level and a digital level. 6. Enumerate the order in which the permanent adjustment of a tilting level are carried out. 7. Describe the two peg method of permanent adjustment of a dumpy level State and explain the basic principle of leveling. 8. Enumerate the difference between rise and fall method (of reduction of level) and height of instrument method. 9. Enlist the classification of levelling. 10. What are the special features of precise system of levelling? 11. What are the uses of contours? 12. How do you compute the reservoir volume? 13. Define sensitivity of a bubble tube. State any two factors affecting the same. 14. Distinguish between differential levelling and reciprocal leveling
  9. 9. CHENNAI INSTITUTE OF TECHNOLOGY 15. What do you understand by reciprocal leveling 16. What are the different types of ‘levelling instruments’ used in leveling. 17. In the two-peg test of a level, the following observations are taken: Instrument at M P Staff reading on A 3.612 m 1.862 m Staff reading on B 3.248 m 0.946 M is equidistant from A and B, P is 40 m from A and 240 m from B. What is the true difference in elevation between the two points? With the level in the same position at P, to what staff reading on B should the line of sight be adjusted? What is the corresponding staff reading on A for a horizontal line of sight? Check these two staff readings against the true difference in elevation, previously determined. 18. Data from a differential leveling have been found in the order of B.S., F.S..... etc. starting with the initial reading on B.M. (elevation 150.485 m) are as follows : 1.205, 1.860, 0.125, 1.915, 0.395, 2.615, 0.880, 1.760, 1.960, 0.920, 2.595, 0.915, 2.255, 0.515, 2.305, 1.170. The final reading closes on B.M.. Put the data in a complete field note form and carry out reduction of level by Height of instrument method. All units are in meters. 19. The following reciprocal levels were taken on two stations P and Q: Instrument Average near readings, Average distant, station meter readings, meter R.L of P = 101.345 m Distance, PQ = 1645 Km P 2.165 3.810 Q 2.335 0.910 Determine the elevation of Q and the error due to refraction when the collimation error is 0.003m downward per 100m. 20. A surveyor standing on seashore can just see the top of a ship through the telescope of a levelling instrument. The height of the line of sight at instrument location is 1.65 meter above msl and the top of ship is 50 meter above sea level. How far is the ship from the surveyor? 21. The following notes refer to the reciprocal levels taken with one level: Staff Readings on RemarksInstrument Station Near Station Further stationP 1.03 1.630 Distance PQ = 800 mQ 2.74 0.950 R.L. of P = 450 mFind (i) the true R.L. of Q; • combined correction for curvature and refraction • the error in collimation adjustment of the instrument.
  10. 10. CHENNAI INSTITUTE OF TECHNOLOGY22. The areas enclosed by contours on the upstream face of dam in a hydro-electric project as Contour (m) 800 790 780 770 760 750 740 730 Area (hectares) 31.41 26.74 24.89 22.23 19.37 17.74 12.91 5.35 The lowest draw down level is 733 m. compute the full reservoir capacity23. In levelling between two points A and B on opposite banks of a river, the level was set up near A and the staff readings on A and B were 1.60 m and 2.44 m respectively. The level was then moved and set up near B, and the respective readings on A and B were 0.70 and 1.26. Find the true difference of level between A and B.24. Explain profile levelling with suitable example.25. Enlist and explain the types of errors in leveling.26. The following perpendicular offsets were taken from a chain line to a hedge : Chainage in m 0 10 20 40 60 Offset in m 6.10 7.63 4.58 5.49 8.54 Calculate the area between the chain line and the hedge using Simpson’s method.27. Write about the Prismoidal Correction to be applied to volume computation. UNIT-IV THEODALOITE SURVEYING1. Enumereate the different parts of a vernier theodolite and explain their function.2. Differentiate between Clamp screw and Tangent screw.3. What do you mean by temporary adjustment of a theodolite ?4. Describe in breif the steps of temporary adjustment in proper order.5. Enumerate the fundamental lines of a theodolite instrument and state their relationship in a permanently adjusted instrument6. Explain the use of ‘Bowditch’s rule’ in traverse computation.7. Name the different cases of ‘omitted measurements’ in theodolite surveying.8. How is a simple curve set out by using one theodolite and one chain?9. Name the two methods of measuring horizontal angles using a theodolite.10. What is an anallatic lens?11. In order to reduce the error in measurement of vertical angle a set of measurements are taken and find the average angle as 9° 02 05? form a height of instrument as 1.565m to a target height 2.165m. If the elevation of the instrument station is 189.250m above mean sea level, find the elevation of staff station. Assume any data, if required.
  11. 11. CHENNAI INSTITUTE OF TECHNOLOGY 12. Calculate the independent coordinates of the stations from the following observation of a traverse assuming independent coordinates of station A as (10000, 10000): Line AB BC CD DE EA Length (m) 89.31 219.76 151.18 159.10 232.26 WCB 45° 10 72° 05 161° 52 228° 43 300° 42Use Bowditch Rule for adjustment of errors. 13. In a traverse ABCDEFG, the line BA is taken as the reference meredian, the coordinates of the sides AB, BC, CD, DE and EF are Line AB BC CD DE EF Northing (m) 1190.9 565.3 590.5 606.9 1017.2 Easting 0 736.4 796.8 -468.0 370.4If the bearing of FG is 284° 13 and its length is 896.0m, find the length and bearing of GA. 14. In a closed traverse ABCDE running anti-clockwise, calculate the missing data: Line Length (m) W.C.B. AB 343.56 245° 18 BC 371.08 ? CD ? 113° 37 DE 417.66 37° 25 EA 457.25 321° 42 15. State and explain omitted measurements in theodolite surveying. 16. The interior angles of a closed traverse ABCDEF are as follows : , 60º 40; , 201º 38; , 93º 19; , 69º 48; , 210º 13 and , 84º 22. Compute the deflection angles of the traverse. UNIT-V ENGINEERING SURVEYS 1. Briefly explain ‘reverse curves’ and ‘shift of a transition curve’ 2. .State the relationship between the radius of a curve and the degree of the curve. 3. What are transition curves? 4. A railway curve is to be tangential to each of the following lines: 5. Lines 6. W.C.B. 7. Length (m) 8. AB 9. 0° 10. - 11. BC 12. 90° 13. 220 14. CD 15. 140° 16. -
  12. 12. CHENNAI INSTITUTE OF TECHNOLOGY Determine the salient parameters of the simple circular curve.17. Two straights AB and BC meet in an inaccessible point B and are to be connected by a simple curve of 600 m radius. Two points P and Q were selected on AB and BC respectively and the following data were obtained. R APQ = 150°, R CQP = 160°, PQ = 150.0 m18. Calculate the salient elements of the simple circular curve. Considering the chainage of point P to be 1000 m.19. Two tangents intersect at chainage 2380 m, the deflection angle being 50° 30. Compute the necessary data for setting out a 5.7° curve to connect the two tangents if it is intended to set out the curve by Rankines Method of tangential angles. Take the length of the normal chord as 30 m. Also, tabulate the values of the deflection angles for setting out with a theodolite having least count of 20".20. Two straights AB and BC meet at an inaccessible point B. They are to be connected by a simple circular curve of 500 m radius. Two points P and Q are selected on AB and BC respectively, and the following data are obtained: RAPQ = 157° 22 ; RCQP = 164° 38 ; PQ = 200 m.21. Calculate the necessary data for setting out the curve by the method of deflection angle. The nominal length of chord is 30 m. Assume any data missing.22. A transition curve of length 230 m joins a straight to a circular curve of radius 800 m. What is the angle turned by the transition curve and what is the necessary shift?. Find the length of offset to the transition at a distance 150 m from the short along the tangent.23. Two straights AB and BC intersect at chainage 1000 m, the deflection angle being 40°. It is proposed to insert a right-handed circular curve 400 m radius with a cubic parabola of 90 m length at each end. The circular curve is to be set out with pegs at 20 m intervals and the transition curves at 10 m intervals. Find the24. Chainage at the begining and end of the combined curve25. Chainages at the junction of the transition curve with circular curves26. tangential angles for the first two points on the first transition curve27. tangential angles for the first two points on the circular curves28. Enumerate the classification of curves in Engineering surveys.29. Two straights intersect at a deflection angle of 80? and are connected by a circular curve of radius 10 chains. Find the length of ‘each end tangent’, the ‘curve’, and the ‘long chord’, the Apex distance; the ‘Mid ordinate of the curve’ and the ‘Degree of the curve’.