  • By; Kasan-gai Pheiga Gangmei Program CoordinatorRNBA / RRC
  • Re-survey in RNBA operating areas
  • On Process
  • Technical training
  • PRDA
  • REACH-M
  • CKASWACA
  • REACH-M
  • RNBA

    1. 1. Supported by JTT-MUMBAI development & relief department Rongmei Naga Baptist Association (RNBA) OBJECTIVESGravity flow of water is harvested through check/weird dam, irrigationalcanal and pipelines for agriculture purpose and increase foodproduction.Income increased for small & marginal farmers through cultivation ofdifferent crops.Water and land resource are utilized judiciously by the community. Presented by; Mumai Pheiga Secretary RNBA
    2. 2.  YEOMEN EXTENSION SERVICES (YES) -SENAPATI ACTION OF WOMEN IN DEVELOPMENT (AWID) -UKHRUL DEVELOPMENT AGENCY FOR TRIBLE PEOPLE (DATP) -TAMENGLONG EVANGELICAL ASSEMBLY CHURCH (EAC) -CHURACHANDPUR PEOPLE’S RESOURCE DEVELOPMENT ASSOCIATION (PRDA) -BISHNUPUR RURAL AID SERVICES (RAS) -CHURACHANDPUR WOMEN ACTION FOR RECONSTRUCTION & REFORMATION (WARR) -UKHRUL CHAMDIL KHUBUL SOCIAL WELFARE ARTS & CULTURE ASSOCIATION (CKSWACA) -CHANDEL WEAKER SECTION’S DEVELOPMENT COUNCIL (WSDC) -CHANDEL RURAL EDUCATON & ACTION FOR CHANGE,MANIPUR (REACH-M) -CHANDEL ZELIANGRONG EVENGELICAL FELLOWSHIP (ZEF) -TAMENGLONG RURAL WOMEN UPLIFTMENT SOCIETY (RWUS) -CHURACHANDPUR RONGMEI CHRISTIAN DEVELOPMENT SOCIETY (RCDS) -BISHNUPUR RONGMEI NAGA BAPTIST ASSOCIATION (RNBA) -TAMENGLONG
    3. 3. PROJECT PEOPLEORGANISATION NO. NO. OF POPULATION TO BE DISTRICT VILLAGES BENIFITED YES 3 240 SENAPATI AWID 2 267 UKHRUL DATP 2 145 TAMENGLONG EAC 2 255 CHURACHANDPUR PRDA 2 415 BISHNUPUR RAS 2 253 CHURACHANDPUR WARR 4 640 UKHRUL WSDC 2 517 CHANDEL REACH-M 5 810 CHANDEL ZEF 2 330 TAMENGLONG RWUS 8 233 CHURACHANDPUR RCDS 2 275 BISHNUPUR CKSWACA 5 385 CHANDEL RNBA-NGO 3 318 TAMENGLONG Total= 14 44 5083 6
    4. 4. PROGRAM COMPONENTSA CONSTRUCTION WORK INFRASTRUCTURE INPUTS No./Metre1 Check dam 232 Renovation of check dam 043 Intake chamber/structure construction 214 Distribution chamber/reservoir & Outlet Box 245 Canal lining/excavation of irrigational canal 3593 Metre (Expected)6 Water Transport pipelines (HDP), Culvert & Pick-up 63 Metre (Expected)7 Boulder Sausage NilB SOCIAL MOBILISATION1 Joint meetings of implementing Partner NGO and User 28 times Groups2 Data Collection from villages (1st year and 2nd year) 75 villagesC CAPACITY BUILDING1 Joint workshops of SDTT/JTT/RNBA/NGO partners 4 times
    5. 5. DETAILS OF PROJECT ACTIVITIES/VILLAGE/LOCATION/AREA COVERAGE OF PARTNER WISE.Sl. Name of Name of villages Activities to be taken up Total family Area to beNo PIO’s involved to be covered covered (Acres)1 Action of Women in T-chanhong Renovation of Check Dam/ Irrigation 19 33.5 Development (AWID) Canal Lining Taishar-2 Construction of Check Dam/ Intake Chamber. 14 22 TOTAL 33 55.52 People’s Resource G.Mongjang Check Dam 21 45 Development Gothol Check Dam-(I) ,nCheck Dam-(2) 42 73 Association (PRDA) TOTAL 63 1183 Rongmei Naga Baptist Lonjang (Kabui Khullen) Intake Chamber/ Irrigational Canal Lining 27 45.5 Association (RNBA) Bakuwa Intake Chamber(5 no.) 26 50 Bwanruangh Check Dam/Intake Chamber-(1)/ 23 69.5 Intake Chamber-(2)/ Distribution Out-let Boxes. TOTAL 76 1654 Development Agency Duigaram Check Dam./Intake Chamber. 14 36 for Tribal People Excavation of open canal (DATP) Guangram Check Dam/Intake Chamber/ 10 23 Excavation of open canal with pipeline for hard rock portion. Total 24 595 Chamdil Khubul Social Chandel Christian Check Dam/ Irrigation Canalining/ Excavation. 40 114 Welfare Arts & Culture Chamdil Khubul, Renovation of Check Dam/ lining/Excavation. 41 215.6 Association (CKSWACA) Chandel Christian-Hnatham Check Dam/Lining/Excavation 22 90 Total 103 4206 Rural Women Upliftment Thenmuol Check Dam-(1) 16 33 Society (RWUS) Hmarveng Distribution Outlet Reservoir 19 50 TOTAL 35 83
    6. 6. Sl. Name of Name of villages Activities to be taken up Total family to be Area to be coveredNo PIO’s involved covered Acres7 Zeliangrong Evangelical Phallong Check Dam 25 53 Fellowship (ZEF) Machiengluang Intake Chamber/Canal Lining Excavation. 30 27 TOTAL 55 808 Rural Aid Service (RAS) B.Kaljang Construction of Check Dam/ Distribution 28 148 Outlet Box. Boljol Check Dam/ Distribution Outlet/ 25 105 Irrigational canal Lining/ Pipeline Outlet Box. TOTAL 53 2539 Rural Education and Action for Langol Distribution Outlet-Box/ Pipeline fitting/ 106 111.15 Change-Manipur Culvert Pick up weir (REACH-M) Kangshang-2 Check Dam/ Distribution Outlet-Box/ lining. 16 34.58 Machi, Check Dam/ DistributionOutlet-Box/ Lining 15 10 TOTAL 137 18610 Weaker Section’s Development Laiching Khunman Check Dam/Lining/Excavation 19 49 Council (WSDC) Lainingkhul Check Dam/Lining/Excavation 23 35 TOTAL 42 8411 WomenAction For Reconstruction Phange 1&2 Check Dam-(1)Check Dam-(2) 15 22.0 & Reformation (WARR) Maku Check Dam(1)Check Dam-(2) 43 50 51 50 TOTAL 109 12212 (EAC) Tuiningkhal Renovation of Check Dam/ Pipeline fitting/ 21 80 Culvert Pick up weir. G. Khonom Check Dam 20 100 TOTAL 41 180
    7. 7. Sl. No Name of Name of Activities to be Total family Area to be PIO’s villages taken up to be covered covered involved (Acres)13 Yeomen Extension Services (YES) Amesiiphro Check Dam-(1)/ 17 47 Check Dam-(2)/ Canal Lining Excavation Taphou Maram & Check Dam/ Intake 17 37 Rongmei Namthan Chamber/ Irrigation-Canal Lining Excavation TOTAL 34 84 14 Rongmei Christian Development Wainem Intake Chamber/Structure/ 30 67 Society (RCDS) Canal Lining/ Excavation Thenjang Renovation of Check Dam/ 21 43 Irrigation of Canal lining. TOTAL 51 110 Grand Total 849 2782
    8. 8. Zou, 1% Mao Puimei(Kabui), Paite, 0% Chothe, 4% Poumei Maram 2% , Mao, 1% Thangal Poumei, 1% Rongmei Liangmei, 1% Tangkhul Maram, 1% Kuki Chiru, 0% Meitei Thangal, 1% Khoibu, 5% Vaiphei Neihsil Maring, 18% Rongmei, Gangte Lamkang, 0% 25% Anal Tangkhul, 17% Monsang Monsang, 0% Lamkang Aimol Aimol, 2% Kuki, 10% Maring Anal, 5% Khoibu Meitei, 0% Chiru Gangte, 3% Liangmei Vaiphei, 1% Puimei(Kabui) Neihsil, 0% Paite Zou ChotheIt will cover 44,villages / No. of district: 06 / No. of tribes involved: 23
    9. 9. Approximate calculationTotal land (to be covered) = 2800 Acres (Expected)Total family = 849 (Expected Beneficiaries)Total population = 5083 (Expected)Average size of land per beneficiary = 1-3 acres (Expected)Project Cost = Rs.1,19,12,893/-Per acre investment = Rs.4250/-
    10. 10. Before-construction (CKSWACA)On-construction (CKSWACA) After-construction (CKSWACA)
    11. 11. Re-survey in RNBA operating areas
    12. 12. Work in process-EAC Before -DBI On Process Before DBI After-DBI
    13. 13. Proposed Sites
    14. 14. Technical training
    15. 15. PRDA
    16. 16. PRDA
    17. 17. PRDA
    18. 18. PRDA
    19. 19. REACH-M
    20. 20. REACH-M
    21. 21. CKASWACA
    22. 22. REACH-M

    ×