Powering a world in progress par Jacques Vandermeiren | Liege Creative, 15.10.13

513 views

Published on

L’énergie est aujourd’hui un défi global qui nécessite une véritable politique énergétique transfrontalière.
Organisée dans le cadre de l’Année de l’Allemagne à l’Université de Liège, cette conférence-débat fut l’occasion d'échanger, entre experts, des impacts et enjeux de la transition énergétique sur les réseaux européens de transport d'énergie.

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
513
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Powering a world in progress par Jacques Vandermeiren | Liege Creative, 15.10.13

  1. 1. Powering a world in progress Jacques Vandermeiren, CEO Elia Group 15/10/2013 15/10/2013
  2. 2. Elia Group: reliable and resilient networks EUR million 2012 Revenues EBITDA 455.5 EBIT 305.4 Net Income 155.0 Equity TenneT GmbH 1,306.6 2,108.5 Net financial debt Regulated Asset Base 2,910.8 5,300 Investments 2012 : 400.0 m Investments 2013 : 600.0 m 15/10/2013 2
  3. 3. In Europe what are the Key Challenges… • Fast increasing share of Renewable Energy Sources • Need to achieve (quickly) • Investments in flexible Generation and Demand • Adequate Transmission capacity • Highly liquid day-ahead and Intraday markets • Harmonized or at least compatible market mechanisms • Facing the power system reality… 15/10/2013 3
  4. 4. … because the energy Transition is on… 2020 Important energy flows in Europa total PV wind 15/10/2013 Some units of production Thousand of decentralized units 4
  5. 5. 2020 Be-D-NL: Wind +PV > 50% - peak of consumption 15/10/2013 5
  6. 6. Evolution of the RES in Germany Source: 50Hertz, TenneT, Amprion, TransnetBW, Google Earth 2000 wind photovoltaics biomass 15/10/2013 2006 5,892 MW 62 MW 510 MW Area proportional to installed capacity 2012 20,472 MW 2,405 MW 3,010 MW 31,290 MW 31,451 MW 6,465 MW 6
  7. 7. In Germany: Grid Development Plan 2012 confirmed measures proposed by 50Hertz Alternating current 50Hertz measures approved by Federal Network Agency 50Hertz Measures not yet approved by Federal Network Agency Direct current Corridor D confirmed by Federal Network Agency (2 GW HVDC; route length 450 km) Construction of a new HVDC line from Lauchstädt (50Hertz) to Meitingen (Amprion) Cabinet-draft on the Federal Requirement Plan of December 2012, adopted in June 2013 15/10/2013 7
  8. 8. Investments 2012–20 for Belgium Decentralised production Meer, Rijkevorsel, Merksplas Offshore platforms to accomodate future offshore wind parks Project Stevin for shore reinforcement Reinforcement North border Additional PST, second circuit Gramme-Van Eyck Reinforcement “East loop” onshore wind Project Brabo in port of Antwerp Reinforcement Baekeland-Mercator-Doel Reinforcement South border 8
  9. 9. ALEGrO , a new electricity interconnector between Belgium and Germany Bi-directional capacity 950 – 1.200 MW Total project budget 430 M€ Construction 2016 – 2018 Commercial operation 2018 / 2019 51 kms 49 kms Security of supply Renewables integration 15/10/2013 Price convergence 9
  10. 10. 15/10/2013 10

×