BASIC LEAN TRAINING
Principle 2
Identify the value chain
Objectives
The objectives of this chapter are:
Identify the Value chain using lean methods
Principle 2
Identify the VALUE CHAIN
 Process Mapping
 VSM (Value Stream Mapping)
 Takt time, cycle time, lead time
Tools:
Information and
material flow
Identify the value chain for each service or product family and
eliminate waste
Principle 2
Advantages:
The global view of all processes and not just the
visualization of individual processes
Understand the relationships between the
various process steps and the various times and
the effect of balancing the flow
Identify Waste
Optimization of the whole
Dynamic document
Mapping of the
Value Chain
Principle 2
Principle 2
Process Mapping
Process Maps are used to:
 Capture current & new process information
 Identify flow of transaction
 Identify responsibility of different business functions
 Clearly show hand-off between functions
 Identify Value Added (VA) & Non Value Added (NVA) activities
Principle 2
Process Mapping
4 Steps to Create a Process Map
1. Create macro level flow of process
2. Determine functional areas
3. Detail the steps
4. Connect with arrows
Process Mapping Shapes
Function Functional areas within a
process
Beginningandendpoints of
the process.
Any task / activity where work is
performed. Usually written as a
noun and a verb.
Places where information is checked
against established criteria (standards)
& decision is made on what to do next.
Any time information is waiting before
the next process or decision (i.e. in-
baskets, out-baskets, waiting to be
batched)
When information / product is placed in
inventory (i.e. a file cabinet, directory).
Principle 2
Process Mapping
Single straight arrow – used between tasks performed by
same person or area, but no physical movement has occurred.
Box arrow – indicates physical movement of information /
product from one person / function to another.
Jagged arrow – indicates electronic movement of information
from one person / function to another.
Process Mapping Arrows
Principle 2
Process Mapping
1. Create macro level flow of
process
2. Determine the functional
areas
Process
FunctionFunctionFunctionFunction
Principle 2
Process Mapping
Process Mapping Steps
3. Detail the steps 4. Connect with arrows
Process Mapping Steps
Principle 2
Process Mapping
Exercise “Process
Mapping”
Directions:
Working in table groups, use
the Order Fulfillment
narrative description below
to develop both a macro flow
chart and a process map.
First, an order is received via telephone or mail. If the order is received by
telephone, the Customer Service Rep answering the call enters the order into
the computer during the phone call. If the order is received by mail, the
Mailroom delivers it to Order Entry where it is entered into the computer.
Once orders are entered into the computer, an Order Picker prints the order
(packing list), picks the requested items and sets them in a bin with the
packing list. The bin is then sent to the Shipping Department.
The Shipping Department checks the order against the items in the bin. If the
order is incorrect, the bin is sent back to the Order Picking area for re-picking.
If the order is correct, Shipping then chooses an appropriate sized box and
packs the order. The box is then labeled, weighed, stamped and stacked for
postal pick up.
Principle 2
Process Mapping
There are 3 kinds of VSM
Process
Factory
Enterprise
Supplier
Client
Total Value Chain
Typically, starts here...
Principle 2
Value Stream Mapping
Example
Principle 2
Value Stream Mapping
External Process (client / Supplier)
Transport
Process Data box
Inventory
Eletronical Information
Manual Information
Raw Material / Finished product
or service flow
Pushed flow
Pulled flow
Production Kanban
Operator
Principle 2
Value Stream Mapping
The VSM’s nomenclature – Most common symbols
Example
Principle 2
Value Stream Mapping
Review the current
Value Chain
…achieving this result
Many organizations focus their attention on reducing AV (added value) time …
Non value added
… but by concentrating on Waste….
Total time in the Value Chain = Lead Time
Principle 2
Value Stream Mapping
Common Improvement Activities
100%
WS 1 WS 2 WS 3 WS 4 WS 5
WorkLoad
Principle 2
Value Stream Mapping
Review the current
Value Chain
Load balancing
It is the customer who sets the pace of production
Principle 2
Takt Time
If Value describes what the customer wants, then
Takt Time describes how often he wants it.
TAKT TIME
The rate of production
trequiremenoutputAverage
timeworkingAvailable
TimeTakt
__
__
_
It is essential to understand Takt Time to assess
the capability
Principle 2
Takt Time
Customer demand = 26000 units / week
Total Time Available per day = 3 shifts x 8 h X 5 days X 60 min x 60 s
= 432000 s
Takt Time = Total Time Available in Period
Customer demand in the period
Takt Time = 432000” = 16,62 seconds/unit
26000 un.
Maximum, at every 16
seconds a piece must be
ready, so that the
customer’s order can be
matched at the right time!
Takt Time Calculation Example
Principle 2
Takt Time
https://www.youtube.com/watch?v=3osu7aJHwk0
Video: Improved Coffee Kaizen
LEAN FOR WORK AND LEAN FOR LIFE
Train the trainer to teach Lean skills in VET

More Related Content

Similar to Lean for work and Lean for life - 2 - Value chain

New folderIMAG2318.jpgNew folderIMAG2319.jpgNew folder.docx
New folderIMAG2318.jpgNew folderIMAG2319.jpgNew folder.docxNew folderIMAG2318.jpgNew folderIMAG2319.jpgNew folder.docx
New folderIMAG2318.jpgNew folderIMAG2319.jpgNew folder.docx
henrymartin15260
 
Activity Based Costing.pptx
Activity Based Costing.pptxActivity Based Costing.pptx
Activity Based Costing.pptx
1986anu
 
Eliminating the production bottlenecks
Eliminating the production bottlenecksEliminating the production bottlenecks
Eliminating the production bottlenecks
dutconsult
 
Good afternoonhere it is the 2 assignments i made that must be re.docx
Good afternoonhere it is the 2 assignments i made that must be re.docxGood afternoonhere it is the 2 assignments i made that must be re.docx
Good afternoonhere it is the 2 assignments i made that must be re.docx
josephineboon366
 

Similar to Lean for work and Lean for life - 2 - Value chain (20)

Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future State
 
Value Stream Mapping in Anatomic Pathology
Value Stream Mapping in Anatomic PathologyValue Stream Mapping in Anatomic Pathology
Value Stream Mapping in Anatomic Pathology
 
Froehling Value Stream Mapping G2 2008 Final Version
Froehling Value Stream Mapping G2 2008 Final VersionFroehling Value Stream Mapping G2 2008 Final Version
Froehling Value Stream Mapping G2 2008 Final Version
 
Lean Six Sigma Course Training Part 3
Lean Six Sigma Course Training Part 3Lean Six Sigma Course Training Part 3
Lean Six Sigma Course Training Part 3
 
Introduction to Business Process Analysis and Redesign
Introduction to Business Process Analysis and RedesignIntroduction to Business Process Analysis and Redesign
Introduction to Business Process Analysis and Redesign
 
Metrics-Based Process Mapping
Metrics-Based Process MappingMetrics-Based Process Mapping
Metrics-Based Process Mapping
 
VSM
VSMVSM
VSM
 
New folderIMAG2318.jpgNew folderIMAG2319.jpgNew folder.docx
New folderIMAG2318.jpgNew folderIMAG2319.jpgNew folder.docxNew folderIMAG2318.jpgNew folderIMAG2319.jpgNew folder.docx
New folderIMAG2318.jpgNew folderIMAG2319.jpgNew folder.docx
 
01-VSM-VSD-Training-Presentation-20140406-pptx.pptx
01-VSM-VSD-Training-Presentation-20140406-pptx.pptx01-VSM-VSD-Training-Presentation-20140406-pptx.pptx
01-VSM-VSD-Training-Presentation-20140406-pptx.pptx
 
Process costing with case study mcom -1
Process costing with case study mcom -1Process costing with case study mcom -1
Process costing with case study mcom -1
 
Activity Based Costing.pptx
Activity Based Costing.pptxActivity Based Costing.pptx
Activity Based Costing.pptx
 
Trahan
TrahanTrahan
Trahan
 
Unbiased, Fine-Grained Description of Processes Performance from Event Data
Unbiased, Fine-Grained Description of Processes Performance from Event DataUnbiased, Fine-Grained Description of Processes Performance from Event Data
Unbiased, Fine-Grained Description of Processes Performance from Event Data
 
Conducting Process Audits For Municipal Government
Conducting Process Audits For Municipal GovernmentConducting Process Audits For Municipal Government
Conducting Process Audits For Municipal Government
 
Analysis and Reduction of Production Waste in the Process of Production of Fr...
Analysis and Reduction of Production Waste in the Process of Production of Fr...Analysis and Reduction of Production Waste in the Process of Production of Fr...
Analysis and Reduction of Production Waste in the Process of Production of Fr...
 
Module Owb Tuning
Module Owb TuningModule Owb Tuning
Module Owb Tuning
 
Mass to Lean to Six Sigma Path
Mass to Lean to Six Sigma PathMass to Lean to Six Sigma Path
Mass to Lean to Six Sigma Path
 
Project : formulation,evaluation and monitoring
Project : formulation,evaluation and monitoringProject : formulation,evaluation and monitoring
Project : formulation,evaluation and monitoring
 
Eliminating the production bottlenecks
Eliminating the production bottlenecksEliminating the production bottlenecks
Eliminating the production bottlenecks
 
Good afternoonhere it is the 2 assignments i made that must be re.docx
Good afternoonhere it is the 2 assignments i made that must be re.docxGood afternoonhere it is the 2 assignments i made that must be re.docx
Good afternoonhere it is the 2 assignments i made that must be re.docx
 

More from Lean for work and Lean for life

More from Lean for work and Lean for life (20)

T07 leanf wfl_basic lean training_7summary_20191003 es
T07 leanf wfl_basic lean training_7summary_20191003 esT07 leanf wfl_basic lean training_7summary_20191003 es
T07 leanf wfl_basic lean training_7summary_20191003 es
 
T06 leanf wfl_basic lean training_6culture_20191003 es
T06 leanf wfl_basic lean training_6culture_20191003 esT06 leanf wfl_basic lean training_6culture_20191003 es
T06 leanf wfl_basic lean training_6culture_20191003 es
 
T05 leanf wfl_basic lean training_5perfection_20191110 es
T05 leanf wfl_basic lean training_5perfection_20191110 esT05 leanf wfl_basic lean training_5perfection_20191110 es
T05 leanf wfl_basic lean training_5perfection_20191110 es
 
T04 leanf wfl_basic lean training_4pull_20191003 es
T04 leanf wfl_basic lean training_4pull_20191003 esT04 leanf wfl_basic lean training_4pull_20191003 es
T04 leanf wfl_basic lean training_4pull_20191003 es
 
T03 leanf wfl_basic lean training_3continuous flow_20191012 es
T03 leanf wfl_basic lean training_3continuous flow_20191012 esT03 leanf wfl_basic lean training_3continuous flow_20191012 es
T03 leanf wfl_basic lean training_3continuous flow_20191012 es
 
T00b leanf wfl_basic lean training_0 intro_20191003 es
T00b leanf wfl_basic lean training_0 intro_20191003 esT00b leanf wfl_basic lean training_0 intro_20191003 es
T00b leanf wfl_basic lean training_0 intro_20191003 es
 
Teacher's manual 2020 12 09
Teacher's manual 2020 12 09Teacher's manual 2020 12 09
Teacher's manual 2020 12 09
 
Teacher's manual 2021
Teacher's manual 2021Teacher's manual 2021
Teacher's manual 2021
 
T06 lean basis training mens & cultuur nl
T06 lean basis training mens & cultuur nlT06 lean basis training mens & cultuur nl
T06 lean basis training mens & cultuur nl
 
T04 lean basis training principe 4 pull productie nl
T04 lean basis training principe 4 pull productie nlT04 lean basis training principe 4 pull productie nl
T04 lean basis training principe 4 pull productie nl
 
T02 lean basis training principe 2 zoek de waardestroom nl
T02 lean basis training principe 2 zoek de waardestroom nlT02 lean basis training principe 2 zoek de waardestroom nl
T02 lean basis training principe 2 zoek de waardestroom nl
 
T00b lean basis training introductie nl
T00b lean basis training introductie nlT00b lean basis training introductie nl
T00b lean basis training introductie nl
 
Lean basis training docentenhandleiding nl
Lean basis training docentenhandleiding nlLean basis training docentenhandleiding nl
Lean basis training docentenhandleiding nl
 
Teacher's manual 2020 11 09 pt
Teacher's manual 2020 11 09 ptTeacher's manual 2020 11 09 pt
Teacher's manual 2020 11 09 pt
 
T07 leanf wfl_basic lean training_7summary_20191003_pt
T07 leanf wfl_basic lean training_7summary_20191003_ptT07 leanf wfl_basic lean training_7summary_20191003_pt
T07 leanf wfl_basic lean training_7summary_20191003_pt
 
T06 leanf wfl_basic lean training_6culture_20201127_pt
T06 leanf wfl_basic lean training_6culture_20201127_ptT06 leanf wfl_basic lean training_6culture_20201127_pt
T06 leanf wfl_basic lean training_6culture_20201127_pt
 
T05 leanf wfl_basic lean training_5perfection_20201109_pt
T05 leanf wfl_basic lean training_5perfection_20201109_ptT05 leanf wfl_basic lean training_5perfection_20201109_pt
T05 leanf wfl_basic lean training_5perfection_20201109_pt
 
T04 leanf wfl_basic lean training_4pull_20201109_pt
T04 leanf wfl_basic lean training_4pull_20201109_ptT04 leanf wfl_basic lean training_4pull_20201109_pt
T04 leanf wfl_basic lean training_4pull_20201109_pt
 
T03 leanf wfl_basic lean training_3continuous flow_20201109_pt
T03 leanf wfl_basic lean training_3continuous flow_20201109_ptT03 leanf wfl_basic lean training_3continuous flow_20201109_pt
T03 leanf wfl_basic lean training_3continuous flow_20201109_pt
 
T02 leanf wfl_basic lean training_2value chain_20201126_pt
T02 leanf wfl_basic lean training_2value chain_20201126_ptT02 leanf wfl_basic lean training_2value chain_20201126_pt
T02 leanf wfl_basic lean training_2value chain_20201126_pt
 

Recently uploaded

The basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptxThe basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptx
heathfieldcps1
 
SURVEY I created for uni project research
SURVEY I created for uni project researchSURVEY I created for uni project research
SURVEY I created for uni project research
CaitlinCummins3
 

Recently uploaded (20)

diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....diagnosting testing bsc 2nd sem.pptx....
diagnosting testing bsc 2nd sem.pptx....
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
 
Capitol Tech Univ Doctoral Presentation -May 2024
Capitol Tech Univ Doctoral Presentation -May 2024Capitol Tech Univ Doctoral Presentation -May 2024
Capitol Tech Univ Doctoral Presentation -May 2024
 
Graduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxGraduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptx
 
The basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptxThe basics of sentences session 4pptx.pptx
The basics of sentences session 4pptx.pptx
 
philosophy and it's principles based on the life
philosophy and it's principles based on the lifephilosophy and it's principles based on the life
philosophy and it's principles based on the life
 
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjjStl Algorithms in C++ jjjjjjjjjjjjjjjjjj
Stl Algorithms in C++ jjjjjjjjjjjjjjjjjj
 
Improved Approval Flow in Odoo 17 Studio App
Improved Approval Flow in Odoo 17 Studio AppImproved Approval Flow in Odoo 17 Studio App
Improved Approval Flow in Odoo 17 Studio App
 
An Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge AppAn Overview of the Odoo 17 Knowledge App
An Overview of the Odoo 17 Knowledge App
 
Including Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdfIncluding Mental Health Support in Project Delivery, 14 May.pdf
Including Mental Health Support in Project Delivery, 14 May.pdf
 
“O BEIJO” EM ARTE .
“O BEIJO” EM ARTE                       .“O BEIJO” EM ARTE                       .
“O BEIJO” EM ARTE .
 
Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
 Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
 
Benefits and Challenges of OER by Shweta Babel.pptx
Benefits and Challenges of OER by Shweta Babel.pptxBenefits and Challenges of OER by Shweta Babel.pptx
Benefits and Challenges of OER by Shweta Babel.pptx
 
Basic Civil Engineering notes on Transportation Engineering, Modes of Transpo...
Basic Civil Engineering notes on Transportation Engineering, Modes of Transpo...Basic Civil Engineering notes on Transportation Engineering, Modes of Transpo...
Basic Civil Engineering notes on Transportation Engineering, Modes of Transpo...
 
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
 
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
 
SURVEY I created for uni project research
SURVEY I created for uni project researchSURVEY I created for uni project research
SURVEY I created for uni project research
 
How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17How To Create Editable Tree View in Odoo 17
How To Create Editable Tree View in Odoo 17
 
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community PartnershipsSpring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
 
Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45
Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45
Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45
 

Lean for work and Lean for life - 2 - Value chain

  • 1. T02 BASIC LEAN TRAINING Principle 2 Identify the value chain
  • 2. Objectives The objectives of this chapter are: Identify the Value chain using lean methods
  • 3. Principle 2 Identify the VALUE CHAIN  Process Mapping  VSM (Value Stream Mapping)  Takt time, cycle time, lead time Tools:
  • 4. Information and material flow Identify the value chain for each service or product family and eliminate waste Principle 2
  • 5. Advantages: The global view of all processes and not just the visualization of individual processes Understand the relationships between the various process steps and the various times and the effect of balancing the flow Identify Waste Optimization of the whole Dynamic document Mapping of the Value Chain Principle 2
  • 6. Principle 2 Process Mapping Process Maps are used to:  Capture current & new process information  Identify flow of transaction  Identify responsibility of different business functions  Clearly show hand-off between functions  Identify Value Added (VA) & Non Value Added (NVA) activities
  • 7. Principle 2 Process Mapping 4 Steps to Create a Process Map 1. Create macro level flow of process 2. Determine functional areas 3. Detail the steps 4. Connect with arrows
  • 8. Process Mapping Shapes Function Functional areas within a process Beginningandendpoints of the process. Any task / activity where work is performed. Usually written as a noun and a verb. Places where information is checked against established criteria (standards) & decision is made on what to do next. Any time information is waiting before the next process or decision (i.e. in- baskets, out-baskets, waiting to be batched) When information / product is placed in inventory (i.e. a file cabinet, directory). Principle 2 Process Mapping
  • 9. Single straight arrow – used between tasks performed by same person or area, but no physical movement has occurred. Box arrow – indicates physical movement of information / product from one person / function to another. Jagged arrow – indicates electronic movement of information from one person / function to another. Process Mapping Arrows Principle 2 Process Mapping
  • 10. 1. Create macro level flow of process 2. Determine the functional areas Process FunctionFunctionFunctionFunction Principle 2 Process Mapping Process Mapping Steps
  • 11. 3. Detail the steps 4. Connect with arrows Process Mapping Steps Principle 2 Process Mapping
  • 12. Exercise “Process Mapping” Directions: Working in table groups, use the Order Fulfillment narrative description below to develop both a macro flow chart and a process map. First, an order is received via telephone or mail. If the order is received by telephone, the Customer Service Rep answering the call enters the order into the computer during the phone call. If the order is received by mail, the Mailroom delivers it to Order Entry where it is entered into the computer. Once orders are entered into the computer, an Order Picker prints the order (packing list), picks the requested items and sets them in a bin with the packing list. The bin is then sent to the Shipping Department. The Shipping Department checks the order against the items in the bin. If the order is incorrect, the bin is sent back to the Order Picking area for re-picking. If the order is correct, Shipping then chooses an appropriate sized box and packs the order. The box is then labeled, weighed, stamped and stacked for postal pick up. Principle 2 Process Mapping
  • 13. There are 3 kinds of VSM Process Factory Enterprise Supplier Client Total Value Chain Typically, starts here... Principle 2 Value Stream Mapping
  • 15. External Process (client / Supplier) Transport Process Data box Inventory Eletronical Information Manual Information Raw Material / Finished product or service flow Pushed flow Pulled flow Production Kanban Operator Principle 2 Value Stream Mapping The VSM’s nomenclature – Most common symbols
  • 16. Example Principle 2 Value Stream Mapping Review the current Value Chain
  • 17. …achieving this result Many organizations focus their attention on reducing AV (added value) time … Non value added … but by concentrating on Waste…. Total time in the Value Chain = Lead Time Principle 2 Value Stream Mapping Common Improvement Activities
  • 18. 100% WS 1 WS 2 WS 3 WS 4 WS 5 WorkLoad Principle 2 Value Stream Mapping Review the current Value Chain Load balancing
  • 19.
  • 20. It is the customer who sets the pace of production Principle 2 Takt Time If Value describes what the customer wants, then Takt Time describes how often he wants it.
  • 21. TAKT TIME The rate of production trequiremenoutputAverage timeworkingAvailable TimeTakt __ __ _ It is essential to understand Takt Time to assess the capability Principle 2 Takt Time
  • 22. Customer demand = 26000 units / week Total Time Available per day = 3 shifts x 8 h X 5 days X 60 min x 60 s = 432000 s Takt Time = Total Time Available in Period Customer demand in the period Takt Time = 432000” = 16,62 seconds/unit 26000 un. Maximum, at every 16 seconds a piece must be ready, so that the customer’s order can be matched at the right time! Takt Time Calculation Example Principle 2 Takt Time
  • 24. LEAN FOR WORK AND LEAN FOR LIFE Train the trainer to teach Lean skills in VET

Editor's Notes

  1. A value chain is all activities (value added and / or no added value) needed to transform a product or service from raw material to the customer.
  2. The Teacher places brown paper on the Wall and tells students to develop the Process Mapping using post-its
  3. Process: information and material flow of a given process or work cell Factory: flow of information and material within the 4 walls of the factory
  4. Additional information that may (or may not) be used
  5. In this image it’s possible to verify the cycle and lead time. Definitions: Cycle Time definition: Cycle time is the time between consecutive parts (parts, units, or customers) that an operations system can produce or serve. It is defined by the slowest of the processes or steps. This process is often called bottleneck. This time is measured in unit time (eg [min / customer] or [sec / part]) and does not include non-productive times such as: malfunctions, defects, accidents or other. Due to the presence of process failures, it is common to find deviations between the planned cycle time (reference value or target cycle time) and the current cycle time. The relation between the two times can be understood as a measure of efficiency (E) of the process, that is:   E = target cycle time/actual cycle time * 100%   Cycle time does not have to be calculated, resulting from the bottleneck process or workstation (ie, from the slowest of steps). This time does not consider losses, since it is only determined when the process is in operation.     Takt Time definition: The takt time (Tt) (also a cycle time, but in this case defined by consumption), results from the following calculation: Tt = available time / search in this time [time / unit] Takt time considers losses and stops in processes. If in a given "available time period" (eg a shift or a week) the demand varies, then the takt time also varies. In contrast, the cycle time remains constant because it does not depend on the consumption (demand or customer) but on the slower of the operations. The higher the customer demand the smaller the takt time. In the situation in which the takt time is greater than the cycle time, results in wastage for the Organization due to the low resource utilization.
  6. Usually the focus is on reducing time in value added activities, achieving small results. When the focus is turned in to waste, the same % of improvement corresponds to a bigger slice of reduction.
  7. The Teacher can refer exemples that were achieved during the Ball Point Pen game.
  8. Takt Time definition: The takt time (Tt) (also a cycle time, but in this case defined by consumption), results from the following calculation: Tt = available time / search in this time [time / unit] Takt time considers losses and stops in processes. If in a given "available time period" (eg a shift or a week) the demand varies, then the takt time also varies. In contrast, the cycle time remains constant because it does not depend on the consumption (demand or customer) but on the slower of the operations. The higher the customer demand the smaller the takt time. In the situation in which the takt time is greater than the cycle time, results in wastage for the Organization due to the low resource utilization.
  9. This vídeo is only shown after the students have developed and presented the exercise