Successfully reported this slideshow.
Your SlideShare is downloading. ×

Liam brady lancs best practice club 7th march 2013 v1

Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Loading in …3
×

Check these out next

1 of 27 Ad

More Related Content

Similar to Liam brady lancs best practice club 7th march 2013 v1 (20)

More from Lancashire Construction Best Practice (20)

Advertisement

Recently uploaded (20)

Liam brady lancs best practice club 7th march 2013 v1

  1. 1. Lancs Best Practice Club – BIM for FM Liam Brady Manchester City Council 7th March 2013
  2. 2. Huge Complex = Huge amount of data
  3. 3. Poorly maintained O&M’s
  4. 4. MCC : Cabinet Office BIM Workshops
  5. 5. Transferring BIM data for operational use. Manchester Library Project BIM/Operational Data Architecture Sept 2012 Design and Transfer BIM Data Create and maintain Operational Construction beneficial to FM / an accurate repository Management of the Laing O Rourke BIM Operational life of of Building assets Complex . Data Complex COBie C-Pad Maintenance Management COBie- UK-2012 Manual Data EDMS Content Management System S urvey Data Integration Head End Granfen Control technologies Fire, security bookings, etc… , Building Management System
  6. 6. BIM Design and FM Integration Concept Design Scheme / Detailed Design FM Team Design Development Pre-Construction Embedded Considering within FM and Design Operational development requirements Construction Operational / FM/Lifecycle
  7. 7. ArtRA – Using the Building Information Model and surround Database
  8. 8. ARCHITECTURAL MODELS
  9. 9. MECHANICAL & ELECTRICAL MODEL
  10. 10. MECHANICAL & ELECTRICAL MODEL Sprinkler System
  11. 11. MECHANICAL & ELECTRICAL MODEL Sprinkler System
  12. 12. DOCUMENTATION Sprinkler System - Tank
  13. 13. MECHANICAL & ELECTRICAL MODEL Low Temperature Hot Water System
  14. 14. MECHANICAL & ELECTRICAL MODEL Low Temperature Hot Water System
  15. 15. MECHANICAL & ELECTRICAL MODEL Low Temperature Hot Water System
  16. 16. MECHANICAL & ELECTRICAL MODEL Low Temperature Hot Water System
  17. 17. Transferring BIM data for operational use. Manchester Library Project BIM/Operational Data Architecture Sept 2012 Design and Transfer BIM Data Create and maintain Operational Construction beneficial to FM / an accurate repository Management of the Laing O Rourke BIM Operational life of of Building assets Complex . Data Complex COBie C-Pad Maintenance Management COBie- UK-2012 Manual Data EDMS Content Management System S urvey Data Integration Head End Granfen Control technologies Fire, security bookings, etc… , Building Management System
  18. 18. Maintaining Accurate Asset Data – During Operational Life BIM C-Pad Job Ticket :issued to contractor Job Request – Asset Ref: 22 Repair Work to Building Ref: THX M&E Model in Asset No. 22 ArtRa with C-Pad: Level: LG attached Job raised on helpdesk to Repair - Area Ref: THX-LG-03 documentation/ Buffer Vessel No. 22 Location: Plantroom Information ARRIVE ON SITE: •  Building Ref •  Level Ref •  Area/room Ref •  Asset Ref: 22 ADDITIONAL INFORMATION AVAILABLE ON SITE FROM THE BIM (Plant Spec, etc) UPDATE DATA - Any new material / Documentation for new Contractor Carry s Vessel to be put into C- out Job Pad & amended in the (Replaces Buffer BIM Vessel!)
  19. 19. Controlled approach to Familiarisation and Handover commissioning (Clarity of roles and responsibilities) Soft Landings Involve end users Challenges and Training and aftercare opportunities / FM Team POE Focus on operational Environmental / energy performance Visitor targets outcomes Customer / staff satisfaction Set performance Objectives Share risks and Environmental performance Metering strategy responsibilities Energy assessment (POE)
  20. 20. MCC : Cabinet Office Soft Landings Workshops Town Hall Complex Soft Landing Forums •  Hand-Over Steering Group - Full Project Team (fortnightly meetings) •  Core Operational Team – M&E Focused group (fortnightly meetings) •  Development of TM 39 (metering strategy) •  Development of TM 22 (POE review of metering strategy) •  Fire Management Information workshops
  21. 21. Cabinet Construction Office Partners Supply BIM Academy Chain Architects COLLABORATION Stakeholders Sharing Knowledge, Ideas & Aspirations NW Construction Salford Hub - Partners University Attendance at BIM Conferences & Facilities NIEP Workshops Management
  22. 22. Maturity Level Data Richness 10 Interoperability/ 9 Life Cycle Views IFC Support 8 7 6 5 Information Accuracy 4 Roles or Disciplines 3 2 1 0 Spatial Capability Business Process Delivery Method Graphical Information Timeliness/Response Change Management
  23. 23. BIM – other uses being considered •  Link to fire strategy / evacuation plan •  Link to security strategy •  Thermal modelling building changes •  Link to digital Signage. •  Using BIM (hand held technologies) •  Link to Energy Management System (Zoning, out of hours use, event management etc) •  Staff induction tool •  Customer communication tool (Linked to website) •  Marketing tool, events and community schemes (Clicks and Links) •  Link to operational zones, cleaning, events etc •  Ability to run logistical tests / models (flow and movement)

×