Noppadon Kowsuvon
Northern Thailand Local Wisdom Irrigation Systems (Meung –Fai)
Sinthukit-PreCha Weir The Northern Thailand’s first Governmental Constructed Irrigation System Completed 1929
CHAINGMAI  IRRIGATION  PROJECT RID-CEO The Headquarters   of   the   Regional   Irrigation Office I   is   located   at   ...
Location The   Regional   Irrigation   office I is   one of   the  seventeen   regional   irrigation   offices,   establis...
<ul><li>Duties and Responsibilities </li></ul><ul><li>Implementation of activities aimed at achieving, collecting, storing...
Organization
Regional  Irrigation  Office  I Administration  Support Branch <ul><ul><li>Project  Consideration  Group </li></ul></ul><u...
IRRIGATION PROJECTS
CATCHMENT  AREA Mae Kuang Reservior Da. = 569  Km 2   Mae Ngad Reservior  Da. = 1,281  Km 2   Mae Ping River Da. = 1,600  ...
Nov กรมชลประทาน กระทรวงเกษตรและสหกรณ์ Runoff  8,062   MCM. Water Shortage ( Dry season )  695 MCM. Water Demand   3,715  M...
Present and Future Water Demand in Upper Ping Basin  Water Quantity  ( MCM ) Present Future  ( 20  yr.  ) 1.  Runoff Volum...
Project (4 Types)   No.   Storage   Capacity   Area (rai) 1. Large Scale Project   3   52 8   423 , 0 00   - 3. Small Scal...
โครงการชลประทานขนาดใหญ่ <ul><li>อ่างเก็บน้ำ จำนวน  2  โครงการ </li></ul><ul><li>ฝายทดน้ำ จำนวน  3   โครงการ </li></ul><ul>...
<ul><li>Large Scale  Reservoir  </li></ul><ul><li>Project  storages  528 MCM </li></ul><ul><li>Irrigated  Areas  67,700 ha...
โครงการส่งน้ำและบำรุงรักษาแม่แตง Mae Tang Weir Ping River Lumpang Lumpoon Mae Taeng Project Mae Tang weir is a reinforced ...
Irrigated Area 82,000   Rai โครงการส่งน้ำและบำรุงรักษาแม่แฝก - แม่งัด Mae Faek Project Mae Ngad Project Ping River Lumpang...
Municipal Water Supply  Electricity Generators 4,500 kw x 2 = 9,000 KW Total output approx. 24.5 million kw / year Mae Nga...
โครงการส่งน้ำและบำรุงรักษาแม่กวง เขื่อนแม่กวงอุดมธารา Mae Kuang Project Irrigated Area 175,000   Rai Ping River Lumpang Lu...
Chiang Mai City Lumpang Lumpoon Irrigated Area  48,400  Rai   Mae Ping Kao Project
16 MEDIUM  SCALE IRRIGATION  PROJECTS  IN CHIANG  MAI  IRRIGATION PROJECT Total Capacity  71.357  MCM Irrigated Area  117,...
MEDIUM  SCALE IRRIGATION  PROJECTS   IN LUMPHUN  IRRIGATION PROJECT
MEDIUM  SCALE IRRIGATION  PROJECTS   IN MAEHONGSORN  IRRIGATION PROJECT
Small Scale Irrigation Projects beneficial  areas  95,000 ha Royal  Initiative  Projects beneficial  areas  18,275 ha
Royal Initiative Project จำนวน  307  โครงการ อ่างห้วยกล้า ฝายคงคาใน ฝายทุ่งเริง
Royal Project จำนวน  2 9   ศูนย์ โครงการหลวงแม่สะป๊อก โครงการหลวงแม่โถ โครงการหลวงป่าเมี่ยง โครงการหลวงอ่างขาง
Irrigation Project in Border Village   จำนวน  9  โครงการ
People’s Irrigation Project จำนวน  6  โครงการ ฝายท่าวังตาล ฝายท่าศาลา ฝายหนองผึ้ง
Small Scale Irrigation Project จำนวน  265  โครงการ
Dredging Sediment Project จำนวน  414  โครงการ โครงการขุดลอกฯ ห้วยต้นตึง
Farm Pond จำนวน  3,015  แห่ง สระเก็บน้ำหมู่ 1  ตำบลมืดกา อำเภอดอยเต่า สระเก็บน้ำหมู่ 3  บ้านสหกรณ์ อำเภอสันกำแพง สระเก็บน้...
 
. การบริหารจัดการน้ำในอ่างเก็บน้ำขนาดใหญ่และขนาดกลาง (Reservoir Operation) Chiang Mai Lamphun Mae Hong Son Large-Scale Res...
Mae Ngad – Large Scale Project
Mae Kwung – Large Scale Project
Mae Tang – Large Scale Project
(360 m 3 /s) Chiang Mai City Lampoon Mae Ngad Project Mae Kwang Project อ่างฯแม่ธิ อ่างฯแม่ตีบ อ่างฯแม่สาน เหมืองท่าศาลา เ...
Summary Flowchart for Water Resource Management  in Upper Ping Basin
Strategic Plans  for Water Resources Management Via Infrastructure Constructions
Mae Feak Head Project Rehabilitation
Mae Feak Project System Rehabilitation  1 2 3
Mae Ngad Detail :  Divert MCM / Year  (26  cms ) Cost   4,871.54  Million Baht Beneficial -  Irrigation area increase  40,...
ประตูระบายน้ำแม่ตะมาน อาคารระบายน้ำ  :   บานระบายน้ำแบบพับได้ -  บานระบายน้ำขนาด  12.50  x  3.50  ม .  จำนวน  3  บาน -  ช่...
Mae Ping Operation Gate Project
Mae Ping Operation Gate Project 6  Regulating Gates12.50 x 6.50 m . Max Q 1,200 cms  Automatically Operated   Traditional ...
รูปด้านหน้า รูปด้านข้าง 9.75 m 9.75 m Mae Ping Operation Gate Project Side View Front View
Flood Warning and Forecast System
รายงานสถานการณ์ทาง   Internet   ใน   Website   http://www.hydro-1.com   PR with Community through Internet ( To inform the...
Telemetry เวียงแหง พร้าว เชียงดาว ดอยสะเก็ด สันทราย กิ่ง อ . บ้านธิ หางดง เชียงใหม่ ป่าซาง ลำพูน สันกำแพง แม่แตง UP.01 UP....
Real-time Telemetry System in Upper Ping Basin
ขอขอบคุณทุกท่าน สำนักชลประทานที่  1 Appreciate Your Attentions
Upcoming SlideShare
Loading in …5
×

Rid1 Modernization Indonesia

1,269 views

Published on

Published in: Technology, Business
  • Be the first to comment

  • Be the first to like this

Rid1 Modernization Indonesia

  1. 1. Noppadon Kowsuvon
  2. 2. Northern Thailand Local Wisdom Irrigation Systems (Meung –Fai)
  3. 3. Sinthukit-PreCha Weir The Northern Thailand’s first Governmental Constructed Irrigation System Completed 1929
  4. 4. CHAINGMAI IRRIGATION PROJECT RID-CEO The Headquarters of the Regional Irrigation Office I is located at Wat Ket Sub-District , Muang District, Chiang Mai Province, about 720 km from Bangkok. It is accessable by road, rail and air. Regional Irrigation Office I Height 310.00 msl
  5. 5. Location The Regional Irrigation office I is one of the seventeen regional irrigation offices, established under the Royal Irrigation Department . The Regional Irrigation office I covers Chiang Mai, Lumphun and Mae Hong Son province. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
  6. 6. <ul><li>Duties and Responsibilities </li></ul><ul><li>Implementation of activities aimed at achieving, collecting, storing, controlling, distributing, draining or allocating water for agricultural, household consumption, industrial and navigation purposes; monitoring and evaluation of safety of dams and appurtenant structures; and prevention of damages from water. </li></ul><ul><li>Operation and maintenance of irrigation structures </li></ul><ul><li>Prevention and solving of water shortage, flood and water quality problems in the responsible area. </li></ul><ul><li>Study and preparation of preliminary reports of water resources development projects in the responsible area. </li></ul><ul><li>Dissemination of modern technology and knowledge to water users. </li></ul><ul><li>Cooperation with or supporting the operation of other offices and divisions as assigned by the Department. </li></ul>
  7. 7. Organization
  8. 8. Regional Irrigation Office I Administration Support Branch <ul><ul><li>Project Consideration Group </li></ul></ul><ul><ul><li>Design Group </li></ul></ul><ul><ul><li>Soil Science and Geological Group </li></ul></ul><ul><ul><li>Topographical Survey Branch </li></ul></ul><ul><ul><li>Dam Safety Management Branch </li></ul></ul><ul><ul><li>Engineering Inspection and Analysis Branch </li></ul></ul>Engineering Management Division <ul><ul><li>Water Management and Budget Planning </li></ul></ul><ul><ul><li>Branch </li></ul></ul><ul><ul><li>Water Management Branch </li></ul></ul><ul><ul><li>Improvement and Maintenance Planning </li></ul></ul><ul><ul><li>Branch </li></ul></ul><ul><ul><li>Roads Improvement and Maintenance Branch </li></ul></ul><ul><ul><li>Water Crisis Planning and Management Branch </li></ul></ul>Operation Division Operation and Maintenance Division <ul><ul><li>Construction plan and Budget Branch </li></ul></ul><ul><ul><li>Electrical Pumping Operation Branch </li></ul></ul><ul><ul><li>Natural Water Sources Improvement Branch </li></ul></ul><ul><ul><li>Special Projects Branch . </li></ul></ul>Mechanical Division <ul><ul><li>Mechanical Engineering Branch </li></ul></ul><ul><ul><li>Mechanic Operation Branch </li></ul></ul><ul><ul><li>Earth-Moving Equipment Operation Branch </li></ul></ul><ul><ul><li>Pumping Operation Branch </li></ul></ul><ul><li>Chiang Mai Provincial Irrigation Office </li></ul><ul><ul><li>Engineering Branch </li></ul></ul><ul><ul><li>Water Management and Irrigation System </li></ul></ul><ul><ul><li>Improvement Branch </li></ul></ul><ul><ul><li>Mechanic Branch </li></ul></ul><ul><ul><li>Operation and Maintenance Branch 1-6 </li></ul></ul><ul><li>Lamphun Provincial Irrigation Office </li></ul><ul><ul><li>Engineering Branch </li></ul></ul><ul><ul><li>Water Management and Irrigation System </li></ul></ul><ul><ul><li>Improvement Branch </li></ul></ul><ul><ul><li>Mechanic Branch </li></ul></ul><ul><ul><li>Operation and Maintenance Branch 1-4 </li></ul></ul><ul><li>Mae Hong Son Provincial Irrigation Office </li></ul><ul><ul><li>Engineering Branch </li></ul></ul><ul><ul><li>Water Management and Irrigation System </li></ul></ul><ul><li>Improvement Branch </li></ul><ul><ul><li>Mechanic Branch </li></ul></ul><ul><ul><li>Operation and Maintenance Branch 1-4 </li></ul></ul><ul><li>Mae Tang Operation and Maintenance Project </li></ul><ul><ul><li>Engineering Branch </li></ul></ul><ul><ul><li>Water Management and Irrigation System </li></ul></ul><ul><li>Improvement Branch </li></ul><ul><ul><li>Mechanic Branch </li></ul></ul><ul><ul><li>Operation and Maintenance Branch 1-4 </li></ul></ul><ul><li>Mae Faek – Mae Ngad Operation and Maintenance Project </li></ul><ul><ul><li>Engineering Branch </li></ul></ul><ul><ul><li>Water Management and Irrigation System </li></ul></ul><ul><li>Improvement Branch </li></ul><ul><ul><li>Mechanic Branch </li></ul></ul><ul><ul><li>Operation and Maintenance Branch 1-4 </li></ul></ul><ul><li>Mae Kuang Operation and Maintenance Project </li></ul><ul><ul><li>Engineering Branch </li></ul></ul><ul><ul><li>Water Management and Irrigation System Improvement Branch </li></ul></ul><ul><ul><li>Mechanic Branch </li></ul></ul><ul><ul><li>Operation and Maintenance Branch 1-4 </li></ul></ul><ul><li>Royal Development Study Center </li></ul><ul><li>(Huai Hong Khrai) </li></ul><ul><ul><li>Engineering Management Group </li></ul></ul><ul><ul><li>Operation Coordination Branch </li></ul></ul><ul><li>On-Farm Operation Project </li></ul><ul><ul><li>Engineering Branch </li></ul></ul><ul><ul><li>Construction Group </li></ul></ul><ul><ul><li>Continuing Activity Extension Branch </li></ul></ul><ul><ul><li>Mechanical Operation Group </li></ul></ul><ul><li>Construction Project 1 - 2 </li></ul><ul><ul><li>Engineering Branch </li></ul></ul><ul><ul><li>Construction Group 1-5 </li></ul></ul><ul><ul><li>Mechanical Operation Group </li></ul></ul>
  9. 9. IRRIGATION PROJECTS
  10. 10. CATCHMENT AREA Mae Kuang Reservior Da. = 569 Km 2 Mae Ngad Reservior Da. = 1,281 Km 2 Mae Ping River Da. = 1,600 Km 2 Mae Tang Weir Da. = 1,880 Km 2 Mae Faek weir Da. = 2,881 Km 2
  11. 11. Nov กรมชลประทาน กระทรวงเกษตรและสหกรณ์ Runoff 8,062 MCM. Water Shortage ( Dry season ) 695 MCM. Water Demand 3,715 MCM. Inflow- Water Demand in Upper Ping River Basin Apr May Mar Feb Jan Dec Oct Sep Aug Jul Jun MCM Month
  12. 12. Present and Future Water Demand in Upper Ping Basin Water Quantity ( MCM ) Present Future ( 20 yr. ) 1. Runoff Volume in Upper Ping River Basin 8,062 8,062 2. Water Demand (Needed) 3,715 4,589 - Agriculture 2,950 3,785 - Consumption 94 120 - Industrial & Tourism 16 29 - Ecology 655 655 3. Water Use (Available) 2,79 4 4,589 - Water Supply (Supplied via Irrigation Sys.) 2,281 3,669 - Storage Capacity 739 920 4. Water Shortage 695 - 5. Water Release (Left over from Upper Ping) 5,26 8 3,473
  13. 13. Project (4 Types) No. Storage Capacity Area (rai) 1. Large Scale Project 3 52 8 423 , 0 00 - 3. Small Scale Project 830 105 - 914,233 2. Medium Scale Project 35 106 213 , 44 6 - 4. Pumping Project 83 - 91,321 - Total 780 739 727 ,767 914,233 Present Water Resource Development ( MCM ) Complete Semi-Complete Irrigation Projects @ RID1 Average annual rainfall 1,220.4 mm. Chiang Mai Lamphun
  14. 14. โครงการชลประทานขนาดใหญ่ <ul><li>อ่างเก็บน้ำ จำนวน 2 โครงการ </li></ul><ul><li>ฝายทดน้ำ จำนวน 3 โครงการ </li></ul><ul><li>ความจุเก็บกักน้ำได้ 528 ล้าน ลบ . ม . </li></ul><ul><li>รวมพื้นที่ชลประทาน 467,900 ไร่ </li></ul>Large scale irrigation projects No. of 5 projects <ul><li>2 Large Reservoirs </li></ul><ul><li>3 Weirs </li></ul><ul><li>Storage Capacity 528 MCM . </li></ul><ul><li>Irrigation Area 467,900 rais </li></ul>
  15. 15. <ul><li>Large Scale Reservoir </li></ul><ul><li>Project storages 528 MCM </li></ul><ul><li>Irrigated Areas 67,700 ha </li></ul>
  16. 16. โครงการส่งน้ำและบำรุงรักษาแม่แตง Mae Tang Weir Ping River Lumpang Lumpoon Mae Taeng Project Mae Tang weir is a reinforced concrete structure enduring maximum flow of 24 MCM/sec Irrigated Area 148,000 Rai Chiang Mai City
  17. 17. Irrigated Area 82,000 Rai โครงการส่งน้ำและบำรุงรักษาแม่แฝก - แม่งัด Mae Faek Project Mae Ngad Project Ping River Lumpang Lumpoon The 59 m. tall Mae Ngad dam barricades Mae Ngad stream holding capacity 265 MCM Chiang Mai City
  18. 18. Municipal Water Supply Electricity Generators 4,500 kw x 2 = 9,000 KW Total output approx. 24.5 million kw / year Mae Ngad = The multi-purpose Dam
  19. 19. โครงการส่งน้ำและบำรุงรักษาแม่กวง เขื่อนแม่กวงอุดมธารา Mae Kuang Project Irrigated Area 175,000 Rai Ping River Lumpang Lumpoon Chiang Mai City
  20. 20. Chiang Mai City Lumpang Lumpoon Irrigated Area 48,400 Rai Mae Ping Kao Project
  21. 21. 16 MEDIUM SCALE IRRIGATION PROJECTS IN CHIANG MAI IRRIGATION PROJECT Total Capacity 71.357 MCM Irrigated Area 117,446 Rai อ่างเก็บน้ำแม่ตะไคร้ อ่างเก็บน้ำโป่งจ้อ อ่างเก็บน้ำแม่ตูบ ฝายเหมืองใหม่ อ่างเก็บน้ำแม่ออน อ่างเก็บน้ำแม่โก๊น อ่างเก็บน้ำแม่แหลงหลวง
  22. 22. MEDIUM SCALE IRRIGATION PROJECTS IN LUMPHUN IRRIGATION PROJECT
  23. 23. MEDIUM SCALE IRRIGATION PROJECTS IN MAEHONGSORN IRRIGATION PROJECT
  24. 24. Small Scale Irrigation Projects beneficial areas 95,000 ha Royal Initiative Projects beneficial areas 18,275 ha
  25. 25. Royal Initiative Project จำนวน 307 โครงการ อ่างห้วยกล้า ฝายคงคาใน ฝายทุ่งเริง
  26. 26. Royal Project จำนวน 2 9 ศูนย์ โครงการหลวงแม่สะป๊อก โครงการหลวงแม่โถ โครงการหลวงป่าเมี่ยง โครงการหลวงอ่างขาง
  27. 27. Irrigation Project in Border Village จำนวน 9 โครงการ
  28. 28. People’s Irrigation Project จำนวน 6 โครงการ ฝายท่าวังตาล ฝายท่าศาลา ฝายหนองผึ้ง
  29. 29. Small Scale Irrigation Project จำนวน 265 โครงการ
  30. 30. Dredging Sediment Project จำนวน 414 โครงการ โครงการขุดลอกฯ ห้วยต้นตึง
  31. 31. Farm Pond จำนวน 3,015 แห่ง สระเก็บน้ำหมู่ 1 ตำบลมืดกา อำเภอดอยเต่า สระเก็บน้ำหมู่ 3 บ้านสหกรณ์ อำเภอสันกำแพง สระเก็บน้ำหมู่ 2 ตำบลท่าเดื่อ อำเภอดอยเต่า
  32. 33. . การบริหารจัดการน้ำในอ่างเก็บน้ำขนาดใหญ่และขนาดกลาง (Reservoir Operation) Chiang Mai Lamphun Mae Hong Son Large-Scale Reservoir 1. Mae Ngad Dam 2. Mae Kuang Dam Medium-Scale Reservoir 3. Mae-On Res, 4. Mae Toob Res. 5. Huay Ma Now Res. 6. Pong Jo Res. 7. Mae Ta Krai Res. 8. Mae Gon Res. 9. Mae Jok Luang Res. 10. Huay Dua Res. 11. Mae Lang Luang Res. 12. Sun Nong Res. 13 . Mae Khon res. Medium-Scale Reservoir 1. Mae Thi Res. 2. Mae Teep Res. 3. Mae Sarn Res. 4. Mae Mie Res. Medium-Scale Reservoir 1. Mae Hong Son Reservoir
  33. 34. Mae Ngad – Large Scale Project
  34. 35. Mae Kwung – Large Scale Project
  35. 36. Mae Tang – Large Scale Project
  36. 37. (360 m 3 /s) Chiang Mai City Lampoon Mae Ngad Project Mae Kwang Project อ่างฯแม่ธิ อ่างฯแม่ตีบ อ่างฯแม่สาน เหมืองท่าศาลา เหมืองหนองผึ้ง เหมืองพญาคำ เหมืองปิงห่าง น . แม่คาว อ . สันทราย อ . สารภี อ . เมืองลำพูน อ . ป่าซาง อ . เมืองเชียงใหม่ อ . หางดง อ . สันป่าตอง คลองส่งน้ำ คลองส่งน้ำ น . แม่สะลาบ คลองส่งน้ำ Mae Tang Weir Mae Feak Proj. ฝายท่าศาลา ฝายหนองผึ้ง น . แม่ข่า Tha Wang Tan ฝายชลขันธ์พินิจ ฝายพญาอุต ฝายท่ามะโก๋ ฝายสบร้อง ฝายวังตอง ฝายสบทา P.1 P.67 P.81 P.5 ฝายวังปาน น . แม่ทา อ . เชียงดาว Water Management in Upper-ping Basin ฝายดอยน้อย (800 / 45 m 3 /s) (635 m 3 /s) (190 m 3 /s) (12.35 m 3 /s) (460 m 3 /s) (10 m 3 /s) (120 m 3 /s) (263 MCM) (265 MCM) (440 m 3 /s) (210 m 3 /s) อ่างฯแม่เมย (3.20 m 3 /s) (1 m 3 /s) (1 m 3 /s) (23.8 m 3 /s) (140 m 3 /s) (0.7 m 3 /s) (15 m 3 /s) (15 m 3 /s) นิคม อ . สันกำแพง น . แม่ออน , น . แม่ปูคา น . แม่กวง LMC ฝายแม่ร่องน้อย (0.6 m 3 /s) ( - ลดระดับสันฝาย 1.50 ม . ) ( - ฝายยางสูง 1.50 ม . ยาว 138 ม .) 2 -  1 ม . (1,260 / 650 m 3 /s) (1,550) ฝายหนองสลีก ( บรรเทาอุทกภัย อ . สันกำแพง 75 m 3 /s) (102.4 MCM / 39%) (43.80 MCM / 17%) ( 11 ม 3 / วิ ) ( 18 ม 3 / วิ ) ( 2.4 ม 3 / วิ ) P.87 ( 40 ม 3 / วิ ) ( 74.5 m 3 /s ) (4.5 ล้าน ลบ . ม . ) (10 ล้าน ลบ . ม . ) (16 ล้าน ลบ . ม . ) (3.6 ล้าน ลบ . ม . ) (0.5 m 3 /s) (1.5 m 3 /s) ( 0.85 ม 3 / วิ ) ( 1.3 ม 3 / วิ ) อ . ดอยสะเก็ด อ . แม่แตง โรงสูบน้ำคลองแม่ข่า โรงสูบน้ำสบแม่ข่า 4 - 4 x4 ม . 5 - 4 x5 ม . 3 - 4 x6 ม . ( ปตร . 6 - 12.5 x6 ม . )
  37. 38. Summary Flowchart for Water Resource Management in Upper Ping Basin
  38. 39. Strategic Plans for Water Resources Management Via Infrastructure Constructions
  39. 40. Mae Feak Head Project Rehabilitation
  40. 41. Mae Feak Project System Rehabilitation 1 2 3
  41. 42. Mae Ngad Detail : Divert MCM / Year (26 cms ) Cost 4,871.54 Million Baht Beneficial - Irrigation area increase 40,860 Rais - Serve household and Industrial 49.99 MCM more - Economical stimulation 864.83 Million Baht / yr Mae Kwang Diversion Tunnel Mae Tang ลำน้ำแม่แตง ลำน้ำปิง ลำน้ำแม่งัด Mae Tang – Mae Ngad –Mae Kwang Trans-basins Diversion Project
  42. 43. ประตูระบายน้ำแม่ตะมาน อาคารระบายน้ำ : บานระบายน้ำแบบพับได้ - บานระบายน้ำขนาด 12.50 x 3.50 ม . จำนวน 3 บาน - ช่องระบายทราย ขนาด 0.80 x 1.00 ม . จำนวน 10 ช่อง อาคารระบายทราย : บานระบายแบบโค้ง - ขนาด 2.50 x 3.00 ม . จำนวน 2 ช่อง อาคารรับน้ำ : บานระบายแบบตรง - ขนาด 4.00 x 4.00 ม . จำนวน 1 ช่อง ระยะเวลาในการก่อสร้าง 2 ปี อุโมงค์ส่งน้ำ แม่แตง - แม่งัด - เส้นผ่าศูนย์กลางอุโมงค์ 4.00 ม . - ความยาวอุโมงค์ 25.401 กม . - ปริมาณน้ำผ่านอุโมงค์สูงสุด 28.50 ลบ . ม ./ วินาที ใช้เวลาการก่อสร้าง 4 ปี อุโมงค์ส่งน้ำ แม่งัด – แม่กวง - เส้นผ่าศูนย์กลางอุโมงค์ 5.00 ม . - ความยาวอุโมงค์ 20.933 กม . - ปริมาณน้ำผ่านอุโมงค์สูงสุด 26.00 ลบ . ม ./ วินาที ใช้เวลาการก่อสร้าง 4 ปี
  43. 44. Mae Ping Operation Gate Project
  44. 45. Mae Ping Operation Gate Project 6 Regulating Gates12.50 x 6.50 m . Max Q 1,200 cms Automatically Operated Traditional Lanna Style Design for City Landmark Purpose Fish ladder 3.00m x 270m
  45. 46. รูปด้านหน้า รูปด้านข้าง 9.75 m 9.75 m Mae Ping Operation Gate Project Side View Front View
  46. 47. Flood Warning and Forecast System
  47. 48. รายงานสถานการณ์ทาง Internet ใน Website http://www.hydro-1.com PR with Community through Internet ( To inform the communities about the flood in advance) www.hydro-1.com
  48. 49. Telemetry เวียงแหง พร้าว เชียงดาว ดอยสะเก็ด สันทราย กิ่ง อ . บ้านธิ หางดง เชียงใหม่ ป่าซาง ลำพูน สันกำแพง แม่แตง UP.01 UP.02 UP.04 UP.05 UP.06 UP.08 UP.07 UP.10 UP.09 สารภี เขื่อนแม่กวง เขื่อนแม่งัด MS UP.11 แม่ริม UP.03 UP.12 พายุฝน Upper Ping
  49. 50. Real-time Telemetry System in Upper Ping Basin
  50. 51. ขอขอบคุณทุกท่าน สำนักชลประทานที่ 1 Appreciate Your Attentions

×