Building

286 views

Published on

contact Amanjit Singh
09312221946

Published in: Real Estate
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
286
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
6
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Building

  1. 1. PROFILE OF THE BUILDING <br />
  2. 2. Building facts <br /><ul><li>Prime location NH8
  3. 3. Green Building
  4. 4. Fresh air throughout the building thru the ventilation units attached to the AC’s , cross air ventilated building
  5. 5. Power backup
  6. 6. Four side open building
  7. 7. Terrace anti aircraft light
  8. 8. CCTV Cameras at prime locations
  9. 9. The flooring carpets are anti static carpets
  10. 10. Plantation
  11. 11. Glass Mosaic tiles
  12. 12. Safety glass all through the building </li></li></ul><li>Ground Floor <br />
  13. 13. GROUND floor <br /><ul><li> 3 Cabins
  14. 14. 2 Training Rooms
  15. 15. 1 CCTV Room
  16. 16. 1 Production Hall
  17. 17. 3 Washrooms
  18. 18. 1 Cafeteria </li></li></ul><li>Ground floor <br />Total AC Unit Capacity : 70 tons<br /><ul><li>Reception:5.5 Tons : Voltas
  19. 19. Cafeteria :27 Tons : Carrier and LG
  20. 20. Training Center :9.5 Tons : Carrier
  21. 21. Production Area and Storage Area : 22 Tons : Blue Star
  22. 22. Individual Units : 6 Tons : Carrier and Samsung </li></ul>PANELS<br /><ul><li> 2 Fire Hydrant stations
  23. 23. 1 Notifier Fire control panel
  24. 24. 1 Ground Floor Panel 400 Amperes </li></li></ul><li>First floor <br /><ul><li> 13 Cabin
  25. 25. 26 Cubical
  26. 26. 188 Workstation
  27. 27. 5 Meeting Room
  28. 28. 2 Server Room
  29. 29. 3 Washrooms </li></li></ul><li>First floor <br />AC Units <br /><ul><li>Total AC packaged unit : 68 Tonnes : Voltas
  30. 30. Individual AC units : 12 Tonnes :Diakin</li></ul>Panels : <br /><ul><li> 2 Fire hydrant station
  31. 31. 1 First floor panel 200 amperes</li></li></ul><li>Second floor <br /><ul><li> 22 Cabins
  32. 32. 35 Cubicals
  33. 33. 144 Workstation
  34. 34. 3 Meeting Room
  35. 35. 1 Server Room
  36. 36. 3 Washrooms </li></li></ul><li>Second Floor <br />AC Units ;<br /><ul><li>Total Package Unit : 66 Tons : Voltas
  37. 37. Individual Units : 24.5 Tons: Carrier /Diakin</li></ul>Panels <br /><ul><li> 2 fire hydrant station
  38. 38. MDB UPS panel 125 ampere
  39. 39. Server room control UPS panel 125 ampere
  40. 40. Research and development panel 100 ampere </li></li></ul><li>THIRD FLOOR <br /><ul><li>21 Cabins
  41. 41. 31 Cubicles
  42. 42. 60 Workstations
  43. 43. 1 Meeting Room
  44. 44. 1 Board Room
  45. 45. 1 Auditorium
  46. 46. 1 Server Room
  47. 47. 1 Pantry Directors Area
  48. 48. 3 Washrooms
  49. 49. 2 Director Washroom </li></li></ul><li>Third Floor <br />AC Units : <br /><ul><li>Total Package Unit : 68 tons : Voltas
  50. 50. Individual Units : 23.5 Tons : Diakin /Carrier/Toshiba </li></ul>Panels :<br /><ul><li> 2 Fire hydrant station
  51. 51. Third floor UPS panel :125 ampere
  52. 52. Electrical panel : 200 amperes
  53. 53. Lighting Panel : 125 Amperes </li></li></ul><li>Terrace <br />Panels : <br /><ul><li> 2 Cooling Towers : 165 TR : Case /Asian
  54. 54. 1 Cooling Tower Pump Room
  55. 55. 1 Lift room
  56. 56. 2 Fresh Air Unit
  57. 57. 2 Exhaust fan unit </li></li></ul><li>Outer AREa ( GF ) <br />Panels :<br /><ul><li>HT Meter Room
  58. 58. HT Panel Rooms
  59. 59. STP Plant : 50 KLD
  60. 60. Isolator Panel: 2000 AMPERE
  61. 61. POLE LIGHTS 39
  62. 62. RAMP SHUTTERS -2
  63. 63. PUMP ROOM
  64. 64. DG SETS
  65. 65. DIESEL TANK YARD :40000 KLD</li></li></ul><li>Basement <br /><ul><li>LT PANEL -1 (2000 KVA)
  66. 66. VENTILATION PANEL -1(250 AMPERE)
  67. 67. NEW UPS PANEL -1 (100 AMPERE)
  68. 68. UPS BYPASS CHANGEOVER PANEL -5 (100 AMPERE EACH )
  69. 69. AC PANE L-1(630 AMPERE)
  70. 70. ADDITIONAL AC PANEL – 1(250 AMPERE )
  71. 71. UNIVERSAL TRANSFORMER CONTROL PANEL(RTCC )
  72. 72. CAPACITOR PANEL -1 (400 AMPERES )
  73. 73. BLOWER-2(18.5 KW AND 7.5KW)
  74. 74. FIRE HYDRANT STATION -2
  75. 75. APC UPS -4 (30 KVA ) WITH 32 BATTERIES EACH OF 65 AH
  76. 76. APC UPS -3 (40 KVA ) WITH 64 BATTERIES EACH OF 26 AH</li>

×