Kim Croft Credentials Supply Chain and Materials Managment

897 views

Published on

Kim Croft portfolio of awards, reference letters, training

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
897
On SlideShare
0
From Embeds
0
Number of Embeds
16
Actions
Shares
0
Downloads
17
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • \n
  • Kim Croft Credentials Supply Chain and Materials Managment

    1. 1. Kim Croft: CredentialsAwards, Letters of Reference, Training 1
    2. 2. Kim Croft Supply Chain Management• Kim Croft Materials Management:• Strategic Analytical Solutions for Improved Profitability• Supply Chain Management • Materials Management • Production Planning• Master Scheduling • New Business Process Text Development • Continuous Improvement• Process Re-engineering • Root Cause Analysis • Industrial Design • Budget Management• Project Management • Collaborative Projects • Material Requirements Planning (MRP)• Demand Planning • Inventory Analysis • Team Leadership Kim Croft LinkedIn profile - click here 2
    3. 3. IndexUnder ConstructionMetrics; Sample projectLetters of ReferenceAwards & RecognitionCustomer KudosTraining (incomplete listing)Kim Croft LinkedIn profile - click here 3
    4. 4. Index Material Planning Parts on the Ops Watch List302315 8 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20CHANGE BEGINS MONTHS copyright Kim Croft 4
    5. 5. Index Continuous Improvement - Six SigmaRESULT: ANNUAL SAVINGS OVER $300K LABOR ALONE, INVESTMENT: $25K.Define: Unable to track WIP work orders, unable to locate lost WIPMeasure: Production control Employees spend several hours weekly to statusWIP and locating misplaced materialAnalyze: An automated method of tracking WIP would result in more timeavailable for pro-active planning activities, better inventory control, and lessexcess inventoryImprove: Developed a custom automated system through a collaborative effortwith IT programmers that is easy to use, and is flexible where WIP can belocated from any PC on the networkCONTROL: Reporting developed that can reveal WIP location, travel time, andqueue time from any PC on the network. Also utilized to prioritize material atwork cells and inspection stations. Locates lost material by sending auto-notification to production control as to location when scanned.One example of a successful continuous improvement six sigma project identified, developed, and implemented by Kim Croftcopyright 2011 5 copyright Kim Croft
    6. 6. Index6 copyright Kim Croft
    7. 7. Indexcopyright Kim Croft
    8. 8. Indexcopyright Kim Croft
    9. 9. Index copyright Kim Croft9
    10. 10. 10 copyright Kim Croft
    11. 11. Index11 9 copyright Kim Croft
    12. 12. IndexAccomplished during a period of continuous price increases in steel nationwide. 12 copyright Kim Croft
    13. 13. Index13 copyright Kim Croft
    14. 14. Index14 copyright Kim Croft
    15. 15. Index15 copyright Kim Croft
    16. 16. Index16 copyright Kim Croft
    17. 17. Index GPA 3.9617 copyright Kim Croft
    18. 18. Index18 copyright Kim Croft
    19. 19. Index19 copyright Kim Croft
    20. 20. Index20 copyright Kim Croft

    ×