20130108 kaptur lg

362 views

Published on

Welcome presentation given by Leigh Garrett for the KAPTUR Steering Group meeting, 8th January 2013.

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
362
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

20130108 kaptur lg

  1. 1. KAPTUR PROJECT STEERING GROUP 8TH JANUARY 2013 LONDONVADS : GSA : GOLDSMITHS : UAL : UCA : JISC
  2. 2. Agenda• Welcome and introductions• Project update• Partner reports• Technical report and demonstration• Sustainability• Project conclusion• Plenary• Any other business KAPTUR STEERING GROUP : 8TH JANUARY : LONDON VADS : GSA : GOLDSMITHS : UAL : UCA : JISC
  3. 3. Project OverviewOBJECTIVES• To investigate the nature of research data in the visual arts• To consider the application of technology to support collection, discoverability, usage and preservation of research data in the area• To review appropriate policies, procedures and systems within the four partner institutions• To develop case studies and showcase good practice to the wider higher education sector KAPTUR STEERING GROUP : 8TH JANUARY : LONDON VADS : GSA : GOLDSMITHS : UAL : UCA : JISC
  4. 4. Project OverviewBACKGROUND• Research outputs are varied and complex in the visual arts• Little is known about the state of research data in the visual arts• None of the specialist arts institutions have research data management policies or infrastructure KAPTUR STEERING GROUP : 8TH JANUARY : LONDON VADS : GSA : GOLDSMITHS : UAL : UCA : JISC
  5. 5. Project OverviewMETHOD• Environmental analysis• User requirement, systems evaluation and piloting• Policy formation• Toolkits and training materials• Sustainability• Dissemination KAPTUR STEERING GROUP : 8TH JANUARY : LONDON VADS : GSA : GOLDSMITHS : UAL : UCA : JISC
  6. 6. Project DirectionUSER REQUIREMENT, SYSTEMS EVALUATION AND PILOTING• User requirement• Systems evaluation• Pilot research data management system• Deadline: October 2012• Partner institution adoption KAPTUR STEERING GROUP : 8TH JANUARY : LONDON VADS : GSA : GOLDSMITHS : UAL : UCA : JISC
  7. 7. Project DirectionPOLICY FORMATION• Partner institutional working groups established• Recommendations made to respective Research Committees• High level strategy• Deadline: December 2012 KAPTUR STEERING GROUP : 8TH JANUARY : LONDON VADS : GSA : GOLDSMITHS : UAL : UCA : JISC
  8. 8. Project DirectionCAPACITY BUILDING• Internal dissemination • Creation of toolkits and training materials for researchers and professional support staff• External dissemination • Partner institutional case studies• Project conference• Deadline: March 2013 KAPTUR STEERING GROUP : 8TH JANUARY : LONDON VADS : GSA : GOLDSMITHS : UAL : UCA : JISC
  9. 9. Project DirectionSUSTAINABILITY• Impact• Benefits• Cost model• Deadline: March 2013 KAPTUR STEERING GROUP : 8TH JANUARY : LONDON VADS : GSA : GOLDSMITHS : UAL : UCA : JISC
  10. 10. KAPTUR PROJECT STEERING GROUP 8TH JANUARY 2013 LONDONVADS : GSA : GOLDSMITHS : UAL : UCA : JISC

×