Project management

2,115 views

Published on

project about the project management and include PLC.

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
2,115
On SlideShare
0
From Embeds
0
Number of Embeds
4
Actions
Shares
0
Downloads
41
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Project management

  1. 1.
  2. 2. SOLAR WATER PUMP<br />INSTALLATION OF SOLAR WATER PUMP IN SINDH<br /> A PROJECT OF EBR ENERGY(PVT)PAKISTAN<br /> <br />
  3. 3. GROUP MEMBER<br /><ul><li>HAMZA SHAUKAT </li></ul>I.A.S DEPARTMENT<br />PUNJAB UNIVERSITY LAHORE<br /><ul><li>WWW.HAMZA20.MAGIX.NET</li></li></ul><li>TABLE OF CONTENT<br /><ul><li>COMPANY PROFILE
  4. 4. SERVICES
  5. 5. INTRODUCTION OF PROJECT
  6. 6. TYPES OF PUMP
  7. 7. FUNCTIONING OF SOLAR WATER PUMP
  8. 8. COMPARISION BETWEEN DIESEL AND SOLAR PUMP
  9. 9. PROJECT OVER VIEW
  10. 10. PROJECT LIFE CYCLE
  11. 11. CONCLUSION & RECOMMENDATION</li></li></ul><li>COMPANY PROFILE<br /><ul><li> EBR energy Pakistan (Pvt) limited is a leading renewable energy (RE) company focusing on solar PV, solar thermal and wind energy solutions. EBR energy has already established itself as one of the leading firms in the renewable energy field .
  12. 12. EBR energy we're working hard to provide alternative</li></ul>energy solutions to Pakistan's homes and businesses<br /> every day. Our quality products and unmatched service <br />have made us the alternative energy leader for homes,<br /> businesses and government agencies.<br /><ul><li> No matter what the size of your project, we deliver</li></ul> equipment tailored to your power and cost requirements.<br /><ul><li> EBR energy has a dedicated team of professional licensed engineers and NABCEP (north American board of certified engineer practitioners) certified system installers to design and deliver systems that not only meet regulatory requirements but also meet customers' expectations.</li></li></ul><li>COMPANY VISION<br />Provide Pakistani consumer with alternate source of<br /> electricity generation solution at a cost-effective price.<br />COMPANY MISSION<br />Is to "provide alternative sources of electricity at cost effective prices" to all consumer sectors with a special focus on commercial, residential and rural communities. <br />COMPANY COMMITMENT:<br />We provide services from the equity all the way to commissioning of the system. All services performed by EBR energy Pakistan are 100% guaranteed .<br />
  13. 13. EBR Energy has expertise in the following areas:<br /><ul><li>Grid-Tied PV Systems
  14. 14. Off-Grid (remote) Energy System
  15. 15. Solar Thermal Systems
  16. 16. Micro Wind Turbine Systems
  17. 17. System Design
  18. 18. System Installation </li></ul>SERVICES<br /><ul><li>Solar Photovoltaic (PV)
  19. 19. Solar water pumps
  20. 20. Feasibility study
  21. 21. Detailed engineering designing
  22. 22. Procurement
  23. 23. Logistics
  24. 24. Installations
  25. 25. Commissioning
  26. 26. Monitoring</li></li></ul><li>INTRODUCTION OF PROJECT<br />
  27. 27. SOLAR WATER PUMP<br />If you need to supply water beyond the reach of power lines, then solar power can solve the problem.<br />Photovoltaic powered pumps provide a welcome alternative to fuel-burning engines, windmills, and hand pumps. Thousands of solar pumps are working throughout the world. <br />They produce best during sunny weather, when the need for water is greatest. Photovoltaic (PV) modules (i.e. Solar electric panels) produce electricity from sunlight using silicon cells, with no moving parts. <br />They have been mass-produced since 1979. They are so reliable that most manufacturers give a 20-year warranty, and a life expectancy beyond 30 years. They work well in cold or hot weather.<br />
  28. 28. USES OF SWP<br /><ul><li>Domestic Water: 
  29. 29. Solar pumps are used for private </li></ul>homes, villages, medical clinics, etc. A water pump can<br /> be powered by its own PV array, or by a main system<br /> that powers lights and appliances<br /><ul><li>Livestock Watering:</li></ul>It can also be use for watering of livestock in those areas <br />where there is no supply of power and maintenance cost<br /> is higher.<br /><ul><li>Irrigation: </li></ul>Solar pumps are used on small farms, orchards and gardens. <br />It is most economical to power the pump directly from the<br /> PV array (without battery), store water in a tank, and then <br />distribute it by gravity flow. <br />
  30. 30. SIGNIFICANCE<br /><ul><li>Save electricity.
  31. 31. Environment friendly water pumping.
  32. 32. Reliable and less maintenance cost.
  33. 33. Efficient and cheaper than other way of </li></ul>pumping water.<br /><ul><li>Helps to pump water in those areas where maintenance cost is higher and no supply of electricity.</li></li></ul><li>Pump Types<br />There is a large variety of solar water pump types in the market. The most common types of mechanisms are <br /><ul><li>Helical rotor (mono)
  34. 34. Centrifugal
  35. 35. Piston or diaphragm
  36. 36. Our project includes only the installation of helical rotor pump so we discuss only this.</li></li></ul><li>FUNCTIONING OF HELICAL ROTOR SOLAR PUMPS:<br /><ul><li>The pump is mounted on a submersible motor and is submerged below the water level in the borehole. Electricity is provided by a solar panel array installed within a close distance from the borehole. </li></li></ul><li>COMPARISON BETWEEN SOLAR WATER PUMP AND DIESEL PUMP<br />
  37. 37. PROJECT OVERVIEW<br /><ul><li>The project comprises of installation of solar water pump in the Mitthi area of Sindh. This is done by one of the renowned company of Pakistan solar sector EBR energy. The whole project includes the installation of three solar water pumps and it is divided into three phase. In every phase there is an installation of solar water pump.</li></li></ul><li>SCOPE OF THE PROJECT<br />
  38. 38. PROJECT OBJECTIVES<br />
  39. 39. INFORMATION GATHERING<br />Information is gather from the EBR energy secondary source of information gathering is Lorentz Company of Germany who provide solar product to EBR.<br /> NEED OF THE HOUR<br />
  40. 40. PROJECT LIFE CYCLE<br />
  41. 41. PROJECT LIFE CYCLE<br />Planning<br />Delivery<br />
  42. 42. DEFINING<br />After the preparation of feasibility report project management team decides how to accomplish the project efficiently and effectively<br />Goals<br />Specification<br />Tasks<br />Responsibilities<br />Teams<br />
  43. 43. Goals<br />
  44. 44. SPECIFICATIONS<br />
  45. 45. Tasks<br />
  46. 46. TEAM AND RESPONSIBILITIES<br />
  47. 47. Planning<br />Schedules<br />Budget<br />Resources<br />Risks<br />Staffing<br />
  48. 48. Budgets<br />Total budget is of 10 lac rupees<br />
  49. 49. Resources<br />Financial resources<br />Non-financial resources<br />Technical resources<br />
  50. 50. Risks<br />Financial risk (unavailability of finance on time)<br />Arrival of equipment on time from Germany<br />Clearance from the customs department on time<br />Safety risk<br />Staffing<br />
  51. 51. Execution<br />
  52. 52. Delivery<br />Quality<br />Train customer<br />Specification<br />Transfer documents<br />Use<br />Release resources<br />Lesson learned<br />
  53. 53. CONCLUSION<br /><ul><li>The first stage is completed according to plan and first solar water pump is installed on scheduled.
  54. 54. There is good communication between different level of employee and department which is necessary for the on time project completion.
  55. 55. The quality promises are made according to commitment.
  56. 56. The company provides maximum facility to the employees at work site.</li></li></ul><li>SUGGESTIONS<br /><ul><li>The company must ensure the safety of employees in the work field.
  57. 57. Company must give relaxation time after the completion of each project.
  58. 58. Company must make special arrangement for the safe transportation of sensitive equipment to work place.</li></li></ul><li>VIDEO<br />
  59. 59.
  60. 60. THANK YOU<br />

×