Justmeans power point

264 views

Published on

Justmeans power point

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
264
On SlideShare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Justmeans power point

  1. 1. The sent count is displayed wrong. The Newsletter was sent to only 42 contacts only.<br />
  2. 2. These two email ids are in Don not contact email list still there are getting displayed in the original list.<br />
  3. 3. There is no count getting displayed if the user download CSV and PDF.<br />
  4. 4. The date selected is Jan 3 to Feb 3 but the graph start date is from Jan 4 and in the opens graph the date is displayed from Feb 2.<br />
  5. 5. The date format should be matched <br />
  6. 6. There is change in the email sent count if the user change the date duration.<br />
  7. 7. The last name is the compulsory field but it is not getting displayed if the user click on the edit user info .<br />
  8. 8. The error message is displayed twice.<br />
  9. 9. If the user click on the dot the information of the contacts is displayed below the user have to scroll to view the information. The page should get auto scrolled. <br />
  10. 10. Hand pointer not getting displayed to the sort option.<br />
  11. 11. The start and the end date both are missing.<br />
  12. 12. There is a design mess up <br />
  13. 13. Editor not working on IE7<br />
  14. 14. IE7 design mess up.<br />
  15. 15. The click and thecounts are not matching with the send grid count.<br />
  16. 16. If the user click on we have our HTML option the edit is not getting displayed immediately. <br />
  17. 17. Ie-7 Issue<br />If the user create a newsletter on IE -7 the schedule date automatically getting set .<br />
  18. 18. Create New option not working on IE 7. <br />

×