High tension wire park design proposal

401 views

Published on

High tension wire park proposal, neelum block, d.c colony, gujranwala Cantt, Pakistan
0312-505728

Published in: Design, Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
401
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

High tension wire park design proposal

  1. 1. Design Proposal Planning
  2. 2. High Tension Wire Park (existing status)
  3. 3. Design Proposal
  4. 4. Bushes to be incorporated
  5. 5. PROCEDURE  Designing  Approval  Demarcation and layout at site  Execution plan (Calculation and purchase of materials)  Construction and Installation
  6. 6. PLANNING HIGH TENSION WIRE PARK            Labor(10),Plumber (1), Mason (1)- will be mustered through existing resources Water point & quantity of water available (checked) Irrigation (purchase of pipes- estimate being worked out by engineer branch) Benches (50, under construction at lahore-1 week time) Bhul soil & soil ammendments- 10 trolleys will be purchased amounting Rs 20,000(Purchase -& Filling) Cement, gravel, sand, boulders- to be estimated in collaboration with Engineering Dept (Purchase) Concrete slabs, bricks- to be estimated in collaboration with Engineering Dept (purchase, installation, marking) Plants/ shrubs - will be purchased in March 1st week amounting Rs 50,000 (remaining required will be prepared in nursery this year). Flowers pansy, petunia, antrhinum will be transplanted in mid feb and will last till May(available) Digging for plantation- after completion of Hardscape area Purchase brush cutters (5) tentative cost (100000)
  7. 7. On going maintenance operations                Trees and shrubs pruning Trees basins Mowing Palms pruning Pesticide applications Termiticide applications Edging Weeding Production of seasonal flowers Wild growth trimming Making of flowers beds Limestone application Irrigation Nursery and tunnel farm operations Rotary and disc tractor operations
  8. 8. Main Cantt Gate Entrance
  9. 9. Neelum Block Tecoma
  10. 10. Benches Incorporation
  11. 11. EXISTING VALUE ADDITION TO HORTICULTURE
  12. 12. Agro Area
  13. 13. Nursery to Tunnel
  14. 14. Tunnel Offseason
  15. 15. Parks Horticulture Maintenance
  16. 16. Improving Horticulture
  17. 17. Designed Landscaped Horticulture
  18. 18. Main G.T Road Gate Entrance
  19. 19. Main G.T Road Gate Entrance
  20. 20. END  PRESENTATION

×