The Project Managemet
Triangle (Triple
Constraint)
Creating a Project Priority
Matrix
J Scott Christianson
The PM Triangle
Time Cost
Scope
The PM Triangle
Time Cost
Scope
Project
Priority
Matrix
Accept Constrain Enhance
Time
Cost
Scope
Enhance = Better
Better = More Features,
Better Specs
Project
Priority
Matrix
Accept Constrain Enhance
Time
Cost
Scope
Project
Priority
Matrix
Accept Constrain Enhance
Time
Cost
Scope
Enhance = Better
Better = Lower Costs
Project
Priority
Matrix
Accept Constrain Enhance
Time
Cost
Scope
Enhance = Better
Better = Less Time
The PM Triangle
Time Cost
Scope
Upcoming SlideShare
Loading in …5
×

Understanding The Project Management Triangle (or Triple Constraint)

1,798 views

Published on

The interrelationship between Time, Scope, and Cost. From Project Management Fundamentals, a new type of textbook designed to be: granular, easy to use with a "flipped" classroom approach, and designed for electronic distribution on iPads, kindle readers, and PCs/Mac. Find out more at http://pmf.education/

Published in: Engineering
  • I also want to include some points which I have on my blog. These factors may help you in understanding the Constraints of Project Management Triangle..https://blog.taskque.com/constraints-project-management-triangle/
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here

Understanding The Project Management Triangle (or Triple Constraint)

  1. 1. The Project Managemet Triangle (Triple Constraint) Creating a Project Priority Matrix J Scott Christianson
  2. 2. The PM Triangle Time Cost Scope
  3. 3. The PM Triangle Time Cost Scope
  4. 4. Project Priority Matrix Accept Constrain Enhance Time Cost Scope Enhance = Better Better = More Features, Better Specs
  5. 5. Project Priority Matrix Accept Constrain Enhance Time Cost Scope
  6. 6. Project Priority Matrix Accept Constrain Enhance Time Cost Scope Enhance = Better Better = Lower Costs
  7. 7. Project Priority Matrix Accept Constrain Enhance Time Cost Scope Enhance = Better Better = Less Time
  8. 8. The PM Triangle Time Cost Scope

×