Arley Hall -!
Technical Manager - Jordan Simpson
Assistant Technical Manager - Joel Murray (Drawing Room) & Jordan
Potsig-...
!
• Colouring!
- You will add any gel needed and preset the none controlled LED lights to their set
colours.!

• Focusing!...
Friday (TBC)!

Sound & Lighting!

!

- Get Out!
• On Friday you will arrive at Arley with the technical team to disassembl...
Upcoming SlideShare
Loading in …5
×

Get in jobs arley hall

197 views

Published on

Published in: Spiritual
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
197
On SlideShare
0
From Embeds
0
Number of Embeds
47
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Get in jobs arley hall

  1. 1. Arley Hall -! Technical Manager - Jordan Simpson Assistant Technical Manager - Joel Murray (Drawing Room) & Jordan Potsig-Simpson (The Gallery) Wednesday! Sound! - Get In! • You will be unloading the equipment from the van into the venue and splitting it in to the two performance spaces.! - Fit Up! • Rigging! - You will be rigging all the sound equipment in each space this includes cabling in all the sound equipment and power cables to ensure we get a clean sound. ! - You will also be in charge of setting up all other sound equipment on the show this includes anything that is needed for the interval.! - Operating! • During the performance and any rehearsals you will be operating the desk also using Qlab to fire each dance soundtrack. You will also ensure that all sound equipment is safely set up and correctly working. ! ! Lighting! ! - Get In! • You will be unloading the equipment from the van into the venue and splitting it in to the two performance spaces.! - Fit Up! • Rigging! - You will rig all the lights within the two spaces, following the lighting plot. This also includes running in cable (power) to each light and ensuring they are working. ! ! 1
  2. 2. ! • Colouring! - You will add any gel needed and preset the none controlled LED lights to their set colours.! • Focusing! - You will focus the lights to the specific areas of the stage, you will do this by following the focus notes given with your lighting plot.! • Plotting (Set Levels) ! - After it is all set up we will need to set the levels of lighting for an audience state and show state.! ! Thursday! Sound! - Systems Check! • You will arrive for your call time and upon arrival you will power up all the equipment and ensure it is all set up for the night ahead. This includes that it will be set up safely and correctly. ! ! - Operating! • During the performance and any rehearsals you will be operating the desk also using Qlab to fire each dance soundtrack. You will also ensure that all sound equipment is safely set up and correctly working.! ! Lighting! ! - Systems Check! • You will arrive for your call time and upon arrival you will power up all the equipment and ensure it is all set up for the night ahead. This includes that it will be set up safely and correctly. ! ! ! ! 2
  3. 3. Friday (TBC)! Sound & Lighting! ! - Get Out! • On Friday you will arrive at Arley with the technical team to disassemble the equipment and pack it away ready for transport back to college. A big part of this is ensuring we have all our equipment and that we leave the venue the way we found it. ! 3

×