  1. 1. CHAPTER II MEDCO SINGA CPP DESCRIPTION  2.1. OPERATIONS and PROCESS  LNG  processing  facility  Singa  Central  Processing  CPP  is  the  operating  phase  of  the  separation  and purification of natural gas from four (4) existing wells in field. STAGEs of processing operations of gas flow from the well done aims to meet the specifications of the desired gas by Perusahaan Gas Negara (PGN) unit area of South Sumatra. Production capacity at Singa Field CPP each well by 30 MMSCFD.    1. the Gas processing Unit Singa CPP consists of:  a. Gas Gathering System,  b. Separation System  c. Acid Gas Removal System  d. Dehydration Unit System,  e. Thermal Unit Oxidasi,  f. Sales Gas Pipeline and Pagardewa Receiving Facilities   2. Supporting Utilities Unit consisting of:  g. the Thermal Fluid System,  h. Closed Drain System.   i. Water Treatment Unit * Fire Water,  j. Produced Water/Disposal  k. Unit Power generators, Diesel Fuel System   Specification of gas supplied from wells and processed at the Processing Unit based on gas composition of Singa CPP Wells. is as follows: Pressure psig 1270Temperature F 250ComponentMethane (% mol) 61.20Ethane (% moll) 0.17
  2. 2. Propane (% mol) 0.01i-Butane (% mol) 0.01CO2 (% vol) 38.41N2 (% mol) 0.03H2S (% mol) 0.035H2O (% mol) -Molar Flow93MMSCFD(DryBasis) HPCaseTabel-1 Gas Supplied Specification2.2 Specifications Gas Products‐Gas products from Singa CPP sent to Surrender Station Pagardewa must meet specifications request buyer, in this case the Perusahaan Gas Negara (PGN). The flow of gas products received by PGN through terminal facilities at Pagardewa acceptance is as follows:  Pressure psig 1050Temperature F 98.5HC dew Point,max. pada1050psigoF 55Methane %-mol 96.2693Ethane %-mol 0.2778Propane %-mol 0.0165i-Butane %-mol 0.0165CO2 %-vol 4N2, max. %-mol 5H2S, max. ppm-vol 4H2O Lb/MMSCF 8
  3. 3. Molar Flow50MMSCFDHP Case Sources of gas well production comes from four well with the amount of 116.8 MMSCFD at a temperature of  250  °  F  and  375  psig  pressure  with  specification  as  aforesaid.  Each  of  the  well  done  analysis  of composition and condensate content periodically, alternating for 4 hours with Test Separator. The Gas produced from the well production is that the corrosive gas elements due to its high content of CO2. Of the four streams of gas wells walked into the gathering system or system of manifold. There are 3 manifold or header for which the supply of gas flow from the well came in, the first a header/manifold blowdown serves to transfer or release pressure in the system when the primary process occurs the excesses of pressure or problems on the gas plant. The System is equipped with a blowdown valve (BDV) to cope with emergencies.  the  BDV  on  blowdown  line  will  open  automatically  and  siphon  the  gas  to  the  Flare KNOCKOUT Drum, so on gas flow to the Flares, while the shutdown valve (SDV) on line main process will close so that no gas was flowing into the gas plant. Second is the manifold/header for on‐site sampling routine. The Gas flows into the separation tank test 31‐MBD‐102 after through the inlet separator 31‐MBD‐127 and water cooler blower 31‐201. Manifold/header to‐3 or called with production manifold, here also  passed  inlet  gas  flow  separator  tank  31‐MBD‐127,  water  cooler  blower  31‐201  and  production separator. The inlet separator 31‐MBD‐126 and 31‐MBD‐109, flushing occurs due to the high‐pressure flow of gas towards lower pressure causing the liquid phase separation occurs in the gas phase. Phase liquid in the gas so we refer to as condensate, containing heavy hydrocarbon and water. The condensate is  accommodated  in  the  inlet  separator  31‐MBD‐127,  test  separator  31‐MBD‐102  and  production separator 31‐MBD‐101 each vessel have a level controller for controlling the level/flow unit condensate Produced Water Disposal System. The gas Separation Unit output feedback to CO2 Removal with the condition of the process: Pressure 1235 psig 1055 psigTemperature 119.3 oF 119.3 oFComponent % mole % moleMethane 61.1923 61.1788Ethane 0.1700 0.1699Propane 0.0100 0.0100i-Butane 0.0100 0.0100CO2 38.2936 38.2928N2 0.0300 0.0300H2S 0.0346 0.0346H2O 0.2595 0.2739Standard GasFlow93MMSCFDHP Case90MMSCFDLP Case 
  4. 4. 2.3 CO2 Removal Unit and Membrane  Acid Gas Removal Unit (AGRU) consists of the Amine unit and Membrane units that operate in parallel. The function of this unit in goal to lower the concentration of CO2 and H2S in gas flow feed. The content of CO2 and H2S in gas feed, each about 38% and 0.03% mole. As the desired gas flow product has content of CO2 and H2S out AGRU respectively 4% mole maximum and 4 ppmv.   Feed the gas into the system through the gas filter AGRU separator 35‐MAJ‐103 which filter out particles of solids > 10 micron.  Gas flow exit gas filter separator part towards the membrane unit and amine units. 1. Absorber (35‐MAF‐104)  on the Amine unit, CO2 and H2S in the flow of acid gas (sour gas) absorbed by amine solution through two STAGEs, namely through the lean amine stream of spring and the lean amine.  The flow of gas from the Gas Filter (35‐JANG‐103) enters from the bottom of the absorber Tower (35‐MAF‐104) in 1194 psig and flows into the 118oF meliwati 4 STAGE tower over the bed, packing the absorber is going with the flow of gas between the contact spring lean and lean amin in opposite  direction  (counter  current).  CO2  and  H2S  is  absorbed  and  react  chemically  with  a solution of methyldiethanolamine (aMDEA).  Gas flow out of the top of the Tower the absorber (sweet gas) into the Sweet Gas KO drums 35‐MBD‐109 with van plate (pack) on top of it with the size of the diameter of 10 glow aims to prevent dew bubble liquid amine/MDEA (losses) carried by the gas flow. Out of amine loop system, due to the flow of sweet gas is saturated with water then the need to separate the content of water in a stream of sweet gas.  2. Amine System  Solution out of the base of the absorber is called Rich amine. Flows out of the base of the column to the Amine Flash Column 35‐MBF‐105.  Flow rate set by the level controller on the basis of the absorber  opens  and  closes  a  control  valve  35‐LV‐104  to  keep  high  fluid  (level)  of  rich  amine constant.  Rich amine on the basis of flash column in the into two streams, 85% of the total stream flow into the Semi Lean Pumps 35‐PBA‐331A/B/C and 15% goes to Rich Pumps 35‐PBA‐333A/b. Rich amine Solution of Flash Column on 13 psig and 168 0F, flows into the Lean/Rich Amine Exchangers 35‐HZZ‐204 through Rich Pump 35‐PBA‐333A/B and in the heat to temperature 218 0F. The exchangers are used is the type of plate frames. The flow of rich amine into the Amine Regenerator 35‐NAF‐107 the top column after pressure was lowered from 30 to 20 psig with no flow valve 35‐FV‐714. This column ran on the top column pressure psig 12 and 14 psig pressure at the base of the column, liquid accumulated inside the accumulator tray Amine Regenerator flows into Reboiler Amine 35‐HBC‐205.  In the reboiler, liquid heated with hot oil.  Part of the liquid evaporates. Steam coming out from the top of reboiler in regenerator base and headed out of the regenerator.     The Liquid overflow through the top of the weir is a solution of acid gas content with lean to be grilled more on TOX and Flare. The flow of liquid out of the boiler flowing back gravity to the regenerator.   Reboiler uses hot oil as a heating source. The heat entered the reboiler set with control 35‐FV‐716 on hot oil line.  Incoming heat controlled by setting the set point  flow  controler.  Hot  lean  amine  regenerator  flows  out  of  the  base  into  the  lean  Amine Exchange through the Lean side Booster Pumps 35‐PBA‐337A/B in which heat is exchanged with the cold rich amine from the flash column. Lean amine in chill temperature to 125 0F with Lean Cooler 35‐HAL‐202. Lean amine has been in the refrigerator through the lean Amine cooler then headed into the Absorber 35‐MAF‐104.  Before entering the absorber, through 35‐FIC‐712 10% lean amine from Booster Pumps are intended to the Amine Particulate filter‐35‐JANG‐108, 40% 
  5. 5. of the flow of the lean amine in transferred to the Amine Charcoal Filter 35‐JANG‐109 and Amine Particulate After filter‐35‐JANG‐111 to take contaminant particles and later transferred to both Amine Absorber using pump 35‐PBA‐334A/B.  3. Acid Gas System  Acid gas out of the flash column on 12 psig and 161 oF and cooled with condenser 35‐HAL‐203 to temperature 140 oF.  The flow out of the condenser is a mixture of water and acid, into the accumulator 30‐MBD‐109 which served as a gas‐liquid separator.  Acid gas passing through the accumulator  to  the  Thermal  Oxidizer  (T‐Ox).    The  water  that  goes  into  the  bottom  of  the accumulator flow Flash Column using a reflux pump 35‐PBA‐332A/B.   Acid gas is burned inside the chimney Thermal Oxidizer before safely and in accordance with the gas quality emissions government regulation role to be released into the atmosphere through the vent stack.  A. Antifoam Injection System  Antifoam Injection System was installed to minimize Antifoam injection of foam (foam) in the amine system. Flow injection antifoam are:  • Suction of the Reflux Pumps (35‐PBA‐332A/B)  • Suction of Rich Pumps (35‐PBA‐333A/B)  • Suction of Lean Pumps (35‐PBA‐334A/B)   B. Membrane Unit  STAGE  I  Membrane  Pre  Treatment  System  of  gas  filter  Gas  Feed  45  MILLION  towards  the membrane unit and the rest flows to the amine unit.  The Feed gas at 1230 psig and 119 0F entered the tube side of the Gas/Gas Exchanger 35‐HBG‐281 in the chill to the temperature of the gas residue 88 oF Membrane Skid Package STAGE I.  A Gas has on the chill in the First STAGE Filter Coalescer 35‐MAJ‐175 to eliminate the water and the condensed hydrocarbons.  Vapor at 1223 psig and 87oF streamed to the First STAGE Electrical Heater 35‐NAP‐681 to raise the temperature to 109 oF.  The Feed gas is then transferred to the First STAGE Guard bed 35‐MBA‐182 and First STAGE Particle Filter 35‐JANG‐183 for the first.  B.1. STAGE I Membrane Skid Package Each membrane is made up of four skids of bank with 7 pieces  of  tube,  membrane  tube  has  four  nozzle:  A  nozzle  the  inlet  feed‐gas.  ‐One  nozzle  for residual gas outlet. ‐Two nozzle to permeate outlet gas. Separex membrane elements made from cellulose acetat which has two layers: the thick micro porous layer and a thin active layer on top of the micro porous layer. The Feed gas into the tube membrane and distributed into membrane meliwati high pressure channel spacer. Along the way the gas inside the tube membrane, CO2, H2S, and other materials which are highly permeable to quickly penetrate the membrane to reach into a permeate channel spacer. Components permeate this move with spiral patterns in a tube to permeate tube. Components with  such a small permeable  methane power missed in high pressure channel spacer next element flows into or out of the membrane tube, go to residual header. The flow of incoming feedback flow freely from the element to the element on the eve of the U‐cup seal installed in upstream side of each element. Each tip out the covered with epoxy membrane elements.  The Feed gas enters Membrane Skid Package STAGE I in 1210 psig and 109oF. Unit membrane lowers CO2 and H2S from the gas feed 38.4 mole% down to 4% mole and H2S 346 ppm‐v down to 18 ppm‐v, each producing gas 24.7 MMSCFD. Then the gas is heated by Gas/Gas Exchanger 35‐HBG‐281 up to 111 oF.  Due to the high content of H2S is still high, mounted 
  6. 6. two H2S scavenger units 35‐MBA‐187A/B to reduce the content of H2S below 4 ppm‐v to fit the sales gas specification before it is combined with outlet flow of gas Dehydration Unit.  2.4 Dehydration Unit (DHU)  Dehydration Unit (DHU) of sweet gas from the Amine Absorber is saturated with water equilibrium. Then on the next process aimed at making the content of the water in the stream of sweet gas. Dehydration unit used a solution of Triethylene glycol (TEG) as absorben to absorb water.  This Unit consists of two parts, dehydration and regeneration.  a. TEG Contactor 36‐MAF‐112 gas dehydration Process feed takes place in counter current in the Glycol Contactor between lean TEG with high pressure gas feed. Gas flow which is rich in moisture content (wet gas) through a series of internal part a mist pad on top to prevent contactor glycol loss.  Gas with a moisture content of smaller 8 lb/MMSCFD later in the chill by lean TEG up to temperature in contact through 25oF the Gas Glycol Heat Exchanger 36‐HBG‐206.  Rich TEG 93.72% wt in 1183 psig out through the bottom TEG contactor, then in flash to 85 psig pressure and flow to the Glycol Still Column 36‐HBA‐209.  b. TEG Regeneration System Rich TEG 93.72% wt on 1183 psig out through the bottom Glycol Contactor, flash up to 85 psig pressure and flow to the Glycol Flash Separator 36‐MBD‐109 via level control 36‐LV‐112A. A large part of hydrocarbons is not dissolved and sour gas from the liquid in the flash TEG into flash drum.  Rich TEG (containing water) from the flash drum into two‐STAGE filter system. TEG Particulate Filter 36‐JANG‐116 take the particles larger than 5 microns, and heavy hydrocarbons not dissolved and organic contaminant in the Carbon Filter TEG take on 36‐JANG‐117.  Clean, rich TEG then flows into the Hot Glycol/Glycol Exchanger 36‐HBG‐207A. Rich TEG heated to temperature 329 ° F via the exchange of a hot, lean TEG of Glycol Reboiler Surge Tank 36‐MBD‐109 and then into the low pressure still column 36‐HBA‐209. The flow of rich TEG entry and flow down in the TEG still column, a number of hydrocarbons in water and evaporating of glycol with heat still column packing.TEG into reboiler is heated under a temperature of boiling glycol. Lean TEG on 385 ° F flowing towards a surge vessel, the liquid level is maintained by using a weir in the reboiler, TEG then flow by the gravity of the reboiler flow through the shell side Hot Glycol/Glycol exchanger 36‐HBG‐207A and Cold Glycol/Glycol Exchanger  36‐HBG‐207B,  cooled  to  170  °  F  by  interchanging  with  the  rich  TEG.    Lean  TEG  out  heat exchangers  and  gravity  flow  toward  Lean  TEG  Pumps  36‐PBA‐337A/b.  Lean  TEG  then  dipompakan Gas/Glycol Exchanger 36‐HBG206 and cooled down to 138.4 ° by exchanging heat with effluent dry gas from the TEG Contactor. Cool lean TEG (98.83% wt‐TEG) and then flows into the tray top contactor.  2.4 Thermal Oxidizer (T‐Ox)  Waste gas from the permeate Membrane Units and acid gas from the Amine Unit burned (oxidation) first before released into the atmosphere. Thermal Oxidizers function to burn exhaust gases and absorb heat to hot oil used for heating in the Waste Heat Recovery Unit.  The Thermal Oxidizer unit consists of:  • Main Burner  • Incinerator  • Stack  • Induced and Forced Draft Fan • Waste Heat Recovery Unit (WHRU)  JoshDigitally signed by JoshDN: cn=Josh, o, ou,email=joser.mbo@gmail.com, c=IDDate: 2013.06.11 11:54:18+0700
  7. 7. 2.3.5 Sales Gas Header, Pig Launcher Pagardewa Station Receiver Sales gas outlet DHU combined with Sales of H2S Gas Scavenger sent to Pagardewa through pipe 12 "is 42 km from CPP Medco Lematang EP.  To equalize the pressure between the two outlets, mounted a pressure valve 38‐PV‐702 with a pressure drop of about 30 psi on the Dehydration Unit.    Sales Gas header in complete with a Pig Launcher for pigging line transfer gas from the Singa to the CPP Pagardewa metering station. The pressure on the line pipe sales gas is maintained using a control valve 38‐PV‐701. A portion of the amount of gas delivered to flare gas if the pressure exceeds the set point of sales. At Pagardewa Station, line is equipped with: 2 instruments online analyzer H2O, H2S, and GC online.  

×