Green & new gen dc conf-v121

1,681 views

Published on

Green computing Bahrain 2012 conference: Green Computing and new generation datacenters

Published in: Education, Business, Technology
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
1,681
On SlideShare
0
From Embeds
0
Number of Embeds
15
Actions
Shares
0
Downloads
0
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Green & new gen dc conf-v121

  1. 1. Green & New Generation Datacentre Green Computing Conference Bahrain 2012 Jorge Sebastiao
  2. 2. • Roadmap Trends• Motivation• Concepts• Tracking the Heat• Virtualize• Liquid is Cool• Green Energy• Turn it Off• Measure• A new Kind of Box• Waste Management• Innovation• Carbon footprints• Green as a Best Practice
  3. 3. Trends
  4. 4. PUE Targets Annual Average PUE Targets 2.200 2.000 1.800 1.600 1.400 1.200 1.000 2006 2008 2010 2012 PUE
  5. 5. Where the power goes Electricity Lighting, etc. Transformer/ 3% UPS 10%Air Movement 12% IT Equipment 50% Cooling 25%
  6. 6. Cloud Computing
  7. 7. Green DC elements - 1• Has 2 external high voltage AC feeds
  8. 8. Green DC elements - 2• connected to trans-formers (efficient transformers) Transformers
  9. 9. Green DC elements - 3• Efficient UPS (up to 94% efficiency) Generator set Switch Board UPS
  10. 10. Green DC elements - 4• Cooling technology (free air lower the PUE) Cooling infrastructure
  11. 11. Green DC elements - 5• hot/cold ail containment (improve efficiency) Hot/Cold ail Containment
  12. 12. Green DC elements - 6• PUE Values 2 1,95 1,95 1,60 1,60 1,50
  13. 13. Green DC elements - 7
  14. 14. Tracking the Heat
  15. 15. Velocity and Pressure
  16. 16. Hot and Cold
  17. 17. Virtualize
  18. 18. Liquid is Cool & Efficient
  19. 19. Servers in Liquid
  20. 20. Green Energy
  21. 21. Solar Power
  22. 22. Wind Power
  23. 23. Workload Management
  24. 24. Energy Demand and Supply• Sources – Solar/wind: variable – Electrical grid: backup Solar power Power Load Workload Time
  25. 25. Delaying load within time bounds Power Nodes J1 J2 J3 Delay jobs is OK (within time bounds) Power J1 J2 J3 Nodes Time
  26. 26. Turn it off
  27. 27. Data management – turn it off Server 1 Server 2 Server 3 Active 7 4 5 6 3 1 2 4 6 Running queue: Non-required file JobA 4 6 Required file JobB 5Decommission JobC 1 Server 4 Server 5 Down 2 4 3 6 3 8 7
  28. 28. Outside the box
  29. 29. Measure
  30. 30. Waste Management
  31. 31. IT waistRecycle
  32. 32. Bloom Box Innovation
  33. 33. Innovation
  34. 34. Containers
  35. 35. Containers
  36. 36. Evaluate CarbonFootprint
  37. 37. CO2 Emissions
  38. 38. Calculate
  39. 39. Green Best Practice
  40. 40. Green Best Practices