Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.
LIVE MIGRATION
WINDOWS SERVER 2012 R2
HYPER-V
About Aidan Finn
• Hyper-V MVP
• Technical Sales Lead at MicroWarehouse
Ltd in Dublin, Ireland
• Working in IT infrastruct...
Agenda
• What is Live Migration?
• Explain the improvements of Live Migration
• Benefits of improved Live Migration
What is Live Migration
• Live Migration gives us agile IT
• A feature in Hyper-V since W2008 R2
• Live migrate 1 VM at a t...
Demo
Host1
Host2
Summary
• Faster Live Migration:
• Compression on existing 1 GbE hardware
• SMB 3.0 on 10 Gbps or faster
• Benefits:
• Hig...
• Aidan Finn
• @joe_elway
• My tech blog:
http://www.aidanfinn.com
• Petri IT Knowledgebase:
http://www.petri.co.il
Upcoming SlideShare
Loading in …5
×

Speaker Idol TechEd North America 2014

1,311 views

Published on

My presentation on WS2012 R2 Hyper-V Live Migration for the final of Speaker Idol and TechEd North America 2014. Note that the good stuff was in a recorded demo.

Published in: Technology, Business
  • Be the first to comment

  • Be the first to like this

Speaker Idol TechEd North America 2014

  1. 1. LIVE MIGRATION WINDOWS SERVER 2012 R2 HYPER-V
  2. 2. About Aidan Finn • Hyper-V MVP • Technical Sales Lead at MicroWarehouse Ltd in Dublin, Ireland • Working in IT infrastructure since 1996 • Virtualization, Windows Server, desktop management, System Center • Author of several books incl. Windows Server 2012 Hyper-V Installation And Configuration Guide • @joe_elway • http://www.aidanfinn.com • http://www.petri.co.il
  3. 3. Agenda • What is Live Migration? • Explain the improvements of Live Migration • Benefits of improved Live Migration
  4. 4. What is Live Migration • Live Migration gives us agile IT • A feature in Hyper-V since W2008 R2 • Live migrate 1 VM at a time between hosts • The ability to move virtual machines from one host to another • Without noticeable downtime to service • Hey Devs! Your apps stay running when IT does stuff!!!
  5. 5. Demo Host1 Host2
  6. 6. Summary • Faster Live Migration: • Compression on existing 1 GbE hardware • SMB 3.0 on 10 Gbps or faster • Benefits: • Higher VM:host ratios • Load balancing services • Proactive maintenance • Reaction to compute/fabric issues
  7. 7. • Aidan Finn • @joe_elway • My tech blog: http://www.aidanfinn.com • Petri IT Knowledgebase: http://www.petri.co.il

×