European Energy Policy: a Journey and a Tale

313 views

Published on

S.Po Paris

  • Hello Buyer / Buyer Mandate. We want to inform that we Can supply Aviation Kerosene,Jet fuel (JP 54-A1,5), Diesel (Gas Oil) and Fuel Oil D2, D6 FOB Rotterdam, we also have procedures for CIF: PRODUCT AND PRICE. Russia D2 Gas Oil Gost 305-82 Quantity: 50,000-150,000 Metric Tons. JP54 Aviation Fuel Colonial Grade 54./Jet A1 Quantity: 500,000-2,000,000 Barrels. D6 Virgin Fuel Oil Quantity: 400,000,000-800,000,000 Gallon. FOB CI DIP AND PAY (ROTTERDAM) TRANSACTION PROCEDURES CIF ASWP: Serious buyers only, my seller is ready to close this deal fast contact us below: Email: neftegazoiltrading@yandex.ru OR neftegazoiltrading@yahoo.com Skype: neftegazoiltrading Best Regards (Mr.) Vico Peißker. Skype: neftegazoiltrading Thank You
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Be the first to like this

European Energy Policy: a Journey and a Tale

  1. 1. ““European Energy Policy:European Energy Policy: a Journey & a Tale”a Journey & a Tale” S.Po ParisS.Po Paris Jean-Michel GlachantJean-Michel Glachant Director Florence School of Regulation European University Institute (Florence, Italy)
  2. 2. Overview • 1/ Régulation des réseaux: pour “ouvrir les marchés?”; européenne ou euro-compatible? (slides 1 à 6) • 2/ La construction dun cadre européen de régulation; EU vs US (slides 7 à 12) • 3/ Les briques de la régulation européenne (slides 13 à 22: les réseaux) (slides 23 à 28: les NRAs) (slides 29 à 31: les périphéries *DG COMP **Regions ***PCIs) • 4/ La saga de “l’achèvement du Marché intérieur” (slides 32-35) • 5/ La Commission Juncker et l’ “Union de l’énergie” (slides 36-42) 2
  3. 3. Why to regulate? I-1/ Because of the grid? •1.1 are electrical grids monopolies? Scale (if capacity of one line) and Scope (co-operation of several lines) •1.2 Abuse of ‘Market’ Power? Why not to separate (transmission ownership) from (system operation)? > TO / ISO model •1.3 are all electrical lines monopolies? ‘Merchant lines’ Scale (size 1 Generator) and Scope (interconnector DC) •1.4 Why not ‘merchant lines’ competing with grids? 3
  4. 4. I-2/ Because of Markets (dominated by incumbents being former monopolies)? •If abuse of Market Power? Why not competition? What market rules (Power Pools? Mandatory UK Pool / Voluntary NordPool) •Trade needs combination between grid operation & market operation as #Grid congestion (allocation of grid capacity? Of congestion energy costs?) #Balancing energy system (Electricity: no storage? / vs Gas Storage) #New players (Intermittent Gen. Wind & PV /Demand flexibility vs Plants) •Then: liberalized markets require more ruling than former monopolies because guaranteeing fairness to new entrants; can slow down later? (as CCGT entry UK) (I) Energy regulation: Overview Why? Whom? How? 4
  5. 5. I-3/ Energy Regulation: Whom? How? Whom: higher level (federal) or lower level (the states)? How: sector regulator (energy) or market monitor (competition)? • In the EU… • Whom? Level > European Commission or Member States? • How? Chanel > Energy Regulation vs Market Competition? • In the US… • Whom? Level > Federal Agency or Local States? • How? Chanel > Energy Regulation vs Market Competition? (I) Energy regulation: Why? Whom? How? 5
  6. 6. I-4/ Why to regulate energy mix for pollution? •Coal very big pollutant (SO2 / CO2): is coal regulated? Why regulate electricity not coal? Or regulate oil? •We can cap CO2 pollution: why not market for allowances for all users? •SO2 allowances: Typical US policy / rules of allowances allocation and trade >> hence market based on regulation •CO2 allowances: Typical EU policy / rules of allowances allocation and trade >> hence market based on regulation •If pollution is capped: why adding renewable obligation? Is price of carbon too low and too variable to steer renewable investment? • Can 2050 ‘2°C threat’ deadline be postponed? Do we need to accelerate? Whom else does this outside the EU? 6
  7. 7. 7
  8. 8. Grid regulation Level: Member States or EU? 1996 1st Package: negociated or regulated at MS level 2003 2nd Package: Regulator at MS level + EU crossborder 2009 3d Package: Indep Regulator at MS + EU EN.TSO & ACER + Grid Codes & Ten Year Development Plans & Gen. Adequacy Grid regulation Channel: Regulator or Compet. Authority? 2007 Sector Enquiry + “smoking guns” policy by DG COMP °Eon, RWE disinvest from grids °Swedish TSO reviews its congestion management scheme (priority to Swedes vis à vis Foreigners) Regulation building in the EU 8
  9. 9. Regulation building in the EU Market regulation Level: Member States or EU? 2003 2nd Package: open at MS level + EU crossborder rules 2009 3d Package: more EU EN.TSO + ACER + Codes (Congestion – Capacity allocation - Balancing energy ) + Regional Initiatives + ‘Market Target Model’ being market coupling with open balancing Market regulation Channel: Energy Reg. or Compet. Authority? °2005 EU Court suppress LT priority access to elec interco °Basic market rules: free Merchant PX vs reg. Market Coupling °Loose market monitoring from financial regulation capped by REMIT 2010 specific energy monitoring (ACER+ NRAs) 9
  10. 10. Energy Mix Level: Member States or EU? °In EU “Energy Mix” sovereign right of Member States (See Nuclear –prohibited in Austria / 80% in France) °big caveat: RES directives + EU ETS as “voluntarily” constraints for MS’s Energy Mix Energy Mix Channel: Energy Regulator or Compet. Authority? ° EU Court ruling: RES support “Environmental Public Policy” not market-based BUT support to be notified to DG COMP as “State Aid” (14 Billion in 2010) > DG Comp Guidelines 2014 °Support Schemes (Gov. MS) + Dispatch priority (Ener. Reg) °Regulators involved (Connections; Congestion; Balancing; TSO planning & incentives; Distribution grid regulation) Regulation building in the EU 10
  11. 11. 11 Regulation building: EU vs US
  12. 12. Grids : °more comprehensive federal frame in EU but still enforced by MS regulators (no federal regulator FERC) °grid regulation more submitted to “market opening target” but still mainly state operated (no regional RTOs - ISOs) °EU mutualisation TSOs&Regulators: EN.TSOs &ACER (RTO/FERC proxies?) °Independence DG COMP Markets: °EU Target Models + °Regional Initiatives + °ACER + °EN.TSOs + °REMIT: more comprehensive frame in the EU Energy Mix: °EU RES scheme + °EU ETS = more comprehensive scheme Institutions: °Strong US energy federal regulator in a smaller area; °No role for US Competition opposite to DG COMP; °US State regulators independent from federal as opposite to EU “ruling” MS regulators; °Strong US Environmental federal Regulator vs EU stronger directives >> US implementation stronger but Scope smaller (except Competition) Reg.Building: EU vs US 12
  13. 13. Legislation Changes with 3d Package Electricity and Gas Directives Full ownership unbundling (FOU) … or Independent System Operator (ISO) … or 3rd Option (ITO) 1/3 country clause → non-EU investment in EU energy networks Harmonization & strengthening of regulatory competences at national level Gas Directives and Regulations Regulation of LNG & storage (connection, TPA, principle of capacity allocation) Electricity and Gas Regulations TSOs enhanced cooperation (duties) 13
  14. 14. Bones of EU Regulation for Grid Monopolies Legislation Changes Electricity and Gas Directives & Regulations Creation of ACER (European Agency Regulators) and ENTSOs Guidelines, Framework Guidelines, Network Codes Transparency requirements, record keeping Creation of a regulatory framework for the development of regional markets Level playing field (reciprocity between Member States) 14
  15. 15. Comparison 2nd & 3rd Package: TSOs 2nd Package 3rd Package •TSOs and DSOs have to be unbundled (functions and management) from other activities •Access to grid is regulated •Cooperation left at TSOs’ initiative. No obligation • Unbundling (options) • Cooperation duties: – At EU level: TSOs must create ENTSOs (as EU body). 4 main tasks #draft network codes as EU regulation #common network operation tools #non-binding TYNDP 10-year network development plan #Gen Adequacy study – At regional level: within the ENTSOs + publication of a regional investment plan + promotion of energy exchanges 15
  16. 16. Comparison 2nd & 3rd Packages: NRAs 2nd Package 3rd Package •Creation of NRAs independent from energy companies •Act individually to ensure compliance with Directives and Regulation, as well as to approve exemptions for interconnectors (under the supervision of the Commission). •Cooperation between NRAs only if they estimate it necessary • Their independence, duties and powers are reinforced •Continue to act individually, but clear mandates now to act collectively: –At EU level: through the Agency for the cooperation of Energy Regulators (ACER), which notably monitors the execution of ENTSOs’ tasks and has (limited) decision- making role (inc. Exemptions for interconnectors provided certain conditions are fulfiled) –At regional level, with regulators of other MS, notably to promote allocation of cross- border capacities 16
  17. 17. EU regulatory framework "REGULATION" SECONDARY LEGISLATION PRIMARY LEGISLATION Treaty (Art. 194) Decisions Regulation (EC) 714/2009 Guidelines Network Codes Directive 2009/72/EC 17
  18. 18. Network Codes (Table in 2015) 18
  19. 19. Network Codes process 19
  20. 20. Requirements for Generators Comitology Process (entered 2013) • Size-dependent, technical requirements for Power Generating Modules • Common framework of obligations for Network Operators to appropriately make use of the Power Generating Facilities’ capabilities Demand Connection Comitology Process (entered 2014) • European rules on how demand interacts with the transmission system • Ensure effective contribution to the stability of the power system by all distribution networks and demand facilities • Clarify the role that demand response will play in contributing to the deployment of RES HVDC Connection ACER recommendation submitted (2014) Manage HVDC lines and connections: •Determine contribution to system security •Promote coordinated development of the infrastructure Operational Security ACER recommendation submitted (2013) Framework for maintaining a secure interconnected European electricity transmission system: common, legally binding principles and rules for operating electricity transmission networks  Operational Security requirements and principles; Data exchange; provisions for training of System Operator Employees Network Codes (Content Overview 2015) 20
  21. 21. Network Codes (Overview in 2015) Operational Planning & Scheduling ACER recommendation submitted (2013) Common time horizons, methodologies and principles allowing to carry out coordinated Operational Security Analysis and Adequacy analysis to maintain Operational Security and support the efficient functioning of the European internal electricity market Load Frequency Control & Reserves ACER recommendation submitted (2013) • Formalised harmonised system frequency quality targets • Objective and harmonised requirements regarding Load-Frequency- Control (LFC) and Reserves Emergency & Restoration Submission to ACER (2015) Procedures and remedial actions to be applied in the Emergency, Blackout and Restoration states Capacity Allocation & Congestion Management Definitive adoption expected in 2015 Rules that will introduce an EU Target Model: single approach to cross-border electricity trading •for cross-border capacity allocation in day-ahead and intraday timescales. Outlines the way in which capacity will be calculated across the different zones •for congestion management 21
  22. 22. Network Codes (Overview in 2015) Forward Capacity Allocation ACER recommendation submitted (2014) Design and operation of the markets in which the right to use cross-border capacity is sold in advance Electricity Balancing Resubmission to ACER (2014) Steps for transforming balancing markets to a set of regional markets and later a pan-European market 22
  23. 23. • 2nd Package: NRA submitted the tariff or the methodology for formal approval to the relevant body of the Member State and that relevant body could approve or reject the draft NRA decision • 3rd Package: 4 options (include balancing, connection fees…) – NRA fixes the tariffs – NRA fixes the methodology – NRA approves the tariffs – NRA approves the methodology • Member State can set general policy guidelines, but not set e.g. profit margin in cost-plus tariff NRAs in EU regulation 23
  24. 24. NRA has also a duty to ensure general compliance with EU law • Article 37.1 (b) ED and Article 40.1 (b) GD: NRA is granted a general competence as regards ensuring compliance with EU law – The « entire acquis communautaire » relevant for the internal energy market – Not only vis-a-vis the TSOs but any electricty or gas undertaking – Without prejudice to the powers of the Commission NRAs in EU regulation 24
  25. 25. NRAs monitoring duties • May be carried out by other authority than NRA, but NRA shall have a specific access to all the data of the monitoring exercise (except in case of derogation), also confidential information • Moreover, NRA has power to engage in monitoring activities on all of its core duties – include monitoring of wholesale and retail markets (also PXs, contractual practices), GEN investment, TSO behavior, congestion management… • Important: e.g. German regulator who focused mainly on grid issues did get monitoring of market more broadly NRAs in EU regulation 25
  26. 26. NRAs important powers 1. To issue binding decisions on electricity undertakings 2. To carry out investigations (in spite of mere inspections) into the functioning of the energy markets, and to decide upon and impose and impose any necessary and proportionate measure to promote effective competition and ensure the proper functioning of the market 3. To require any information from electricity undertakings relevant to the fulfilment of its tasks 4. To impose effective, proportionate and dissuasive penalties on electricity and gas issues List not exhaustive: Member State must grant NRA the powers enabling them to carry out taks in efficient and expeditious manner NRAs in EU regulation 26
  27. 27. NRAs Powers for enforcing compliance with network codes • Art 37(1)b ED and Art 41(1)b GD: NRA to ensure compliance with obligations under Directives and other relevant EU legislation: – When codes are adopted through comitology – Becomes part of acquis – Therefore: NRA is empowered to engage in investigations and to impose fines NRAs in EU regulation 27
  28. 28. Increased accountability of NRAs • NRA must be transparent on way it takes decisions + way it spends budget • Basis: more powers = more accountability • Annual reporting to MS, ACER, Commission – Must include and assessment of the TSO investment plan and consitency of national plan with community-wide ten-year investment plan • Legal accountability = appeal NRAs in EU regulation 28
  29. 29. Regulation of Market Dominance • Competition Policy concept (2raise price & gain profit) • HHI: 1000 non / > 1800 highly concentrated • ‘significant’ Market Power (not Monopolistic Competition) >40% Market Share • 25-30% &Withholding; Pivotal firm & inelastic demand • Dominant >50% – Super Dominant (>Sustainability &fast Entry) ~BUT~ ’joint Dominance’: Horizontal; Vertical • Definition ‘relevant market’ (‘Balancing Market’ in Spain) • Definition ‘ • Case: ‘Nuclear Assets’ in France • EU affair? Or national? #Size #Cross-border 29
  30. 30. Regional Electricity Markets • ERGEG (2nd Package) 2006: 7 ERI (initiatives) Baltic – CentralEast – CentralSouth- CentralWest- Northern- SouthWest- France UK Ireland • 8th: South East • Regulators + TSOs + Companies + MS + Commission • Congestion management • Capacity calculation & allocation • EU Power Target Model (FB Market Coupling + Open Bal) • Grid Codes • IntraDay & Balancing integration 30
  31. 31. Projects of Common Interest • Internal Market with ‘No Seams’, delivering 2020/2050, with SoS, Solidarity + Old ‘Council Barcelone’ 10% interco • Regulation 347/2013 ‘Trans-European Energy Infrastructure’ with ‘priority corridor’ & ‘Connecting Europe Facility’ fond Euro 50bn • Hardware part of Internal Market achievment: where ‘market’ won’t deliver, EU ‘planning push’ could help • October 2013: 132 power PCIs ¤several MS (non MS on top) ¤several criteria (monetized) ¤NRAs agreeing on cost allocation (ACER appeal) ¤End 2014 13 cases (12 NRAs; 1 ACER) > See Florence School Policy Brief 2015/01 for review • ACER Threshold (10% net benefits); Net Costs > revenues; only net losers or not? Binding contract or not? Interactions between PCIs? • ABC of CBA   Florence School Policy Brief 2013/03 31
  32. 32. • First Package in 1996: a 20 year journey so far – Getting an internal EU market for electricity? … roughly yes – Getting an internal EU market for gas? … more or less a kind of  Key 1: If we fully implement enforce the 3Key 1: If we fully implement enforce the 3rdrd Package and relatedPackage and related regulationsregulations • But: “unforeseen” shifts from initial power sector reform draft  Key 2: We have to respond to new challengesKey 2: We have to respond to new challenges • And: markets interact with all pillars of EU energy policy  Key 3: We should check policy consistencyKey 3: We should check policy consistency 32
  33. 33. #1 – Implement and enforce 3rd Package The architecture for the IEM is laid down in the 3rd Package and related regulations  it has to be fully implemented •European market(s) need(s) a European grid to allow the flow of energy without barriers at national borders  Reinforcement of the existing infrastructure through the implementation of the Trans-European network regulation  Finalisation and implementation of the Network Codes being key: • Needed grid harmonisation to be provided through the NC • Full implementation and reinforcement of European target models for gas and electricity through the NC •Room to improve competition  Markets to be better monitored, once REMIT is fully implemented  Again, finalization and implementation of Network Codes being key  What else?What else? 33
  34. 34. #2 – Respond to new challenges “Unforeseen” shifts from initial power sector reform draft: •Large-scale deployment of intermittent RES kept out of the market (priority dispatch, FIT or FIP) Increasing gap between wholesale market prices and consumer bills •Most RES not flexible due to: zero MC & dependence on resource availability Pricing at times of scarcity (price caps) & at times of abundance (negative prices) becomes key Finer spatial and temporal granularity? •Flexible back-up resources must get their return while running less hours (at lower prices?) [Wholesale price 36€/MWh vs. total generation cost for coal 55€, for gas 70€] Can scarcity pricing in an “energy-only” market deliver adequate returns? Long-term adequacy / short-term flexibility do not match! 34
  35. 35. #3 – Policy consistency • Objective of achieving an internal energy market … but risk of a definitive fragmentation of the European electricity market due to uncoordinated national policy initiatives (RES support, capacity payments) • Interacting policy targets undermining CO2 price signal … 20% RES and 20% energy efficiency not needed to reach GHG target, are EU industrial policy BUT: RES target (= percentage of non polluting energy) and energy efficiency target (= volume of energy consumed) influence C02 emissions; hence the demand for C02 permits; hence: C02 price is an end result of the 2 other targets and not a key driver for GHG emission reduction • RES did evict gas by reducing net demand in EU wholesale market… but not coal: German coal was near to record 50% elec generation in 2014 35
  36. 36. More? Why Not… 36
  37. 37. Energy Union is / isn’t… •Is’nt new Institution for EU energy policy: NO institution created •is political “novelty” Commission Juncker with ‘Vice-President EnerUnion’ Sefcovic > Comm. Canete who >> both Climate&Energy •~ unveiled 25th Feb. 2015 Hardly foreseen @Barroso Commission (2013-14) // EnerUnion = about 25 proposals of action •~ in touch with EU Council March 2015 EU Council (Heads of State & Gov.) agreed EC go ahead with EnerUnion •~ nevertheless a gamble No institution created: Council of ministers &Parliament have to agree any legislative proposal… •NB: Ener.Union Manifesto don’t strictly tie anybody: even Commission can change having seen what blocks / what goes 37
  38. 38. Energy Union only <mini> to boost Internal Market >> Eurelectric, Eurogas new tag on (existing institutions + BAU) = let’s call it Ener.Un: it targets ’Only’ ‘Internal Market’ extended to RES & Capacity Mechanism made fully ‘market based’ & ‘technology neutral’. However such EnergyUnion-BAU ends a bit undefined: ¤ MS have strong powers to take ‘outside the market’ initiatives #Germany: Off-shore & RES exemptions (finally agreed Commission) + Energy Efficiency push #UK: SoS being Capacity mechanism + LT contrat with UK Nuclear or tidal + Off-shore + ISO Grid +? ¤ >> Then: at what speeed Commission could follow or catch-up MS? For ex. Action against ‘MS’ capacity mechanisms via ‘State Aid’ enquiry Alternative Energy Union(s)? ~1 / EU Internal Market BAU?
  39. 39. Commission 25 Feb. proposals? ~2 / >BAU for Internal Market & Governance? EnergyUnion (not 4th Pack.) BUT big Upgrade for Internal Market & Governance: Programme from February 2015 #Market *Legislation 2016; retail & wholesale; integrating RES; phasing out non market based support; coordinating Capacity Mechanisms . **Legislation 2018 Electricity security of supply (= ‘recall’ of national SoS) #Governance ***Review framework from 3d Package notably for ACER (to ++power of Europeanizing regulation) & ENTSOs (to ++ as regional operational entities to create) ****Propose guidance for ‘regional cooperation for market integration’ and to act at regional level wih regu. Bodies, MS and stakeholders *****Create ‘Energy Infrastructure Forum’ with MS, Regional coop. Groups, and EU institutions (ACER? Banks?) by late 2015 39
  40. 40. Commission 25 Feb. proposals ~3 / Not BAU for SoS & “External” Governance? 2- EU actions for Security of Supply #SoS *Legislation: Revision Gas Regulation by 2015-2016 **Legislation 2018 Electricity security of supply (= ‘recall’ of national SoS) *** Implementation of existing PCIs with adequate financing ** **Strategy for LNG an its storage ** ***Council 19-20 March : feasibility of gas joint-buying mechanism #Ext. Energy Governance ** ***Legislation: Revision Decision International Agreement for Commission to intervene ex ante before signature of agreements with 1/3 countries ** ** **Coordination Commission / HR-VP / MS to create international diplomacy for energy & climate issues; for international treaties (as TTIP) or within WTO, and launch new initiatives (as agreement with India, with China ;etc) in field RES, Ener.eff, etc. 40
  41. 41. Commission 25 Feb. proposals? ~4 / Not BAU for Sustainability Fields of EU actions for sustainability: *Legislation to revise EnerEff directive &make proposals to meet 2030target **RES package by 2016-17 incl.sustainable &cost-effective biomass, biofuels *** Legislation to achieve Oct2014GHG target in ETS & non-ETS sectors ** **Legislation ‘Full Road Transport Package’ covering efficient pricing of infrastructures; rool-out of intelligent transport; enhancing ener.eff ------------------------------------------------------------------------------------------------------- ** ***Strategy to facilitate Investment in efficient ‘Heating & Cooling’ ** ** **Create Smart financing for smart buildings fund ** ** ***To push MS & regions to use more the funds to renovate housings ------------------------------------------------------------------------------------------------------- **** **** Strategy for transport research & innovation agenda **** **** *Revision ‘Strategic Energy Technology Plan’ 41
  42. 42. How to conclude? #I don’t know! # To be seen in 2017-19… 42
  43. 43. www.florence-school.eu 43 Thank you for your attention Email contact: jean-michel.glachant@eui.eu Follow me on Twitter: @JMGlachant already 21 000+ tweets Read the IAEE Journal I am chief-editor of: EEEP “Economics of Energy & Environmental Policy” My web site: http://www.florence-school.eu

×