The Cotocon group LEED-EBOM Program<br />
LEEDCertification<br />Benchmark<br />Track and evaluate energy and water consumption<br />
Why benchmark?<br />The main  purpose of benchmarking is to:<br />Make More <br />Informed <br />Decisions<br />Assess ope...
Energy performance rating system<br />
The Ideal facility<br />Commercial bldg. over 5K S.F.<br />Understands value of green<br />Ownership is a long-term invest...
Steps<br />Building energy check-up<br />Engineer’s sign-off<br />Survey and analysis<br />LEED-EBOM contract<br />Mainten...
1. Building Energy Check-Up<br />Collect information;<br />Number of water fixtures and flow rates<br />Any retro commissi...
Benchmark Information required<br />Address<br />Year built<br />Gross floor area (SF)<br />Weekly operating hours<br /># ...
2. Engineer Sign-Off<br />A score of 75 or greater qualifies for ENERGY STAR Label<br />Complete application with professi...
Feasibility Study<br />Building survey<br />Code compliance<br />Systems narrative<br />Mechanical<br />Plumbing<br />Elec...
Implementation<br />Design documents<br />Architectural<br />Mechanical<br />Plumbing<br />Electrical<br />Fire safety<br ...
3. LEED Survey and Analysis<br />Performed by Development Team<br />50% value of this fee is credited towards step 4 (LEED...
4. LEED-EBOM Contract(6-24 months is usual duration)<br />Appoint LEED Coordinator (LEED AP- single point of contact for c...
5. Maintenance Program<br />Establish program for document collection<br />Management  of ENERGY STAR input<br />Satisfy V...
Upcoming SlideShare
Loading in …5
×

The Cotocon Group LEED EBOM Program

4,082 views

Published on

  • Be the first to comment

  • Be the first to like this

The Cotocon Group LEED EBOM Program

  1. 1. The Cotocon group LEED-EBOM Program<br />
  2. 2. LEEDCertification<br />Benchmark<br />Track and evaluate energy and water consumption<br />
  3. 3. Why benchmark?<br />The main purpose of benchmarking is to:<br />Make More <br />Informed <br />Decisions<br />Assess operational effectiveness<br />Identify under-performing facilities<br />Verify and track progress of projects<br />Assist in the planning process<br />Set investment priorities<br />Be more responsive<br />
  4. 4. Energy performance rating system<br />
  5. 5. The Ideal facility<br />Commercial bldg. over 5K S.F.<br />Understands value of green<br />Ownership is a long-term investor<br />Preferable 1 or 2 large tenants<br />50% or more occupied<br />Bldg. operational for at least 12 months<br />Owns or manages multiple bldgs.<br />
  6. 6. Steps<br />Building energy check-up<br />Engineer’s sign-off<br />Survey and analysis<br />LEED-EBOM contract<br />Maintenance program<br />
  7. 7. 1. Building Energy Check-Up<br />Collect information;<br />Number of water fixtures and flow rates<br />Any retro commissioning performed<br />Any tenant build-outs or improvements on books<br />Lighting conditions<br />Alternate transportation programs<br />Roofs and parking conditions<br />Past 12 months energy bills<br />Hours of operation<br />Establish base year consumption from all utilities<br />Schedule benchmark review meeting<br />
  8. 8. Benchmark Information required<br />Address<br />Year built<br />Gross floor area (SF)<br />Weekly operating hours<br /># of workers on main shift<br /># of personal computers<br />Percent of floor area that is air conditioned (&gt;=50%, &lt;50%, or none)<br />Percent of floor area that is heated (&gt;=50%, &lt;50%, or none)<br />
  9. 9. 2. Engineer Sign-Off<br />A score of 75 or greater qualifies for ENERGY STAR Label<br />Complete application with professional engineer stamp and submit for client <br />Result meeting, discuss proceeding to step 3<br />A score of 74 or less the following must occur<br />Result meeting, discuss options to initiate feasibility study<br />
  10. 10. Feasibility Study<br />Building survey<br />Code compliance<br />Systems narrative<br />Mechanical<br />Plumbing<br />Electrical<br />Fire safety<br />Building envelope report<br />Roof<br />Window<br />Recommendations<br />Preliminary budgets<br />LEED potential<br />
  11. 11. Implementation<br />Design documents<br />Architectural<br />Mechanical<br />Plumbing<br />Electrical<br />Fire safety<br />Filing<br />Bidding<br />Construction<br />
  12. 12. 3. LEED Survey and Analysis<br />Performed by Development Team<br />50% value of this fee is credited towards step 4 (LEED Certification)<br />LEED-EBOM gap analysis for levels of certification<br />Achievable credits<br />Water calculations and template completed<br />Water conservation measures<br />Cost analysis <br />Payback / ROIs<br />The Cotocon Group’s scope of work<br />Owner’s / Manager’s responsibilities<br />Additional vendors the owner/manager may need to obtain <br />Discuss owner’s fees for LEED-Online registration and certification <br />
  13. 13. 4. LEED-EBOM Contract(6-24 months is usual duration)<br />Appoint LEED Coordinator (LEED AP- single point of contact for communication)<br />Register building (owner expense)<br />LEED Coordinator:<br />Form credit teams<br /> Assigns credits to team members<br />Weekly required meeting; 1-Hr. w/ property manager, 2-Hr. w/ building engineer <br />Develop Policies and Procedures for tenant handbook<br />Building exterior and landscape management plan<br />Integrated pest management, erosion control and landscaping management plan<br />Sustainable purchasing policies<br />Facilities alterations and additions policies<br />Environmental tobacco smoke control policy<br />Green cleaning policies<br />Tracking and purchase requirements<br />Energy audit (ASHRAE level 2 ?)<br />Test and balances<br />Retro commissioning<br />Round Table Review: <br />LEED Coordinator presents submittal templates and documents to LEED Team<br />Final proofing and review before online submittal<br />Opportunity for collaboration, learning and sharing knowledge. <br />
  14. 14. 5. Maintenance Program<br />Establish program for document collection<br />Management of ENERGY STAR input<br />Satisfy V3 requirements<br />

×