Prepared by:            Jimit Dhruv         Elect.Engg,Dept.Valiya Institute Of Technology-Valiya
Introduction Core material:   Basic material are Alloy Steel having main    content Silicon & carbon   Which increases ...
 HRS:   HRS not used now a days   As it has random direction &hard to measure   Magnetic properties CRGOS:   CRGOS sh...
Core construction Due to Pulsating flux, core should be  laminated Transformer of larger size may forms in  cut “C” or c...
Transformer winding
Concentric                                       Sandwich Spiral: It is used 100  A& for low Voltage  Winding    Mechani...
InsulationsTwo main kinds of Insulations:1. Major Insulation:    Insulating cylinder between LV & core    Also between H...
Bushing Up to 66kv non-condenser bushing are used is  porcelain & oil filled Above 66kv condenser bushing are used for  ...
Tapping Main two location:  1. Inside Tank  2. Outside Tank Considered as integral part of transformerTapping operation ...
Transformer Tank Plain sheet steel  Tank Tube Tank Corrugated Tank Radiator Tank Tank with separate   coolers
Conservator What is Conservator ? The expansion of oil from Transformer  tank takes up in Conservator When oil contract...
Buchholz Relay Operation: Gas operated relay AT the time of fault to maintain the continuity  of the supply Fault dete...
Transformer oil Double purpose :   ie cooling & Insulating Permittivity is 2.5 As per I.A.S breakdown strength of oil ...
WORKSHOP(TPT DEPT.)WINDING SHOP  CORE & ACTIVE PART      FINAL ASSEMBLY          QUALITY TEST             FINAL TESTING
WINDING SHOP TYPES OF WINDING   i.   NORMAL WINDING   ii. INTERLEAVE WINDING   iii. TERITARY WINDING                     ...
 Conductor Insulation:    1. Precompressed press board insulation(CRIP       PAPER)    2. Craft paper    3. Also spacers ...
 PROCEDURE:
CORE & ACTIVE PART ACTIVE PART C.R.G.O. STRIPS 1-STRIP HAS WIDTH OF 0.27 mm COIL OR WINDING ASSEMBLY PROCEDURE: Manu...
FINAL ASSEMBLY Installation of active part and assembly of  accessories TRANSFORMER TANK                      • JOINED A...
 ACCESSORIES:  Blanker : Leakage of oil & Radiators  adjointment  Buchholz Relay: To trip the transformer  OSR (oil se...
 Method of Cooling:    i.   ONAN    ii. ONAF    iii. OFAF    iv. For very high temp using HEAT         EXCHANGER CT(Curr...
 PROCEDURE  Vacuuming of Tank(up to 0.3 mbar) for about   24hrs to 36hrs  The Leak Rate Test with the use of water & ai...
QUALITY TEST ANALYSIS WITH “SIGMA CARD” Sigma card includes below required data    Design    Process Time    M/C size...
FINAL TESTING                  ROUTINE TESTS   TYPE TESTSNO LOAD TETS                                                     ...
CT (CURRENT TRANSFORMER) Generally CT is use for the below four  purposes:    Measurement of Current    Measurement of ...
 Quartz in CT Reduces the quantity of oil Provides mechanical strength for the    conductors   Improves the quality of...
Thank You
PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv Jimit
Upcoming SlideShare
Loading in …5
×

PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv Jimit

53,497 views

Published on

THIS PRESENTATION WILL GIVE A GREAT KNOWLEDGE OF MANUFACTURING OF PRACTICAL AS WELL AS THEORETICAL TRANSFORMERS.

Published in: Business
  • DOWNLOAD THIS BOOKS INTO AVAILABLE FORMAT (Unlimited) ......................................................................................................................... ......................................................................................................................... Download Full PDF EBOOK here { https://tinyurl.com/y6a5rkg5 } ......................................................................................................................... Download Full EPUB Ebook here { https://tinyurl.com/y6a5rkg5 } ......................................................................................................................... ACCESS WEBSITE for All Ebooks ......................................................................................................................... Download Full PDF EBOOK here { https://tinyurl.com/y6a5rkg5 } ......................................................................................................................... Download EPUB Ebook here { https://tinyurl.com/y6a5rkg5 } ......................................................................................................................... Download doc Ebook here { https://tinyurl.com/y6a5rkg5 } ......................................................................................................................... ......................................................................................................................... ......................................................................................................................... .............. Browse by Genre Available eBooks ......................................................................................................................... Art, Biography, Business, Chick Lit, Children's, Christian, Classics, Comics, Contemporary, Cookbooks, Crime, Ebooks, Fantasy, Fiction, Graphic Novels, Historical Fiction, History, Horror, Humor And Comedy, Manga, Memoir, Music, Mystery, Non Fiction, Paranormal, Philosophy, Poetry, Psychology, Religion, Romance, Science, Science Fiction, Self Help, Suspense, Spirituality, Sports, Thriller, Travel, Young Adult,
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • How many earthing used as per IS between Core &body
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Well presented. May add a reference to lightining protection
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • hello Mr. Jimit dhruv , send me copy at vipinsingh541991@gmail.com
    thanx....
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • thank you jimitdhruv,send me a copy and also its financial aspect ,costing and human resource and materials used and where to get them
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here

PRESENTATION ON MANUFACTURING OF TRANSFORMER By Dhruv Jimit

  1. 1. Prepared by: Jimit Dhruv Elect.Engg,Dept.Valiya Institute Of Technology-Valiya
  2. 2. Introduction Core material:  Basic material are Alloy Steel having main content Silicon & carbon  Which increases permeability & reduces losses
  3. 3.  HRS:  HRS not used now a days  As it has random direction &hard to measure Magnetic properties CRGOS:  CRGOS shows excellent Magnetic properties  So CRGOS is more used
  4. 4. Core construction Due to Pulsating flux, core should be laminated Transformer of larger size may forms in cut “C” or cut “E” type. Types of Interleaving: I. Simple Interleaving II. Meter core Interleaving: 1)45 ˙ 2) 33 ˙ /55 ˙ overlapping  In 3-Ø Shell type transformer middle winding is reversed  If not then 73% more core is used which leads in increase in over all cost
  5. 5. Transformer winding
  6. 6. Concentric Sandwich Spiral: It is used 100 A& for low Voltage Winding  Mechanically very strong  Sandwich: mostly used Helical :Intermediate for shell type transformer range of current  Control leakage  Suitable for LV winding reactance of large transformer  HV & LV are near so leakage flux is reduced Cross-over: suitable of  mmf of each section is current not exceeding 20 same. A  Use for HV winding of small transformer Continuous disc: no of turns wound radially over one another  separated by spacers  HV winding  Mechanically strong
  7. 7. InsulationsTwo main kinds of Insulations:1. Major Insulation:  Insulating cylinder between LV & core  Also between HV & LV  Insulating barriers between limbs, coils & core yoke  Oil impregnated paper used as it has high dielectric strength2. Minor Insulation:  Insulation between individual turns & between layers  Conductor Insulation: paper&cotton  Air insulated Transformer insulation used is glass tap
  8. 8. Bushing Up to 66kv non-condenser bushing are used is porcelain & oil filled Above 66kv condenser bushing are used for economic reasons. Condenser type bushing: It is formed by inserting Aluminum foiled layers into a paper winding at predetermined radius. “Partial capacitance” In outdoor substation the bushing are covered by a porcelain rain shade
  9. 9. Tapping Main two location: 1. Inside Tank 2. Outside Tank Considered as integral part of transformerTapping operation (1)On load (2)Off loadtap changer tap changer Tapping is terminated just bellow oil level External handle Taping is done on HV winding Provided in middle (axial & radial force)
  10. 10. Transformer Tank Plain sheet steel Tank Tube Tank Corrugated Tank Radiator Tank Tank with separate coolers
  11. 11. Conservator What is Conservator ? The expansion of oil from Transformer tank takes up in Conservator When oil contracts, air from atmosphere enters in Conservator . Risk of contamination of oil in transformer Breather valve is mounted to avoide moisture Breather contain silica in it
  12. 12. Buchholz Relay Operation: Gas operated relay AT the time of fault to maintain the continuity of the supply Fault detected particularly in incipient stage , major fault can be avoided Which is placed between conservator and transformer tank
  13. 13. Transformer oil Double purpose :  ie cooling & Insulating Permittivity is 2.5 As per I.A.S breakdown strength of oil used must be 50kv RMS Major disadvantage is sluging To overcome this, synthetic oil is prefered One of the e.g is Chlorinated dephenyl is a synthetic oil its permittivity is 4.5
  14. 14. WORKSHOP(TPT DEPT.)WINDING SHOP CORE & ACTIVE PART FINAL ASSEMBLY QUALITY TEST FINAL TESTING
  15. 15. WINDING SHOP TYPES OF WINDING i. NORMAL WINDING ii. INTERLEAVE WINDING iii. TERITARY WINDING ROTARY HORIZONTAL HELICAL K- MACHINES TRANSPOSITION TYPE CONTINUOUS VERTICAL DISC• End Rings & shielding for prevention purpose
  16. 16.  Conductor Insulation: 1. Precompressed press board insulation(CRIP PAPER) 2. Craft paper 3. Also spacers as insulation Moisture Control  Winding Auto Clave: Uses temp. of 110º C to 130º C and Vacuum of about 0.4 to 0.5 mbar.  Insulating Oven : Uses Heating Only Pressure Machine Brazing Machine with use of SILPHOS ALLOY Post Insulation
  17. 17.  PROCEDURE:
  18. 18. CORE & ACTIVE PART ACTIVE PART C.R.G.O. STRIPS 1-STRIP HAS WIDTH OF 0.27 mm COIL OR WINDING ASSEMBLY PROCEDURE: Manufacturing of LIMB Core Insulation Removal of TOP FRAM for Coil assembly Winding insulation detail TOP YOKE FILLING VAPOUR PHASE OVEN HV & LV leads from top & bottom to the bushings REGULATING COILS to the tap changer
  19. 19. FINAL ASSEMBLY Installation of active part and assembly of accessories TRANSFORMER TANK • JOINED AT BELL TYPE BOTTOM SIDE • JOINED AT CONVECTIONAL TYPE UPPER SIDE
  20. 20.  ACCESSORIES:  Blanker : Leakage of oil & Radiators adjointment  Buchholz Relay: To trip the transformer  OSR (oil serge relay): To indicate the level and quality of oil  MOLG(magnate oil gage): It indicates the level of oil in the conservator  Breather Valve: Provide dry air using silica gel and have air seal of neoprene  Cooling Equipment: Generally for cooling of oil in a tank 1. Radiators 2. Thermosyphan
  21. 21.  Method of Cooling: i. ONAN ii. ONAF iii. OFAF iv. For very high temp using HEAT EXCHANGER CT(Current Transformer):Two purposes; 1. Winding temp indicator (WTI) 2. Oil temp indicator (OTI) BUSHINGS: The leads from top and bottom of the winding are brought out to a length of few cm only and the outdoor terminal of the transformer are provided by bushings
  22. 22.  PROCEDURE  Vacuuming of Tank(up to 0.3 mbar) for about 24hrs to 36hrs  The Leak Rate Test with the use of water & air  Oil Test which includes BDV & PPM  Oil Filling  After the IMPREGNATION TIME the whole accessories are to be attached.
  23. 23. QUALITY TEST ANALYSIS WITH “SIGMA CARD” Sigma card includes below required data  Design  Process Time  M/C size specification  Process of manufacturing  Dimension specification  Testing specification  Information about control points
  24. 24. FINAL TESTING ROUTINE TESTS TYPE TESTSNO LOAD TETS TEMPRETURE TEST LOAD LOSSINSULATION IMPULSE TEST TESTCAPACITANCE & ZERO SEQUENCE TAN δ IMPEDANCE TEST SEPARATE SOURCE HARMONIC AND NOISE LEVEL TEST INDUCED OVER VOLTAGEWINDING TEST VOLTAGE RATIO
  25. 25. CT (CURRENT TRANSFORMER) Generally CT is use for the below four purposes:  Measurement of Current  Measurement of Power  Isolation between High voltage and Low Voltage  Inputs to Relays & Protection Systems PROCEDURE OF CURRENT TRANSFORMER: CO NDUCTORS USES :ALUMINIUM OR COPPER(HIGH CURRENT RATING) In the manufacturing of the primary winding or protection core there will be the creation of the capacitance as below.  GRADING & SUB GRADING.  MAIN GRADING HAS WRAPPED ALUMINIUM FOIL & CRIP PAPER  AT 300MM DISTANCE PERFORATED ALU. FOIL (400MM) AND CRIP PAPER.  SIMULTANEOUSLY INSULATION MAKE CAPACITANCE
  26. 26.  Quartz in CT Reduces the quantity of oil Provides mechanical strength for the conductors Improves the quality of oil by absorbing moisture Being a bad conductor of heat, it allows slow heating /cooling of the CT. Finally expansion tank is attached and after that evacuation of oil and gas filling will be there . There is also one imp term is D3 point which is also called the earth point.
  27. 27. Thank You

×