Professional  Advanced Communication   Proposal Presentation Jalal Uddin Ahammad  722869 Md. Fakhrul Islam 722621 Ashek Ah...
Objectives <ul><li>New version of GISMO using State-of-art web technology </li></ul><ul><li>Standard interface design to r...
GISMO <ul><li>A graphical interactive student monitoring and tracking system tool  </li></ul><ul><li>Entirely based on Jav...
Analysis and Design  <ul><li>Analysis is performed from three different  </li></ul><ul><li>perspectives: </li></ul><ul><li...
Technological-Analysis  <ul><li>Shortcomings from technical point of view </li></ul><ul><li>Programmer dependency </li></u...
Technological-Design (1/2) <ul><li>Possible solutions </li></ul><ul><li>Data representation in a standard format and retri...
Technological-Design (2/2) <ul><li>Error handling using standard Document Type Definition (DTD). </li></ul><ul><li>Increas...
Graphical-Analysis <ul><li>Shortcomings from graphical point of view </li></ul><ul><li>Representation is complex </li></ul...
Graphical-Design (1/2) <ul><li>Typical solutions </li></ul><ul><li>Representation technique depicting students’ </li></ul>...
Graphical-Design (2/2) <ul><li>Minimization of scattered dot notation </li></ul>Updating and redesigning the Gismo tool
Socio-economic Analysis  <ul><li>Social and economical challenges </li></ul><ul><li>High maintenance cost can be reduced p...
Schedule(1/2) Updating and redesigning the Gismo tool
Schedule(2/2) Updating and redesigning the Gismo tool
Budget  Updating and redesigning the Gismo tool Task Amount Duration(days) Analysis and Design €  3360  14  Implementation...
Conclusions <ul><li>New version will lead to more features like interoperability through standardized interfaces, notion o...
Upcoming SlideShare
Loading in …5
×

Professional Advanced Communication

410 views

Published on

The proposal is submitted to a person who is entirely involved with the development of the tool, GISMO which needs to be enhanced. GISMO is based on Java Applet. It is a nice tool to generate report using charts for the instructor of a course to have an idea about the course. He is concerned with how the interaction between GISMO and Moodle can be optimized so that it can play much more significant role in understanding the social, cognitive and behavioural aspects of students.
Moreover, he possesses expertise about current and future trend of students’ performance monitoring software.

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
410
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
6
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Professional Advanced Communication

  1. 1. Professional Advanced Communication Proposal Presentation Jalal Uddin Ahammad 722869 Md. Fakhrul Islam 722621 Ashek Ahmmed 737737 Mohammad Jane Alam 737082 Shahnewaz Ali 737700 Updating and redesigning the Gismo tool POLITECNICO DI MILANO Facoltà di Ingegneria dell’Informazione
  2. 2. Objectives <ul><li>New version of GISMO using State-of-art web technology </li></ul><ul><li>Standard interface design to reduce inteoperability problem </li></ul><ul><li>Server Load optimization </li></ul><ul><li>Maintenance cost reduction </li></ul><ul><li>Version compatibility </li></ul>Updating and redesigning the Gismo tool
  3. 3. GISMO <ul><li>A graphical interactive student monitoring and tracking system tool </li></ul><ul><li>Entirely based on Java Applet </li></ul><ul><li>Generates reports retrieving data from Moodle </li></ul><ul><li>Tool to examine social, cognitive, and behavioural aspects of students. </li></ul>Updating and redesigning the Gismo tool
  4. 4. Analysis and Design <ul><li>Analysis is performed from three different </li></ul><ul><li>perspectives: </li></ul><ul><li>Technological </li></ul><ul><li>Graphical </li></ul><ul><li>Socio-economic </li></ul>Updating and redesigning the Gismo tool
  5. 5. Technological-Analysis <ul><li>Shortcomings from technical point of view </li></ul><ul><li>Programmer dependency </li></ul><ul><li>More efforts for little changes </li></ul><ul><li>Adaptability/interoperability problem </li></ul><ul><li>Exception handling </li></ul><ul><li>Version Incompatibility </li></ul><ul><li>High server load </li></ul>Updating and redesigning the Gismo tool
  6. 6. Technological-Design (1/2) <ul><li>Possible solutions </li></ul><ul><li>Data representation in a standard format and retrieval of data using a simple parser. </li></ul><ul><li>Knowledge of XML data is sufficient for any modification. </li></ul><ul><li>Standard interface for retrieving XML data. </li></ul>Updating and redesigning the Gismo tool
  7. 7. Technological-Design (2/2) <ul><li>Error handling using standard Document Type Definition (DTD). </li></ul><ul><li>Increasing server utilization by pulling XML data and generating charts in client side. </li></ul>Updating and redesigning the Gismo tool
  8. 8. Graphical-Analysis <ul><li>Shortcomings from graphical point of view </li></ul><ul><li>Representation is complex </li></ul><ul><li>Dot notation </li></ul><ul><li>Emphasize on coding and DB access </li></ul><ul><li>Background knowledge </li></ul><ul><li>Scope for more clarification </li></ul>Updating and redesigning the Gismo tool
  9. 9. Graphical-Design (1/2) <ul><li>Typical solutions </li></ul><ul><li>Representation technique depicting students’ </li></ul><ul><li>performance in assignments </li></ul>Updating and redesigning the Gismo tool
  10. 10. Graphical-Design (2/2) <ul><li>Minimization of scattered dot notation </li></ul>Updating and redesigning the Gismo tool
  11. 11. Socio-economic Analysis <ul><li>Social and economical challenges </li></ul><ul><li>High maintenance cost can be reduced provided developers can entirely focus on “what to represent” rather than “how to represent”. </li></ul><ul><li>Satisfaction on customization can be improved by understanding the motivation behind the changes. </li></ul>Updating and redesigning the Gismo tool
  12. 12. Schedule(1/2) Updating and redesigning the Gismo tool
  13. 13. Schedule(2/2) Updating and redesigning the Gismo tool
  14. 14. Budget Updating and redesigning the Gismo tool Task Amount Duration(days) Analysis and Design € 3360 14 Implementation € 5040 21 Testing and debugging € 1200 10 Total € 9600 45
  15. 15. Conclusions <ul><li>New version will lead to more features like interoperability through standardized interfaces, notion of representation and enhanced user interactions. </li></ul><ul><li>Cost effective and time efficient solution supporting the vision…”do a lot more with a lot less”. </li></ul><ul><li>New reports can enhance the observation angle of instructors. </li></ul>Updating and redesigning the Gismo tool

×