Resume 11 14-2011

218 views

Published on

Published in: Career, Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
218
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Resume 11 14-2011

  1. 1. Jeffrey G. Christiansen Work History
  2. 2. Employment History <ul><li>USMC – Avionic Technician and Senior Quality Assurance Inspector </li></ul><ul><li>College (Misc. Jobs during School) </li></ul><ul><li>Carsan Engineering </li></ul><ul><ul><li>Electronics Technician </li></ul></ul><ul><ul><li>Research & Development Technician </li></ul></ul><ul><ul><li>Operations Manager </li></ul></ul><ul><li>Star Precision – Sales Manager </li></ul><ul><li>Aerion Technologies – Materials Manager </li></ul><ul><li>3M (Aerion was acquired by 3M in 2006) </li></ul><ul><ul><li>Product Manager </li></ul></ul><ul><ul><ul><li>Occupational Health & Environmental Safety Division – Gas Detection, 3M Indy </li></ul></ul></ul><ul><ul><ul><li>Communications Markets Division – One Pass, Fiber Connectors, Diagnostics Test Equipment, Tools & Rigs </li></ul></ul></ul><ul><ul><ul><li>Track and Trace Division – Underground locating </li></ul></ul></ul><ul><ul><ul><li>Austin Plant (CMD) - Injection Molding </li></ul></ul></ul><ul><ul><ul><li>Building & Commercial Services Division – Oil Monitor Test Equipment (Scale Up) </li></ul></ul></ul>
  3. 3. Career Highlights <ul><li>Aerion Technologies </li></ul><ul><ul><li>Supply Chain Design </li></ul></ul><ul><ul><ul><li>Designed and implemented outsource plan to reduce cost resulting in a reduction of between 5% and 10% on 3 different products. </li></ul></ul></ul><ul><ul><ul><li>Reworked contract with local outsource which improved service efficiency and lowered inventory levels. </li></ul></ul></ul><ul><li>3M </li></ul><ul><ul><li>Financial Review </li></ul></ul><ul><ul><ul><li>Continuous deep dives into cost to manage burden rates to improve departmental cost. </li></ul></ul></ul><ul><ul><ul><li>Daily management of resources, space allocation, </li></ul></ul></ul><ul><ul><li>Aerion Transition </li></ul></ul><ul><ul><ul><li>Lead transition move from Denver to Austin </li></ul></ul></ul><ul><ul><ul><li>Lead transition move from Denver to Longmont (Outsource) </li></ul></ul></ul><ul><ul><li>Lean Implementation </li></ul></ul><ul><ul><ul><li>Daily Task Accountability </li></ul></ul></ul><ul><ul><ul><li>Pitch tracking </li></ul></ul></ul><ul><ul><ul><li>OEE Implementation </li></ul></ul></ul><ul><ul><ul><li>Lead and Participated in multiple Kiazan Events. </li></ul></ul></ul>
  4. 4. <ul><li>Targets are based on hours, process time, demand & personnel. </li></ul><ul><li>Blue and Green differentiates 2 models and red is the daily total </li></ul>Pitch Tracking <ul><li>Overall Equipment Effectiveness - Drove continuous improvement on machine operations through visual controls. </li></ul><ul><li>Automated system – Next Generation </li></ul>OEE Tracking
  5. 5. Operations Register Cost Tracking Maintenance <ul><li>Operations Register – Track Monthly cost and reviewed with team. </li></ul><ul><li>Quality Issue created a demand for increase maintenance cost. </li></ul><ul><li>Tracked issue and recovery </li></ul>
  6. 6. Task Accountability (Daily Walk Around)
  7. 7. Median Order Cycle Time 2011 Target = 3 days October 2011 Results = 3 days Kiazan Event Define – Measure - Analyze <ul><li>KJ Analysis (DMAIC) </li></ul><ul><ul><li>Defined Issue(s) </li></ul></ul><ul><ul><li>Measured </li></ul></ul><ul><ul><li>Analyzed </li></ul></ul><ul><ul><li>Improved </li></ul></ul><ul><ul><li>Control </li></ul></ul>
  8. 8. Career Highlights <ul><li>Star Precision </li></ul><ul><ul><li>Drove year to year sales increase from 13M to 21M. </li></ul></ul><ul><ul><li>Negotiated and developed relationships with tier 1 contract manufactures and OEM’s including Celestica, Benchmark, Harley Davidson, and Mark IV. </li></ul></ul><ul><li>Carsan Engineering </li></ul><ul><ul><li>Improved supply plan by developing short term and long term strategy for mfg. operations. </li></ul></ul><ul><ul><li>Setup lean operation in PCB production department to level load operation and improve overall efficiency. </li></ul></ul><ul><li>USMC </li></ul><ul><ul><li>Quality Control Inspector – Responsible for approval of Aircraft Launch. </li></ul></ul>

×