IRJET- Building Information Modeling in AEC Industry with its Implementation and Execution on a Pilot Project

https://www.irjet.net/archives/V6/i6/IRJET-V6I689.pdf

1 of 8
Download to read offline
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 06 | June 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 428
BUILDING INFORMATION MODELING IN AEC INDUSTRY WITH ITS
IMPLEMENTATION AND EXECUTION ON A PILOT PROJECT
Abdul Ahad1, Vikas Kataria2
1Student, Department of Civil Engineering, Dr. Akhilesh Das Gupta Institute of Technology & Management,
New Delhi, India
2Assistant Professor, Department of Civil Engineering, Dr. Akhilesh Das Gupta Institute of Technology &
Management, New Delhi, India
----------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - The following case study shows how BIM
enhances the conventional and traditional design,
scheduling and cost estimating methods with a more
reliable and self-operating technology. Based on the
information obtained, evolution of BIM in AEC industry
and the case study, the work finds out that these are the
areas of potential development and enhancement in the
near future: i) The process of BIM will be more automated
and simplified with virtual reality, software algorithms,
artificial intelligence and robotic construction coming into
existence ii) linking sustainability and energy analysis
parameters to BIM delivered projects in the construction
and design of building model to deliver an energy efficient
structure , and iii) with the development and allocation of
resources for 7D BIM technology one can expect simplified
and quick parts replacement, optimised compliance and to
derestrict BIM as an initial design stage process to a
extensive exercise through an entire facility life cycle.
Keywords - BIM, modelling, designing, analysis,
construction scheduling, cost and time estimation.
1 – INTRODUCTION
BIM (Building Information Modeling) is an intelligent 3D
model-based process that gives architecture,
engineering, and construction (AEC) professionals the
insight and tools to more efficiently plan, design,
construct, and manage buildings and infrastructure. Due
to numerous steps of construction industry and its
complicated and extensive structure, errors and reworks
often might happen in this section. As such, BIM
(Building Information Modeling) is regarded as a
beneficial tool in minimizing the waste and improving
the efficiency of building construction. In other words ,
BIM can be used by engineers ,architects, project
managers etc. in order to achieve these goals :To
decrease design errors, To reduce clash detection, To
boost the integration of cost and time, To improve the
integration of design and construction phase, To increase
the collaboration between different construction
sections and finally to improve recycling.
Building Information Modeling has been part of the
construction industry for some time now. It is the
process of designing a building collaboratively using one
coherent system of computer models rather than as
separate sets of drawings. BIM is now getting applied to
all types of construction, be it buildings, roads, railways,
bridges, tunnels etc. Today, we can even apply it to
different stages of construction such as planning, design,
construction and maintenance. BIM does not solely refer
to buildings, but to all sectors that have to do with
construction including: roads, railways, utilities, bridges,
tunnels, structures, architecture, topography etc.
Information is the heart of Building Information
Modeling. BIM changes the way information regarding
the entire life cycle of a project and its parts is managed
and exchanged. Making available both visual and non-
visual information related to every aspect of
construction, BIM enables designers, engineers, builders,
manufacturers and owners gain a thorough
understanding of a project much before its actual
construction, thus enabling timely refinement, avoiding
errors and generating efficiency .We can easily say that
the M in Building Information Modeling stands for Model
and Management. Using Building Information Modeling,
not only a simplified version of an object, structure,
building or construction is modelled, but also the process
of construction is organized and controlled more
effectively.
Be it project management, land surveying, road design,
structure design or construction- the role of Building
Information Modeling has almost become indispensable
for beyond the ordinary results. Using BIM, owners can
improve building quality, significantly reduce building
lifecycle costs, better understand design projects from
beginning to end, optimize operational efficiencies and
increase occupancy and use rates.
In construction, Building Information Modeling could
be used to monitor the productivity of a construction
process. BIM brings the opportunity to try out solutions
in advance before building the structure on site: with a
constructible model, the structure can be prototyped
virtually. Project parties can understand and review the
design more easily, which helps guarantee its accuracy
and completeness, and visualize and evaluate
alternatives in terms of cost and other project
parameters. BIM leads to better communication between
project parties and better quality. Building Information
Modeling refers to a collaborative method of working
which is based on the generation and exchange of data
and information between the various project parties. For
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 06 | June 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 429
effective functioning, BIM requires integration of the
following five elements: Processes, Policies, People,
Information and Technologies Processes refer to the
specific order of work activities with a beginning, an end,
and a clear identification of the inputs and outputs of
each stage. Policies refer to the principles and rules to
guide the decision-making process. Policies are framed to
develop standards and best practices to minimize
disputes between the parties involved. People make the
difference and therefore are the most important.
Effective management by people can only lead to
successful BIM. Important people in Building Information
Modeling usually include: BIM director, BIM manager,
BIM consultant, BIM technologist.
2 – LITERATURE REVIEW
A number of studies have been done by researchers in
the past to study the impact of BIM on the construction
industry. Piyush Sharma, Sakshi Gupta [1], at American
journal of engineering studied how Building Information
Modeling (BIM) has evolved over the years and how it
has impacted the Indian construction industry also its
future in the Indian built environment sector.
Saeed Raza Mohandas and Hossein omranny [3] studied
how BIM is beneficial for minimising waste and
increasing efficiency of building construction. Also it
enlightens upon the importance of BIM for architecture,
engineers and construction professionals and how it can
be used by architects, project managers, modelers etc.
Jenifer Whyte [4] previously looked upon the
international research and how the work relates to and
inform changes in policy. The paper looked upon the
status of BIM in UK and how to implement BIM in public
procurement. The research also included research
challenges, contribution to practice and future research
opportunities.
Debases Sarkar and Raj Modi [5] research the use of BIM
in the real estate industry of Ahmedabad and its use in
process involving MEP (mechanical, electrical and
plumbing) professionals along with possible conflicts
between building systems. The 3D models developed
with Revit 2015 software would reduce co-ordination
problems amongst the architects, structural engineers,
contractors etc.
Frida Krantz [6] studied BIM in production phase of civil
works since people are reluctant in using BIM in the
production phase of construction projects. The purpose
of the study is therefore to investigate driving forces
behind the use of BIM and the resistors against it and to
investigate in what ways BIM could be used in the
production phase.
The main objective of this project is to understand the
concept and methodology of Building Information
modeling (BIM) and then determine its impact and
influence on the architecture, engineering and
construction industry in the present scenario.
3 - METHODOLOGY
3.1. PILOT PROJECT CAD FILE
The initial step of the project in the beginning was to get
a site plan of project made in the conventional CAD
format.
The following plan in Fig 1 is a CAD file of the project on
which the implementation, execution of BIM was to be
done. It was treated as a pilot project for further design,
Analysis and planning.
Fig 1: CAD plan of pilot project
3.2. LEVEL 1 FLOOR PLAN
The above plan was then drafted upon the Revit software
and the following plan was made at level 1. The below
plan in the Fig 2 is of the ground level or base level of the
pilot project modified on Revit 2018. It is the level 1 floor
plan of the construction site.
Fig 2: Level 1 floor plan
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 06 | June 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 430
3.3. LEVEL 2 FLOOR PLAN
Roof of the ground floor was made at level 2 and the
beams, walls, doors and windows were constructed
along with the mumty on the roof .The below plan in the
Fig 3 shows the floor plan of the level 2 of the
construction site.
Fig 3: level 2 floor plan
3.4. LEVEL 3 FLOOR PLAN
The roof of the mumty was placed at level 3 of the site
and the roof of the house was further enhanced by
adding railing to it .The following plan in the Fig 4 shows
the level 3 floor plan of the construction site from the top
view of the same.
Fig 4: Level 3 floor plan
3.5. SITE PLAN
The top view of the site was checked and further objects
such as trees, grass and boundary of the site was place
and was checked for placing errors from the top view
.The following Fig 5 shows the top view of the whole
construction site.
Fig 5: Site plan
3.6. ELEVATION PLAN
The elevation of all the levels were checked from the
ground floor to its roof and mumty roof level .The below
Fig 6 shows the elevation plan consisting of the elevation
of the site namely level 1, level 2, level 3 from the side
view.
Fig 6: Elevation of Site
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 06 | June 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 431
3.7. REALISTIC 3D VIEW OF SITE
The realistic view of the site was take into account and
Checked for any errors .The following Fig 7 shows the
realistic view of the site in 3 dimensions.
Fig 7: Realistic 3D view of site
4 – MODEL RESULTS AND ANALYSIS
The project is a frame structure consisting of a
residential house of one floor. The building consist of a
ground floor having space for living room, lobby area,
Bathroom, Bedroom, Terrace Floor and Mumty on
terrace just above the staircase level. In front of the
building there is lawn area and there is ramp which
connected with the parking area for parking purpose.
Staircase is provided from lobby area up to the terrace
level through the mumty. Revit works exactly opposite to
AutoCAD. In AutoCAD, first to draw 2D drawing and then
move towards 3D (Not BIM). In Revit first to create direct
3D model and then get directly 2D drawing with material
quantity and many more which is essential to manage
construction of building. In the present work it is created
3D model and able to get 2D drawing as shown below
and material quantity as per the requirements. The
schedule of door, window, room, wall material and beam
is tabulated. The solar study and shadow analysis of site
is done from sunrise to sunset. A Gantt chart was
produce in navisworks representing the various works to
be carried out along with the timeline of each process.
Once the timeline of the project was completed along
with the Gantt chart a video representing all the task and
processes to be carried out was developed. This process
of construction along with the timeline of the project is
called as stimulation and the video comprises of this
process.
4.1. SPACE PLANNING OF GROUND FLOOR
The planning of various rooms in the house was done
according to the standards and the bathrooms, WC, space
was also highlighted. The following Fig 8 is the pictorial
representation of the ground floor of the house with
various sections of the house clearly mentioned and
highlighted.
Fig 8: Space planning
4.2. TOP SECTION VIEW
The realistic section view of the site was made and all the
interiors walls, staircase were checked. The below Fig 9
shows the realistic section view of the site from the top.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 06 | June 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 432
Fig 9: Realistic Section view of site
4.3. SCHEDULING OF VARIOUS MEMBER OF SITE
4.3.1. DOOR SCHEDULE
The following Table 1 shows the schedule of doors to be
inserted in the project along with their dimensions and
count.
Table 1: Door schedule
DOORSCHEDULE
Name Count Level Height Width
M_Single-Flush:0915x2134mm 1 Level1 2134 915
M_Single-Flush:0915x2134mm 1 Level1 2134 915
M_Single-Flush:0915x2134mm 1 Level1 2134 915
M_Single-Flush:0915x2134mm 1 Level1 2134 915
M_Single-Flush:0915x2134mm 1 Level1 2134 915
M_Door-Opening:0915x2134mm 1 Level2 0 0
M_Single-Flush:0762x2032mm 1 Level1 2032 762
M_Single-Flush:0813x2134mm 1 Level1 2134 813
M_Single-Flush:0813x2134mm 1 Level1 2134 813
4.3.2. WINDOW SCHEDULE
The following Table 2 shows the schedule of windows
along with their level and dimensions.
Table 2: Window schedule
WindowSchedule
FamilyandType Level Width Height SillHeight
M_Window-Casement-Triple-Awning-Triple:2150x1500mm Level1 2150 1500 900
M_Window-Casement-Double:850x1500mm Level1 850 1500 900
M_Window-Casement-Triple-Awning-Triple:2150x1500mm Level1 2150 1500 900
M_Fixed:0406x1220mm Level1 406 1220 915
M_Fixed:0406x1220mm Level1 406 1220 915
M_Window-Casement-Triple-Awning-Triple:2150x1500mm Level1 2150 1500 900
4.3.3. ROOM SCHEDULE
The following Table 3 shows the schedule of the rooms
with their level and dimensions.
Table 3: Room schedule
Room Schedule
Name Level Area
Living Room Level 1 21 m²
Bed Room Level 1 17 m²
Bathroom Level 1 10 m²
WC Level 1 2 m²
Kitchen Level 1 18 m²
Lobby Area Level 1 29 m²
WC and Bathroom Level 1 6 m²
4.3.4. BEAM SCHEDULE
The following Table 4 shows the schedule of the
structural frame or beams along with their volume,
length and count.
Table 4: Schedule of Beams
StructuralFramingSchedule
FamilyandType Volume Length Count
M_Concrete-RectangularBeam:450x600mm2 3.75m³ 15200 1
M_Concrete-RectangularBeam:450x600mm2 2.02m³ 8555 1
M_Concrete-RectangularBeam:450x600mm2 1.08m³ 4324 1
M_Concrete-RectangularBeam:450x600mm2 2.39m³ 9264 1
M_Concrete-RectangularBeam:450x600mm2 1.01m³ 4199 1
M_Concrete-RectangularBeam:450x600mm2 1.00m³ 4117 1
M_Concrete-RectangularBeam:450x600mm2 3.23m³ 13255 1
M_Concrete-RectangularBeam:450x600mm2 1.99m³ 8471 1
M_Concrete-RectangularBeam:450x600mm2 1.53m³ 6326 1
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 06 | June 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 433
4.3.5. WALL MATERIAL SCHEDULE
The below Table 5 shows the schedule of the wall with its
volume, breadth, area and height.
Table 5: Wall material Schedule
WallMaterialTakeoff
FamilyandType Material:Area Volume Width Area
BasicWall:Generic-120mm2
BasicWall:Generic-120mm2 3m² 0.35m³ 120 3m²
BasicWall:Generic-120mm2 6m² 0.72m³ 120 6m²
BasicWall:Generic-200mm
BasicWall:Generic-200mm 43m² 8.54m³ 200 43m²
BasicWall:Generic-200mm 10m² 1.99m³ 200 10m²
BasicWall:Generic-200mm 11m² 2.13m³ 200 11m²
BasicWall:Generic-200mm 14m² 2.85m³ 200 14m²
BasicWall:Generic-200mm 21m² 4.16m³ 200 21m²
BasicWall:Generic-200mm 7m² 1.36m³ 200 7m²
BasicWall:Generic-200mm 13m² 2.52m³ 200 13m²
BasicWall:Generic-200mm 15m² 2.94m³ 200 15m²
BasicWall:Generic-200mm 21m² 4.23m³ 200 21m²
BasicWall:Generic-200mm 19m² 3.74m³ 200 19m²
BasicWall:Generic-200mm 13m² 2.69m³ 200 13m²
BasicWall:Generic-200mm 4m² 0.83m³ 200 4m²
BasicWall:Generic-200mm 14m² 2.84m³ 200 14m²
BasicWall:Generic-200mm 43m² 8.65m³ 200 43m²
BasicWall:Generic-200mm 4m² 0.82m³ 200 4m²
BasicWall:Generic-200mm 14m² 2.84m³ 200 14m²
BasicWall:Generic-200mm 2m² 0.40m³ 200 2m²
BasicWall:Generic-200mm 12m² 2.48m³ 200 12m²
BasicWall:Generic-200mm 7m² 1.35m³ 200 7m²
BasicWall:Generic-200mm 12m² 2.38m³ 200 12m²
BasicWall:Generic-200mm 4m² 0.85m³ 200 4m²
BasicWall:Generic-200mm 16m² 3.10m³ 200 16m²
Grandtotal:24
4.4. SOLAR STUDY AND SHADOW ANALYSIS
The solar study and shadow analysis of the project was
done and the following results were obtained .The Fig 10
below is a drop box that shows the various values to be
entered for the analysis like the date, Location of the
project, time of the project , no. of frames etc. The various
results of the shadow analysis at various intervals of time
are illustrated in the below mentioned figures. The Fig
11 Fig 12, Fig 13, Fig 14 and Fig 15 exhibits the shadow
on the site during sunrise, at 09:00 IST , 14:00 IST , 17:00
IST and at sunset respectively.
Fig 10: Sun settings drop box
Fig 11: Shadow at 05:27(sunrise)
Fig 12: Shadow at 09:00

Recommended

IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...IRJET-  	  Testing Practical Applicability of 5-Dimensional BIM using a Pilot...
IRJET- Testing Practical Applicability of 5-Dimensional BIM using a Pilot...IRJET Journal
 
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
 
Building Information Modeling (BIM) Research Paper
Building Information Modeling (BIM) Research PaperBuilding Information Modeling (BIM) Research Paper
Building Information Modeling (BIM) Research Paperabhishek chougule
 
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...Omer Syed - The Integration of BIM in Construction Organizations & its Impact...
Omer Syed - The Integration of BIM in Construction Organizations & its Impact...Omer Syed
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectMANNU KUMAR
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...IRJET Journal
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bimkarim ead
 

More Related Content

What's hot

A STUDY ON BIM ADOPTION
A STUDY ON BIM ADOPTIONA STUDY ON BIM ADOPTION
A STUDY ON BIM ADOPTIONSubhendu Datta
 
Delivering Projects Better with BIM
Delivering Projects Better with BIMDelivering Projects Better with BIM
Delivering Projects Better with BIMAlex Ferguson
 
The Collaborative Power of BIM
The Collaborative Power of BIMThe Collaborative Power of BIM
The Collaborative Power of BIMMarc Goldman
 
BIM Uses In Design
BIM Uses In DesignBIM Uses In Design
BIM Uses In Designnevena_psu
 
Bim implementation
Bim implementationBim implementation
Bim implementationOmar Selim
 
AUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_PresentationAUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_PresentationAhmad Balawi
 
BIM For Building Product Manufacturers
BIM For Building Product ManufacturersBIM For Building Product Manufacturers
BIM For Building Product Manufacturersguest3ce637
 
Construction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DConstruction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DYee Len Wan
 
Building information modeling & value to the AEC industry Part 2
Building information modeling &  value to the AEC industry   Part 2Building information modeling &  value to the AEC industry   Part 2
Building information modeling & value to the AEC industry Part 2Stephen Au
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwaresRuchy Lakhani
 
Role of Building Information Modelling in Construction
Role of Building Information Modelling in ConstructionRole of Building Information Modelling in Construction
Role of Building Information Modelling in ConstructionAbhijeet Kulkarni
 
Bim for owners deck final
Bim for owners deck final Bim for owners deck final
Bim for owners deck final JerrySanon
 
IRJET- Building Information Modeling (BIM) Survey in Surat,Gujarat
IRJET-  	  Building Information Modeling (BIM) Survey in Surat,GujaratIRJET-  	  Building Information Modeling (BIM) Survey in Surat,Gujarat
IRJET- Building Information Modeling (BIM) Survey in Surat,GujaratIRJET Journal
 
The impact of ict in quantity surveying
The impact of ict in quantity surveyingThe impact of ict in quantity surveying
The impact of ict in quantity surveyingSolomon Rex Borchers
 
iBIM and Knowledge Management
iBIM and Knowledge ManagementiBIM and Knowledge Management
iBIM and Knowledge ManagementBe2camp Admin
 
BIM, Adoption, Implementation and Future
BIM, Adoption, Implementation and FutureBIM, Adoption, Implementation and Future
BIM, Adoption, Implementation and FutureIJERDJOURNAL
 

What's hot (19)

BIM
BIM BIM
BIM
 
A STUDY ON BIM ADOPTION
A STUDY ON BIM ADOPTIONA STUDY ON BIM ADOPTION
A STUDY ON BIM ADOPTION
 
Introduction to Building Information Modeling
Introduction to Building Information Modeling Introduction to Building Information Modeling
Introduction to Building Information Modeling
 
Delivering Projects Better with BIM
Delivering Projects Better with BIMDelivering Projects Better with BIM
Delivering Projects Better with BIM
 
The Collaborative Power of BIM
The Collaborative Power of BIMThe Collaborative Power of BIM
The Collaborative Power of BIM
 
BIM Uses In Design
BIM Uses In DesignBIM Uses In Design
BIM Uses In Design
 
BIM Report 3
BIM Report 3BIM Report 3
BIM Report 3
 
Bim implementation
Bim implementationBim implementation
Bim implementation
 
AUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_PresentationAUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_Presentation
 
BIM For Building Product Manufacturers
BIM For Building Product ManufacturersBIM For Building Product Manufacturers
BIM For Building Product Manufacturers
 
Construction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DConstruction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7D
 
Building information modeling & value to the AEC industry Part 2
Building information modeling &  value to the AEC industry   Part 2Building information modeling &  value to the AEC industry   Part 2
Building information modeling & value to the AEC industry Part 2
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwares
 
Role of Building Information Modelling in Construction
Role of Building Information Modelling in ConstructionRole of Building Information Modelling in Construction
Role of Building Information Modelling in Construction
 
Bim for owners deck final
Bim for owners deck final Bim for owners deck final
Bim for owners deck final
 
IRJET- Building Information Modeling (BIM) Survey in Surat,Gujarat
IRJET-  	  Building Information Modeling (BIM) Survey in Surat,GujaratIRJET-  	  Building Information Modeling (BIM) Survey in Surat,Gujarat
IRJET- Building Information Modeling (BIM) Survey in Surat,Gujarat
 
The impact of ict in quantity surveying
The impact of ict in quantity surveyingThe impact of ict in quantity surveying
The impact of ict in quantity surveying
 
iBIM and Knowledge Management
iBIM and Knowledge ManagementiBIM and Knowledge Management
iBIM and Knowledge Management
 
BIM, Adoption, Implementation and Future
BIM, Adoption, Implementation and FutureBIM, Adoption, Implementation and Future
BIM, Adoption, Implementation and Future
 

Similar to IRJET- Building Information Modeling in AEC Industry with its Implementation and Execution on a Pilot Project

IRJET - Digital Engineering & Project Management for AEC Industry using BIM
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
 
An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...IRJET Journal
 
Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch...
Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch...Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch...
Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch...IRJET Journal
 
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit ModelIRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit ModelIRJET Journal
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET Journal
 
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...IRJET Journal
 
Building Information Modelling in Sustainability Analysis
Building Information Modelling in Sustainability AnalysisBuilding Information Modelling in Sustainability Analysis
Building Information Modelling in Sustainability AnalysisIRJET Journal
 
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET Journal
 
Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...IRJET Journal
 
Role of building information modelling bim in quantity surveying practice
Role of building information modelling bim in quantity surveying practiceRole of building information modelling bim in quantity surveying practice
Role of building information modelling bim in quantity surveying practiceIAEME Publication
 
A Research Study Done On The Adaptation Of Building Information Modelling In ...
A Research Study Done On The Adaptation Of Building Information Modelling In ...A Research Study Done On The Adaptation Of Building Information Modelling In ...
A Research Study Done On The Adaptation Of Building Information Modelling In ...Jessica Henderson
 
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET Journal
 
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGREAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGIRJET Journal
 
Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...IRJET Journal
 
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET-  	  Redevelopment of Structure with the Help of Building Information M...IRJET-  	  Redevelopment of Structure with the Help of Building Information M...
IRJET- Redevelopment of Structure with the Help of Building Information M...IRJET Journal
 
Building Information Modelling Technology For Risk Analysis And Mitigation: A...
Building Information Modelling Technology For Risk Analysis And Mitigation: A...Building Information Modelling Technology For Risk Analysis And Mitigation: A...
Building Information Modelling Technology For Risk Analysis And Mitigation: A...IRJET Journal
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling reportKiran Birdi
 

Similar to IRJET- Building Information Modeling in AEC Industry with its Implementation and Execution on a Pilot Project (20)

IRJET - Digital Engineering & Project Management for AEC Industry using BIM
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
 
An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...An Execution of Building Information Modelling for Factories and Warehouse Pr...
An Execution of Building Information Modelling for Factories and Warehouse Pr...
 
Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch...
Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch...Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch...
Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch...
 
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit ModelIRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
 
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
 
Building Information Modelling in Sustainability Analysis
Building Information Modelling in Sustainability AnalysisBuilding Information Modelling in Sustainability Analysis
Building Information Modelling in Sustainability Analysis
 
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
 
BIM Assignment.doc
BIM Assignment.docBIM Assignment.doc
BIM Assignment.doc
 
Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...
 
Building Information Model
Building Information ModelBuilding Information Model
Building Information Model
 
Role of building information modelling bim in quantity surveying practice
Role of building information modelling bim in quantity surveying practiceRole of building information modelling bim in quantity surveying practice
Role of building information modelling bim in quantity surveying practice
 
A Research Study Done On The Adaptation Of Building Information Modelling In ...
A Research Study Done On The Adaptation Of Building Information Modelling In ...A Research Study Done On The Adaptation Of Building Information Modelling In ...
A Research Study Done On The Adaptation Of Building Information Modelling In ...
 
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building ProjectIRJET- 4D Simulation of MEP using Bim for Residential Building Project
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
 
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLINGREAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
 
Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...Integrating Project Management Information System and BIM for Inspecting and ...
Integrating Project Management Information System and BIM for Inspecting and ...
 
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET-  	  Redevelopment of Structure with the Help of Building Information M...IRJET-  	  Redevelopment of Structure with the Help of Building Information M...
IRJET- Redevelopment of Structure with the Help of Building Information M...
 
Building Information Modelling Technology For Risk Analysis And Mitigation: A...
Building Information Modelling Technology For Risk Analysis And Mitigation: A...Building Information Modelling Technology For Risk Analysis And Mitigation: A...
Building Information Modelling Technology For Risk Analysis And Mitigation: A...
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling report
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 
Solving Linear Differential Equations with Constant Coefficients
Solving Linear Differential Equations with Constant CoefficientsSolving Linear Differential Equations with Constant Coefficients
Solving Linear Differential Equations with Constant CoefficientsIRJET Journal
 
Assessment of outdoor spaces like corridors and courtyards in a school enviro...
Assessment of outdoor spaces like corridors and courtyards in a school enviro...Assessment of outdoor spaces like corridors and courtyards in a school enviro...
Assessment of outdoor spaces like corridors and courtyards in a school enviro...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 
Solving Linear Differential Equations with Constant Coefficients
Solving Linear Differential Equations with Constant CoefficientsSolving Linear Differential Equations with Constant Coefficients
Solving Linear Differential Equations with Constant Coefficients
 
Assessment of outdoor spaces like corridors and courtyards in a school enviro...
Assessment of outdoor spaces like corridors and courtyards in a school enviro...Assessment of outdoor spaces like corridors and courtyards in a school enviro...
Assessment of outdoor spaces like corridors and courtyards in a school enviro...
 

Recently uploaded

Introduction to Machine Learning Unit-1 Notes for II-II Mechanical Engineerin...
Introduction to Machine Learning Unit-1 Notes for II-II Mechanical Engineerin...Introduction to Machine Learning Unit-1 Notes for II-II Mechanical Engineerin...
Introduction to Machine Learning Unit-1 Notes for II-II Mechanical Engineerin...C Sai Kiran
 
chap. 3. lipid deterioration oil and fat processign
chap. 3. lipid deterioration oil and fat processignchap. 3. lipid deterioration oil and fat processign
chap. 3. lipid deterioration oil and fat processignteddymebratie
 
Pointers and Array, pointer and String.pptx
Pointers and Array, pointer and String.pptxPointers and Array, pointer and String.pptx
Pointers and Array, pointer and String.pptxAnanthi Palanisamy
 
Chapter 1 - Drilling Fluid Functions GR.ppt
Chapter 1 - Drilling Fluid Functions GR.pptChapter 1 - Drilling Fluid Functions GR.ppt
Chapter 1 - Drilling Fluid Functions GR.pptzeidali3
 
Energy Efficient Social Housing for One Manchester
Energy Efficient Social Housing for One ManchesterEnergy Efficient Social Housing for One Manchester
Energy Efficient Social Housing for One Manchestermark alegbe
 
GDSC Web Bootcamp - Day - 2 - JavaScript
GDSC Web Bootcamp -  Day - 2   - JavaScriptGDSC Web Bootcamp -  Day - 2   - JavaScript
GDSC Web Bootcamp - Day - 2 - JavaScriptSahithiGurlinka
 
CHAPTER 1_ HTML and CSS Introduction Module
CHAPTER 1_ HTML and CSS Introduction ModuleCHAPTER 1_ HTML and CSS Introduction Module
CHAPTER 1_ HTML and CSS Introduction Modulessusera4f8281
 
Deluck Technical Works Company Profile.pdf
Deluck Technical Works Company Profile.pdfDeluck Technical Works Company Profile.pdf
Deluck Technical Works Company Profile.pdfartpoa9
 
INTERACTIVE AQUATIC MUSEUM AT BAGH IBN QASIM CLIFTON KARACHI
INTERACTIVE AQUATIC MUSEUM AT BAGH IBN QASIM CLIFTON KARACHIINTERACTIVE AQUATIC MUSEUM AT BAGH IBN QASIM CLIFTON KARACHI
INTERACTIVE AQUATIC MUSEUM AT BAGH IBN QASIM CLIFTON KARACHIKiranKandhro1
 
Model Approved Food/ sanitary Grade Flow Meter
Model Approved Food/ sanitary Grade Flow MeterModel Approved Food/ sanitary Grade Flow Meter
Model Approved Food/ sanitary Grade Flow MeterManasMicrosystems
 
Center Enamel is the leading fire water tanks manufacturer in China.docx
Center Enamel is the leading fire water tanks manufacturer in China.docxCenter Enamel is the leading fire water tanks manufacturer in China.docx
Center Enamel is the leading fire water tanks manufacturer in China.docxsjzzztc
 
ExtraordinAIre Monthly Newsletter Jan 2024
ExtraordinAIre Monthly Newsletter Jan 2024ExtraordinAIre Monthly Newsletter Jan 2024
ExtraordinAIre Monthly Newsletter Jan 2024Savipriya Raghavendra
 
MedTech R&D - Tamer Emara - resume @2024
MedTech R&D - Tamer Emara - resume @2024MedTech R&D - Tamer Emara - resume @2024
MedTech R&D - Tamer Emara - resume @2024Tamer Emara
 
Microservices: Benefits, drawbacks and are they for me?
Microservices: Benefits, drawbacks and are they for me?Microservices: Benefits, drawbacks and are they for me?
Microservices: Benefits, drawbacks and are they for me?Marian Marinov
 
Basic Concepts of Material Science for Electrical and Electronic Materials ...
Basic Concepts of Material Science for  Electrical and Electronic Materials  ...Basic Concepts of Material Science for  Electrical and Electronic Materials  ...
Basic Concepts of Material Science for Electrical and Electronic Materials ...PeopleFinder
 
Architectural Preservation - Heritage, focused on Saudi Arabia
Architectural Preservation - Heritage, focused on Saudi ArabiaArchitectural Preservation - Heritage, focused on Saudi Arabia
Architectural Preservation - Heritage, focused on Saudi ArabiaIgnacio J. Palma, Arch PhD.
 
Introduction about Technology roadmap for Industry 4.0
Introduction about Technology roadmap for Industry 4.0Introduction about Technology roadmap for Industry 4.0
Introduction about Technology roadmap for Industry 4.0RaishKhanji
 
Nexus - Final Day 12th February 2024.pptx
Nexus - Final Day 12th February 2024.pptxNexus - Final Day 12th February 2024.pptx
Nexus - Final Day 12th February 2024.pptxRohanAgarwal340656
 
CDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdfCDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdf8-koi
 

Recently uploaded (20)

Introduction to Machine Learning Unit-1 Notes for II-II Mechanical Engineerin...
Introduction to Machine Learning Unit-1 Notes for II-II Mechanical Engineerin...Introduction to Machine Learning Unit-1 Notes for II-II Mechanical Engineerin...
Introduction to Machine Learning Unit-1 Notes for II-II Mechanical Engineerin...
 
chap. 3. lipid deterioration oil and fat processign
chap. 3. lipid deterioration oil and fat processignchap. 3. lipid deterioration oil and fat processign
chap. 3. lipid deterioration oil and fat processign
 
Pointers and Array, pointer and String.pptx
Pointers and Array, pointer and String.pptxPointers and Array, pointer and String.pptx
Pointers and Array, pointer and String.pptx
 
Chapter 1 - Drilling Fluid Functions GR.ppt
Chapter 1 - Drilling Fluid Functions GR.pptChapter 1 - Drilling Fluid Functions GR.ppt
Chapter 1 - Drilling Fluid Functions GR.ppt
 
Energy Efficient Social Housing for One Manchester
Energy Efficient Social Housing for One ManchesterEnergy Efficient Social Housing for One Manchester
Energy Efficient Social Housing for One Manchester
 
GDSC Web Bootcamp - Day - 2 - JavaScript
GDSC Web Bootcamp -  Day - 2   - JavaScriptGDSC Web Bootcamp -  Day - 2   - JavaScript
GDSC Web Bootcamp - Day - 2 - JavaScript
 
CHAPTER 1_ HTML and CSS Introduction Module
CHAPTER 1_ HTML and CSS Introduction ModuleCHAPTER 1_ HTML and CSS Introduction Module
CHAPTER 1_ HTML and CSS Introduction Module
 
Deluck Technical Works Company Profile.pdf
Deluck Technical Works Company Profile.pdfDeluck Technical Works Company Profile.pdf
Deluck Technical Works Company Profile.pdf
 
INTERACTIVE AQUATIC MUSEUM AT BAGH IBN QASIM CLIFTON KARACHI
INTERACTIVE AQUATIC MUSEUM AT BAGH IBN QASIM CLIFTON KARACHIINTERACTIVE AQUATIC MUSEUM AT BAGH IBN QASIM CLIFTON KARACHI
INTERACTIVE AQUATIC MUSEUM AT BAGH IBN QASIM CLIFTON KARACHI
 
Model Approved Food/ sanitary Grade Flow Meter
Model Approved Food/ sanitary Grade Flow MeterModel Approved Food/ sanitary Grade Flow Meter
Model Approved Food/ sanitary Grade Flow Meter
 
Center Enamel is the leading fire water tanks manufacturer in China.docx
Center Enamel is the leading fire water tanks manufacturer in China.docxCenter Enamel is the leading fire water tanks manufacturer in China.docx
Center Enamel is the leading fire water tanks manufacturer in China.docx
 
ExtraordinAIre Monthly Newsletter Jan 2024
ExtraordinAIre Monthly Newsletter Jan 2024ExtraordinAIre Monthly Newsletter Jan 2024
ExtraordinAIre Monthly Newsletter Jan 2024
 
MedTech R&D - Tamer Emara - resume @2024
MedTech R&D - Tamer Emara - resume @2024MedTech R&D - Tamer Emara - resume @2024
MedTech R&D - Tamer Emara - resume @2024
 
Microservices: Benefits, drawbacks and are they for me?
Microservices: Benefits, drawbacks and are they for me?Microservices: Benefits, drawbacks and are they for me?
Microservices: Benefits, drawbacks and are they for me?
 
Basic Concepts of Material Science for Electrical and Electronic Materials ...
Basic Concepts of Material Science for  Electrical and Electronic Materials  ...Basic Concepts of Material Science for  Electrical and Electronic Materials  ...
Basic Concepts of Material Science for Electrical and Electronic Materials ...
 
Architectural Preservation - Heritage, focused on Saudi Arabia
Architectural Preservation - Heritage, focused on Saudi ArabiaArchitectural Preservation - Heritage, focused on Saudi Arabia
Architectural Preservation - Heritage, focused on Saudi Arabia
 
Introduction about Technology roadmap for Industry 4.0
Introduction about Technology roadmap for Industry 4.0Introduction about Technology roadmap for Industry 4.0
Introduction about Technology roadmap for Industry 4.0
 
AC DISTRIBUTION - ELECTRICAL POWER SYSTEM
AC DISTRIBUTION - ELECTRICAL POWER SYSTEMAC DISTRIBUTION - ELECTRICAL POWER SYSTEM
AC DISTRIBUTION - ELECTRICAL POWER SYSTEM
 
Nexus - Final Day 12th February 2024.pptx
Nexus - Final Day 12th February 2024.pptxNexus - Final Day 12th February 2024.pptx
Nexus - Final Day 12th February 2024.pptx
 
CDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdfCDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdf
 

IRJET- Building Information Modeling in AEC Industry with its Implementation and Execution on a Pilot Project

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 06 | June 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 428 BUILDING INFORMATION MODELING IN AEC INDUSTRY WITH ITS IMPLEMENTATION AND EXECUTION ON A PILOT PROJECT Abdul Ahad1, Vikas Kataria2 1Student, Department of Civil Engineering, Dr. Akhilesh Das Gupta Institute of Technology & Management, New Delhi, India 2Assistant Professor, Department of Civil Engineering, Dr. Akhilesh Das Gupta Institute of Technology & Management, New Delhi, India ----------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - The following case study shows how BIM enhances the conventional and traditional design, scheduling and cost estimating methods with a more reliable and self-operating technology. Based on the information obtained, evolution of BIM in AEC industry and the case study, the work finds out that these are the areas of potential development and enhancement in the near future: i) The process of BIM will be more automated and simplified with virtual reality, software algorithms, artificial intelligence and robotic construction coming into existence ii) linking sustainability and energy analysis parameters to BIM delivered projects in the construction and design of building model to deliver an energy efficient structure , and iii) with the development and allocation of resources for 7D BIM technology one can expect simplified and quick parts replacement, optimised compliance and to derestrict BIM as an initial design stage process to a extensive exercise through an entire facility life cycle. Keywords - BIM, modelling, designing, analysis, construction scheduling, cost and time estimation. 1 – INTRODUCTION BIM (Building Information Modeling) is an intelligent 3D model-based process that gives architecture, engineering, and construction (AEC) professionals the insight and tools to more efficiently plan, design, construct, and manage buildings and infrastructure. Due to numerous steps of construction industry and its complicated and extensive structure, errors and reworks often might happen in this section. As such, BIM (Building Information Modeling) is regarded as a beneficial tool in minimizing the waste and improving the efficiency of building construction. In other words , BIM can be used by engineers ,architects, project managers etc. in order to achieve these goals :To decrease design errors, To reduce clash detection, To boost the integration of cost and time, To improve the integration of design and construction phase, To increase the collaboration between different construction sections and finally to improve recycling. Building Information Modeling has been part of the construction industry for some time now. It is the process of designing a building collaboratively using one coherent system of computer models rather than as separate sets of drawings. BIM is now getting applied to all types of construction, be it buildings, roads, railways, bridges, tunnels etc. Today, we can even apply it to different stages of construction such as planning, design, construction and maintenance. BIM does not solely refer to buildings, but to all sectors that have to do with construction including: roads, railways, utilities, bridges, tunnels, structures, architecture, topography etc. Information is the heart of Building Information Modeling. BIM changes the way information regarding the entire life cycle of a project and its parts is managed and exchanged. Making available both visual and non- visual information related to every aspect of construction, BIM enables designers, engineers, builders, manufacturers and owners gain a thorough understanding of a project much before its actual construction, thus enabling timely refinement, avoiding errors and generating efficiency .We can easily say that the M in Building Information Modeling stands for Model and Management. Using Building Information Modeling, not only a simplified version of an object, structure, building or construction is modelled, but also the process of construction is organized and controlled more effectively. Be it project management, land surveying, road design, structure design or construction- the role of Building Information Modeling has almost become indispensable for beyond the ordinary results. Using BIM, owners can improve building quality, significantly reduce building lifecycle costs, better understand design projects from beginning to end, optimize operational efficiencies and increase occupancy and use rates. In construction, Building Information Modeling could be used to monitor the productivity of a construction process. BIM brings the opportunity to try out solutions in advance before building the structure on site: with a constructible model, the structure can be prototyped virtually. Project parties can understand and review the design more easily, which helps guarantee its accuracy and completeness, and visualize and evaluate alternatives in terms of cost and other project parameters. BIM leads to better communication between project parties and better quality. Building Information Modeling refers to a collaborative method of working which is based on the generation and exchange of data and information between the various project parties. For
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 06 | June 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 429 effective functioning, BIM requires integration of the following five elements: Processes, Policies, People, Information and Technologies Processes refer to the specific order of work activities with a beginning, an end, and a clear identification of the inputs and outputs of each stage. Policies refer to the principles and rules to guide the decision-making process. Policies are framed to develop standards and best practices to minimize disputes between the parties involved. People make the difference and therefore are the most important. Effective management by people can only lead to successful BIM. Important people in Building Information Modeling usually include: BIM director, BIM manager, BIM consultant, BIM technologist. 2 – LITERATURE REVIEW A number of studies have been done by researchers in the past to study the impact of BIM on the construction industry. Piyush Sharma, Sakshi Gupta [1], at American journal of engineering studied how Building Information Modeling (BIM) has evolved over the years and how it has impacted the Indian construction industry also its future in the Indian built environment sector. Saeed Raza Mohandas and Hossein omranny [3] studied how BIM is beneficial for minimising waste and increasing efficiency of building construction. Also it enlightens upon the importance of BIM for architecture, engineers and construction professionals and how it can be used by architects, project managers, modelers etc. Jenifer Whyte [4] previously looked upon the international research and how the work relates to and inform changes in policy. The paper looked upon the status of BIM in UK and how to implement BIM in public procurement. The research also included research challenges, contribution to practice and future research opportunities. Debases Sarkar and Raj Modi [5] research the use of BIM in the real estate industry of Ahmedabad and its use in process involving MEP (mechanical, electrical and plumbing) professionals along with possible conflicts between building systems. The 3D models developed with Revit 2015 software would reduce co-ordination problems amongst the architects, structural engineers, contractors etc. Frida Krantz [6] studied BIM in production phase of civil works since people are reluctant in using BIM in the production phase of construction projects. The purpose of the study is therefore to investigate driving forces behind the use of BIM and the resistors against it and to investigate in what ways BIM could be used in the production phase. The main objective of this project is to understand the concept and methodology of Building Information modeling (BIM) and then determine its impact and influence on the architecture, engineering and construction industry in the present scenario. 3 - METHODOLOGY 3.1. PILOT PROJECT CAD FILE The initial step of the project in the beginning was to get a site plan of project made in the conventional CAD format. The following plan in Fig 1 is a CAD file of the project on which the implementation, execution of BIM was to be done. It was treated as a pilot project for further design, Analysis and planning. Fig 1: CAD plan of pilot project 3.2. LEVEL 1 FLOOR PLAN The above plan was then drafted upon the Revit software and the following plan was made at level 1. The below plan in the Fig 2 is of the ground level or base level of the pilot project modified on Revit 2018. It is the level 1 floor plan of the construction site. Fig 2: Level 1 floor plan
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 06 | June 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 430 3.3. LEVEL 2 FLOOR PLAN Roof of the ground floor was made at level 2 and the beams, walls, doors and windows were constructed along with the mumty on the roof .The below plan in the Fig 3 shows the floor plan of the level 2 of the construction site. Fig 3: level 2 floor plan 3.4. LEVEL 3 FLOOR PLAN The roof of the mumty was placed at level 3 of the site and the roof of the house was further enhanced by adding railing to it .The following plan in the Fig 4 shows the level 3 floor plan of the construction site from the top view of the same. Fig 4: Level 3 floor plan 3.5. SITE PLAN The top view of the site was checked and further objects such as trees, grass and boundary of the site was place and was checked for placing errors from the top view .The following Fig 5 shows the top view of the whole construction site. Fig 5: Site plan 3.6. ELEVATION PLAN The elevation of all the levels were checked from the ground floor to its roof and mumty roof level .The below Fig 6 shows the elevation plan consisting of the elevation of the site namely level 1, level 2, level 3 from the side view. Fig 6: Elevation of Site
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 06 | June 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 431 3.7. REALISTIC 3D VIEW OF SITE The realistic view of the site was take into account and Checked for any errors .The following Fig 7 shows the realistic view of the site in 3 dimensions. Fig 7: Realistic 3D view of site 4 – MODEL RESULTS AND ANALYSIS The project is a frame structure consisting of a residential house of one floor. The building consist of a ground floor having space for living room, lobby area, Bathroom, Bedroom, Terrace Floor and Mumty on terrace just above the staircase level. In front of the building there is lawn area and there is ramp which connected with the parking area for parking purpose. Staircase is provided from lobby area up to the terrace level through the mumty. Revit works exactly opposite to AutoCAD. In AutoCAD, first to draw 2D drawing and then move towards 3D (Not BIM). In Revit first to create direct 3D model and then get directly 2D drawing with material quantity and many more which is essential to manage construction of building. In the present work it is created 3D model and able to get 2D drawing as shown below and material quantity as per the requirements. The schedule of door, window, room, wall material and beam is tabulated. The solar study and shadow analysis of site is done from sunrise to sunset. A Gantt chart was produce in navisworks representing the various works to be carried out along with the timeline of each process. Once the timeline of the project was completed along with the Gantt chart a video representing all the task and processes to be carried out was developed. This process of construction along with the timeline of the project is called as stimulation and the video comprises of this process. 4.1. SPACE PLANNING OF GROUND FLOOR The planning of various rooms in the house was done according to the standards and the bathrooms, WC, space was also highlighted. The following Fig 8 is the pictorial representation of the ground floor of the house with various sections of the house clearly mentioned and highlighted. Fig 8: Space planning 4.2. TOP SECTION VIEW The realistic section view of the site was made and all the interiors walls, staircase were checked. The below Fig 9 shows the realistic section view of the site from the top.
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 06 | June 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 432 Fig 9: Realistic Section view of site 4.3. SCHEDULING OF VARIOUS MEMBER OF SITE 4.3.1. DOOR SCHEDULE The following Table 1 shows the schedule of doors to be inserted in the project along with their dimensions and count. Table 1: Door schedule DOORSCHEDULE Name Count Level Height Width M_Single-Flush:0915x2134mm 1 Level1 2134 915 M_Single-Flush:0915x2134mm 1 Level1 2134 915 M_Single-Flush:0915x2134mm 1 Level1 2134 915 M_Single-Flush:0915x2134mm 1 Level1 2134 915 M_Single-Flush:0915x2134mm 1 Level1 2134 915 M_Door-Opening:0915x2134mm 1 Level2 0 0 M_Single-Flush:0762x2032mm 1 Level1 2032 762 M_Single-Flush:0813x2134mm 1 Level1 2134 813 M_Single-Flush:0813x2134mm 1 Level1 2134 813 4.3.2. WINDOW SCHEDULE The following Table 2 shows the schedule of windows along with their level and dimensions. Table 2: Window schedule WindowSchedule FamilyandType Level Width Height SillHeight M_Window-Casement-Triple-Awning-Triple:2150x1500mm Level1 2150 1500 900 M_Window-Casement-Double:850x1500mm Level1 850 1500 900 M_Window-Casement-Triple-Awning-Triple:2150x1500mm Level1 2150 1500 900 M_Fixed:0406x1220mm Level1 406 1220 915 M_Fixed:0406x1220mm Level1 406 1220 915 M_Window-Casement-Triple-Awning-Triple:2150x1500mm Level1 2150 1500 900 4.3.3. ROOM SCHEDULE The following Table 3 shows the schedule of the rooms with their level and dimensions. Table 3: Room schedule Room Schedule Name Level Area Living Room Level 1 21 m² Bed Room Level 1 17 m² Bathroom Level 1 10 m² WC Level 1 2 m² Kitchen Level 1 18 m² Lobby Area Level 1 29 m² WC and Bathroom Level 1 6 m² 4.3.4. BEAM SCHEDULE The following Table 4 shows the schedule of the structural frame or beams along with their volume, length and count. Table 4: Schedule of Beams StructuralFramingSchedule FamilyandType Volume Length Count M_Concrete-RectangularBeam:450x600mm2 3.75m³ 15200 1 M_Concrete-RectangularBeam:450x600mm2 2.02m³ 8555 1 M_Concrete-RectangularBeam:450x600mm2 1.08m³ 4324 1 M_Concrete-RectangularBeam:450x600mm2 2.39m³ 9264 1 M_Concrete-RectangularBeam:450x600mm2 1.01m³ 4199 1 M_Concrete-RectangularBeam:450x600mm2 1.00m³ 4117 1 M_Concrete-RectangularBeam:450x600mm2 3.23m³ 13255 1 M_Concrete-RectangularBeam:450x600mm2 1.99m³ 8471 1 M_Concrete-RectangularBeam:450x600mm2 1.53m³ 6326 1
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 06 | June 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 433 4.3.5. WALL MATERIAL SCHEDULE The below Table 5 shows the schedule of the wall with its volume, breadth, area and height. Table 5: Wall material Schedule WallMaterialTakeoff FamilyandType Material:Area Volume Width Area BasicWall:Generic-120mm2 BasicWall:Generic-120mm2 3m² 0.35m³ 120 3m² BasicWall:Generic-120mm2 6m² 0.72m³ 120 6m² BasicWall:Generic-200mm BasicWall:Generic-200mm 43m² 8.54m³ 200 43m² BasicWall:Generic-200mm 10m² 1.99m³ 200 10m² BasicWall:Generic-200mm 11m² 2.13m³ 200 11m² BasicWall:Generic-200mm 14m² 2.85m³ 200 14m² BasicWall:Generic-200mm 21m² 4.16m³ 200 21m² BasicWall:Generic-200mm 7m² 1.36m³ 200 7m² BasicWall:Generic-200mm 13m² 2.52m³ 200 13m² BasicWall:Generic-200mm 15m² 2.94m³ 200 15m² BasicWall:Generic-200mm 21m² 4.23m³ 200 21m² BasicWall:Generic-200mm 19m² 3.74m³ 200 19m² BasicWall:Generic-200mm 13m² 2.69m³ 200 13m² BasicWall:Generic-200mm 4m² 0.83m³ 200 4m² BasicWall:Generic-200mm 14m² 2.84m³ 200 14m² BasicWall:Generic-200mm 43m² 8.65m³ 200 43m² BasicWall:Generic-200mm 4m² 0.82m³ 200 4m² BasicWall:Generic-200mm 14m² 2.84m³ 200 14m² BasicWall:Generic-200mm 2m² 0.40m³ 200 2m² BasicWall:Generic-200mm 12m² 2.48m³ 200 12m² BasicWall:Generic-200mm 7m² 1.35m³ 200 7m² BasicWall:Generic-200mm 12m² 2.38m³ 200 12m² BasicWall:Generic-200mm 4m² 0.85m³ 200 4m² BasicWall:Generic-200mm 16m² 3.10m³ 200 16m² Grandtotal:24 4.4. SOLAR STUDY AND SHADOW ANALYSIS The solar study and shadow analysis of the project was done and the following results were obtained .The Fig 10 below is a drop box that shows the various values to be entered for the analysis like the date, Location of the project, time of the project , no. of frames etc. The various results of the shadow analysis at various intervals of time are illustrated in the below mentioned figures. The Fig 11 Fig 12, Fig 13, Fig 14 and Fig 15 exhibits the shadow on the site during sunrise, at 09:00 IST , 14:00 IST , 17:00 IST and at sunset respectively. Fig 10: Sun settings drop box Fig 11: Shadow at 05:27(sunrise) Fig 12: Shadow at 09:00
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 06 | June 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 434 Fig 13: Shadow at 14:00 Fig 14: Shadow at 17:00 Fig 15: Shadow at 19:07(sunset) 4.5. PROJECT TIMELINE IN NAVISWORKS The navisworks software was used to create a timeline of various works of the project. The following Fig 16 shows the layout of the project timeline. The Fig 17 shows the project timeline and Fig 18 shows Gantt chart of the same. Fig 16: Layout of project timeline Fig 17: Project timeline
  • 8. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 06 | June 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 435 Fig 18: Gantt chart of Project timeline 5 - CONCLUSION The main objective of this project was to understand the concept and methodology of Building Information modeling (BIM) and then determine its impact and influence on the architecture, engineering and construction industry in the present scenario. The BIM implementation and its use in designing, analysis and planning in design and construction firm was taken into consideration and was studied upon. The aspects of Development of BIM and its Future in Indian Construction Industry over the times was looked upon and the aspects due to which BIM is unable to grow in India were taken into considerations and various ideas and techniques were thought of to eradicate these barriers in letting full implementation of BIM in India. A successful case study was done by Designing, Analysis and Planning on a Pilot Project and then observing the various aspects of BIM implementation. The scheduling done in 4D building information modeling and applied in the pilot project helps in better understanding of the components of the project along with their specifications which in turn will reduce the time of construction along with the probability of error and hence will help in reducing the cost to a large extent. Also the timeline formation as per the desired time standards of construction in the project within navisworks software of building information modelling will help in completing the project on time with the required standards which will have a reducing impact on cost to a large extent. The simulation helps in having a perfect idea of the construction works to be carried out along with the timetable of the same and the video of the simulation give a perfect visual representation of the project construction. REFERENCES [1] Piyush Sharma, Sakshi Gupta “Applicability of Building Information Modeling (BIM) in Indian Built Environment Sector”, Sector. American Journal of Engineering and Technology Management, 2016 Vol. 1, No. 3. [2] Alexander Koutamanis “Briefing and Building Information Modelling: Potential for integration”, International Journal of Architectural Computing, 2017, Vol. 15(2) 119 –133. [3] Saeed Reza Mohandes, Hossein Omrany “BUILDING INFORMATION MODELING IN CONSTRUCTION INDUSTRY: REVIEW PAPER” (2013) [4] Jennifer Whyte “Building Information Modelling in 2012:Research Challenges, Contributions, Opportunities”, Design Innovation Research Centre Working Paper, 2012, Vol. 5. [5] Debasis Sarkar, Raj Modi “Applications of Building Information Modeling (BIM) to Real Estate Projects of Ahmedabad”, International Advanced Research Journal in Science, Engineering and Technology, 2015, Vol. 2, Issue. [6] Frida Krantz “Building Information modeling In the production phase of civil works”, Department of Real Estate and Construction Management, 2012 [7] BIM Handbook: A Guide to Building Information Modelling for Owners, Managers, Designers, Engineers and Contractors Hardcover – Import, 28 Mar 2008 by Chuck Eastman (Author), Paul Teicholz (Author), Rafael Sacks (Author), Kathleen Liston (Author). [8] Autodesk Website [9] Building Information Modelling Execution Planning Guide 2010 The Computer Integrated Construction Research Group The Pennsylvania State University [10] Masdar Overview (Web Version) Derek Gliddon – Masdar [11] Shrikant Bhuskade,” Building Information Modeling (BIM) “, International Research Journal of Engineering and Technology (IRJET), 2015, Volume: 02 Issue: 02